Savannah River Remediation (SRR) manages and operates the liquid waste facilities at Savannah River Site (SRS) for the Department of Energy (DOE). Stored liquid waste is a complex mixture of insoluble solids (sludge) and soluble salts in an alkaline solution. SRR has deployed the Tank Closure Cesium Removal (TCCR) system, a tank-side ion exchange process, to remove radioactive cesium from salt waste and enable onsite disposal of the resulting decontaminated salt solution as low-level waste at the Saltstone facilities. The TCCR system consists of two prefilters, four ion exchange (IX) columns, one resin trap, and a ventilation system. The IX process uses a form of inorganic crystalline silicotitanate (CST), which has a high affinity for cesium and other alkali metals, strontium, and actinides. This process is currently deployed utilizing salt feed from Tank 10, with future plans to dissolve solid salt in Tank 9 and transfer the salt solution to Tank 10 for processing through TCCR. The feed for TCCR must be created from salt-cake in Tank 10 through a dissolution process. Once enough salt has been dissolved, a qualification process is entered. This process characterizes the feed and ensures the cesium loading on the columns will not cause boiling of waste within the columns during or after processing. Once the batch has been qualified, salt waste is fed to the TCCR system through a transfer pump in the center of the tank. The waste is filtered through a set of two shielded, dead-end prefilters that prevent solids buildup in the columns. The filtered salt solution then travels to the shielded IX columns, which can be operated individually or in series, where the cesium is sorbed on the CST media. The decontaminated salt solution (DSS) then travels through a resin trap and out of the module to Tank 11. TCCR has successfully processed approximately 795,000 L of Tank 10H radioactive salt waste over two batches to date. There has not yet been a system induced shutdown. The prefilters performed as expected with only minor degradation in recovery of differential pressure after a backflush sequence. The time between backflushes decreased as each batch reached the end of processing. The hydraulics in the IXCs mostly performed as expected at all flow rates, except for one IXC that will be further investigated during Batch 3 processing. The TCCR system has shown some opportunities for more efficient processing during the length of the demonstration so far. For future processing of material from Tank 9H through Tank 10H and the TCCR unit, TCCR 1A will implement changes to the prefilters and the IXCs. The prefilters will have an increased surface area and a new filter media in an effort to increase time between filter swaps and improve backwashing cleaning capability. The IXCs will have a reduced diameter to allow for increased heat transfer out of the column and increased loading of Cs-137. Additionally, a new form of CST with an increased kinetic performance is being investigated for use during TCCR 1A operation. (authors)

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Seeley, R. A., Fellinger, T. L., Silker, A. I., Luzzatti, A. M., Voegtlen, R. O., Arthur, G. C.. 2020-07-01. TCCR Operational Summary and Optimization for Tank 9 Processing - 20314. https://www.osti.gov/biblio/23030490

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗