DOE OSTI · 2426310
Quality Guidelines for Energy System Studies: Carbon Dioxide Transport and Storage Costs in NETL Studies
Abstract
Transport, storage, and combined T&S costs are reported in this guideline as first-year break even (FYBE) costs in real 2023 dollars per metric ton (tonne) (2023$/tonne). These FYBE costs are from the perspective of a CO 2 pipeline project owner and/or a CO 2 saline storage project owner, and represent a minimum price the owner(s) can charge a CO 2 capture project owner over 30 operating years to transport and/or store a tonne of CO 2 and remain economically viable.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Warner, Travis, Vikara, Derek, Morgan, David, Grant, Timothy. 2024-07-31. Quality Guidelines for Energy System Studies: Carbon Dioxide Transport and Storage Costs in NETL Studies. https://doi.org/10.2172/2426310
Cite the original work for its findings. Save a collection to share your selection of sources.