Search NASA⌕ Search

DOE OSTI · 2340850

Risk-based System Upgrade Planning for AOT-IC Presentation [Slides]

Abstract

The number of deployed systems and different HW/SW form factors makes it difficult to maintain a complete understanding of their health which leads to a reduced level of certainty when assessing risk and trying to prioritize system upgrade efforts. AOT-IC must constantly plan and execute system upgrade and replacement projects to ensure the longevity of the control system. There are many more projects needed than the group can realistically accomplish given schedule and resource constraints. The group must prioritize their upgrade projects to choose only the highest priority projects to execute each year. Currently plans upgrade and replacement projects based on alignment with mission needs, group vision, resource availability, and qualitative risk assessments based on SME estimates. The group maintains a risk register. This is useful as a tool for shaping strategic planning but currently lacks the quantitative data and process needed to generate accurate risk assessments.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Hatch, Christopher Douglas. 2024-04-19. Risk-based System Upgrade Planning for AOT-IC Presentation [Slides]. https://doi.org/10.2172/2340850

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗