PacWave South SeaRAY k2 Risk Registers

Abstract

The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides robust, new capabilities for customers in the maritime environment. Failure Modes, Effects, and Criticality Analysis (FMECA) is conducted to systematically identify all potential failure modes and their effects on the system, and to analyze the criticality of each risk based on the likelihood of the event and the severity of the impact. Actions may then be recommended to mitigate the criticality of a risk, either by reducing the likelihood of the risk or the severity of its impact. Risk assessment is executed iteratively as an integral part of the design process. By incorporating risk assessment early in the development cycle, mitigation of risk can be achieved cost effectively. The actions recommended to mitigate risk may be subsequently executed, and as the design progresses the risk assessment is reviewed and revised. Review of the risk assessment is integrated into structured design reviews, ensuring that critical risks are comprehended and that the Project will not progress to e.g. fabrication while intolerable risks remain. The risk assessment process results in the population and maintenance of Risk Registers (RRs). Each major system (and as needed, subsystem) will have a distinct RR. This allows each system or subsystem to be assessed individually, rendering the RRs to a manageable size for review.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Lenee-Bluhm, Pukha. 2023-09-29. PacWave South SeaRAY k2 Risk Registers. https://doi.org/10.15473/2356829

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Applied Research and Development to Support Open-Water Testing at PacWave

This report presents the findings from Task 7 of the project, which focused on improving the performance and reliability of wave energy converters (WECs) under real-world conditions, particularly in the presence of marine growth (biofouling) and system faults. The work was conducted using the RM3 point absorber WEC model, a marine current turbine based on the SHARKS project model, and the WEC-Sim simulation platform, and it included both modeling and control system development.

16 TIDAL AND WAVE POWER↗

Power performance and loads characterization of laboratory-scale cross-flow rotors fabricated using additive manufacturing

Tidal energy conversion is a relatively new application for additive manufacturing (AM), where the focus has been on fabricating axial-flow turbine blades. AM techniques add material precisely where it is needed, creating more complex shapes with less waste. Cross-flow rotor geometry presents an opportunity for AM to improve rotor performance by fabricating features that cannot be created economically via conventional manufacturing. The challenges associated with using AM in cross-flow design include water resistance and degradation over time while retaining a level of quality equivalent to conventionally machined parts. In this work, AM materials were tested by environmentally conditioning samples in a seawater tank for 5 months, followed by performance and phase-resolved load testing of laboratory-scale rotors in a hydraulic flume. We found that while metals like titanium and Inconel have excellent performance in marine environments, achieving the desired geometry and performance is difficult. Thermoplastics degraded in seawater but were easier to form into desired geometries and could exceed the performance of an aluminum control rotor. Warping and surface finish were significant detractors from AM rotor performance. These results suggest that the primary benefits of using AM for cross-flow rotors is to quickly fabricate and test unconventional rotor geometries.

16 TIDAL AND WAVE POWER↗