Search NASA⌕ Search

DOE OSTI · 2397230

Status of ICARUS NUMI Interaction Cross-Section Analysis

Abstract

The ICARUS experiment, utilizing Liquid Argon Time Projection Chamber (LAr TPC) technology, has been installed at Fermilab in Chicago, Illinois, following its initial operation in Italy and subsequent refurbishment at CERN. ICARUS completed commissioning in June 2022. Currently, the experiment is in the phase of analyzing data from its two runs of physics data acquisition and gearing up for the third run. While its primary objective is to function as the far detector of the Short Baseline Neutrino program (SBN), seeking sterile neutrino signatures, ICARUS also offers diverse physics capabilities, including searches beyond the standard model and measurements of cross-sections. In addition to being exposed to the common Booster Neutrino (BNB) beamline, ICARUS also receives off-axis neutrinos from the Main Injector (NuMI) beam. Due to the off-axis angle between NuMI and ICARUS, coupled with contributions from both pion and kaon decays to neutrino fluxes, interactions of NuMI neutrinos within ICARUS can be detected over a range of several GeV in energy. These interactions present opportunities for crucial cross-section measurements and model tests within an energy range that overlaps both the SBN oscillation search and a portion of the DUNE spectrum. This poster presentation will delve into our efforts to conduct a muon-neutrino cross-section measurement, where the signal is defined by events with no pions produced in the final state of the interaction, along with some preliminary muon-neutrino inclusive measurements. Additionally, it will provide updates on the current status and future plans, including reconstruction, selection, and analysis procedures.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Roy, Promita, Betancourt, Minerba, Howard, Bruce, Kim, Jaesung, Moreno, Guadalupe, Smedley, Jack. 2024-07-11. Status of ICARUS NUMI Interaction Cross-Section Analysis. https://doi.org/10.2172/2397230

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗