Tank Side Cesium Removal System Project and Technology Maturation Program - 20101

Abstract

Washington River Protection Solutions (WRPS) is the Tank Operating Contractor (TOC) for the U.S. Department of Energy-Office of River Protection (DOE-ORP) on the Hanford Site. The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. WRPS is in the process of designing the Tank Side Cesium Removal (TSCR) system to produce a Low Activity Waste (LAW) feed from existing mixed Hanford tank waste. The LAW will be transferred to the Waste Treatment and Immobilization Plant (WTP) LAW Vitrification Facility, where it will be immobilized in a durable glass waste form for disposal. The TSCR Project demonstrates a tank-side treatment system for providing feed to the WTP LAW Vitrification Facility. This system removes undissolved solids and cesium from tank waste supernatant using non-elutable ion exchange media to meet the applicable waste acceptance criteria for the WTP. In support of the project, technology testing has been performed to answer design questions and reduce risk. The project scope and technology testing approach are presented. (authors)

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Landon, Matthew, Ard, Kevin, Chamberlain, Blake, Herman, David T., McCabe, Daniel, Peterson, Reid, Schonewill, Philip, Pegg, Ian, Wilson, Rob, Smith, Sahid. 2020-07-01. Tank Side Cesium Removal System Project and Technology Maturation Program - 20101. https://www.osti.gov/biblio/23030370

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗