DOE OSTI · 2323320
Sludge Batch 11 Assembly: Tank 15
Abstract
Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 15 characterization analyses in support of Sludge Batch 11 (SB11) assembly. This report provides important characterization of the slurry in Tank 15 prior to transfer from Tank 15 to Tank 13 (prior to sending to Tank 51) in order to demonstrate that the transfer is "Low Rem" and ensure the sludge concurs with the estimated transfer mass for the SB11 recipe. A total of 3 sets of Tank 15 samples were delivered to SRNL from December 2022 to August 2023. The individual sets of composite samples were analyzed for density, weight percent solids, chemical composition, radionuclides, and/or supernate corrosion control tests.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Dekarske, John R.. 2024-03-13. Sludge Batch 11 Assembly: Tank 15. https://doi.org/10.2172/2323320. https://searchnasa.com/record/osti%3A2323320/sludge-batch-11-assembly-tank-15
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.