Status of the Ce+BAF project
Abstract
Jefferson Lab is proposing to add positron beams to the 12 GeV Continuous Electron Beam Accelerator Facility (CEBAF). A team of accelerator and nuclear scientists was formed in 2018 to develop the physics case as well as a concept for the generation, production and delivery of Continuous (CW) polarized positron beams to the experimental halls, up to the full 12 GeV. A layout of the proposed concept will be shown. We will report on the ongoing efforts in the positron generation and capture, target design, beam transport and expected properties of the e+ beam on the experimental targets at 12GeV. This project is supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177