DOE OSTI · 2350965
Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility
Abstract
The original goals of this project were to advance the development and demonstration of the Biphasic CO 2 Absorption Process (BiCAP) technology for CO 2 capture from waste-to-energy (WTE) generation at a 2.5 tonne per day (TPD) engineering scale. This project has primarily focused on the basic design of the 2.5 TPD pilot system within the inside battery limits pertaining to CO 2 capture. The project also conducted a preliminary techno-economic analysis (TEA) for BiCAP at a scale of 100,000 tonne per year (TPY) of CO 2 capture and a preliminary life cycle analysis (LCA) with a primary focus on the environmental impacts related to global warming potential.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Lu, Yongqi. 2024-05-15. Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility. https://doi.org/10.2172/2350965
Cite the original work for its findings. Save a collection to share your selection of sources.