Search NASASearch

DOE OSTI · 2352275

Sludge Batch 11 Assembly: Tank 35

Abstract

Savannah River Mission Completion Nuclear Safety and Engineering Integration (SRMC-E) has requested that Savannah River National Laboratory (SRNL) perform Tank 35 characterization analyses in support of Sludge Batch 11 (SB11) assembly. Two Tank 35 samples were delivered to SRNL and composited into a single sample in April 2023. The composite sample was analyzed for the following: density, weight percent solids, chemical composition, radionuclides, supernate corrosion control tests, and x-ray diffraction for burkeite, gibbsite, and boehmite.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Craig, Georgiaanne, Dekarske, J. R.. 2024-05-20. Sludge Batch 11 Assembly: Tank 35. https://doi.org/10.2172/2352275

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W