Abstract

RHIC Run 23 used Gold beam from Tandem with an AGS extraction energy of 9.8 GeV. The same basic setup, 8 single bunch transfers from the Booster and a 12-6 merge in the AGS to provide 4 bunches at extraction, had been used before to deliver Tandem Au to RHIC. But in those cases, it was used for low energy runs (3.85 GeV in 2021 and 5.75 GeV in 2020) where extraction was below transition energy (7.9 GeV). Tandem beam was used for this run because the intensity and stability of EBIS Au did not meet the requirements for RHIC. Physics was first declared in RHIC on May 22 nd and on August 1 st the run was cut short by about 2 months due to a major failure in RHIC. Prior to the advent of EBIS as the preinjector in 2012, 9.8 GeV Tandem Au was regularly delivered to RHIC but the setup in the Booster and AGS was quite different: Four Booster transfers of 6 bunches each were merged into 4 bunches using a 24-12-4 merge scheme. The supercycle length was 6.0 sec before June 29 th when it was extended to 6.6 sec to accommodate EBIS commissioning. The Tandem, Booster, and AGS were on user 1 for the 9.8 GeV setup. Some work with EBIS Au 32+ took place on EBIS, Booster, and AGS user 5 using the standard 9.8 GeV injector setup with a 4 to 1 merge in Booster and a 6-3-1 type merge in AGS. The Siemens motor generator was used for the entire run. An intensity limit of 8.0e9 Au 77+ ions in the AGS was in effect during the run to protect the J7 plunging stripping foil and the Copper absorber of the AGS beam dump. This corresponds to a merged bunch intensity limit of 2.0e9 Au 77+ ions for 4 equal intensity bunches. The per bunch intensity limit can be increased to 2.67e9 by reducing the number of BtA transfers from 8 to 6. There was also a Booster Late intensity limit of 16e9 Au ions in effect to protect the BtA stripping foil from damage due to overheating. Lowering the number of transfers also makes this limit less of a constraint. BtA foil 5, which was installed in 2020 and had not been used regularly prior to this run was used all run and showed no obvious signs of deterioration. In May, a Tandem Au 3.85 GeV setup from 2021 was also re-established on AGS user 2. It was used for APEX on May 24 and July 26. Initial work with 3.85 GeV beam was on May 19. Proton beam was also set up during the run and extracted to W dump on July 10. It was used for APEX on July 12. Although the OPPIS source was used the AGS setup was without snakes.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Zeno, Keith. 2024-03-25. The 2023 Gold Run in the Injectors. https://doi.org/10.2172/2331237

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗