DOE OSTI · 2397240
Warm Unit Stand Assembly and Testing for Proton Improvement Plan - II
Abstract
The Proton Improvement Project II (PIP II), situated at Fermilab, signifies a critical advancement in the realm of high-energy physics. PIP II, a linear accelerator renovation endeavor, aspires to double the output of the existing proton beam, reinforcing Fermilab’ s position as a vanguard in this field. The proton beam's creation involves a series of high-frequency cryomodules, necessitating environmental temperature arrays of magnets and vacuum pumps henceforth described as ‘Warm Units.’ The Warm Units include design features of : 1. insertion between the cryomodules, 2. multi-stage adjustments in six degrees of freedom to ensure precise beam alignment; 3. Natural frequency modes that avoid specified ranges. In adherence to Fermilab’ s stringent safety standards, comprehensive testing procedures are slated to validate the Warm Units' capacity to simultaneously achieve local alignment adjustments while averting low-frequency oscillation less than 15 Hertz. The testing regimen will scrutinize the Warm Units' alignment adjustment capabilities and their resilience against low-frequency oscillations, with an overarching objective of satisfying the Final Design Review criteria specific to the PIP II initiative. This project works to furnish technicians responsible for the assembly of Warm Units with a comprehensive guide for successful installation, concurrently documenting any requisite design modifications essential for achieving a real-world configuration.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
English, Chris. 2024-03-01. Warm Unit Stand Assembly and Testing for Proton Improvement Plan - II. https://www.osti.gov/biblio/2397240
Cite the original work for its findings. Save a collection to share your selection of sources.