DOE OSTI · 2425857
Remote Power Distribution Prototyping for Bergoz ACCT
Abstract
The objective of this project focuses on the design and construction of remote power distribution to the Bergoz ACCT amplifier module. Responsibilities included designing a prototype amplifier placeholder using SketchUp, 3D printing it using PrusaSlicer, and mounting the placeholder inside a junction box with 35 mm DIN rail. Wiring was run through a penetration in a wall inside the accelerator building to the Tevatron to keep all electronics outside the radioactive enclosure. A Power over Ethernet switch was set up for remote power distribution to the amplifier. This project ensures that the amplifier module can be effectively integrated and managed within Fermilab's infrastructure once it is procured.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Flores, Nathan, Ibrahim, Michelle A.. 2024-07-29. Remote Power Distribution Prototyping for Bergoz ACCT. https://doi.org/10.2172/2425857
Cite the original work for its findings. Save a collection to share your selection of sources.