Search NASA⌕ Search

DOE OSTI · 2439273

Interface Box for Dual Power Amplifier Modulators in Main Injector

Abstract

The Proton Improvement Plan II (PIP-II) aims to enhance the current Fermilab particle accelerator complex to intensify and accelerate more beam. The project will power the beam as it heads from Illinois to the Deep Underground Neutrino Experiment (DUNE) in South Dakota by providing them with neutrinos. To intensify the beam, one of the PIP-II upgrades is to add a second power amplifier (PA) to the existing Main Injector cavities. In turn, this boosts the maximum output power to 400kW per station even though the PIP-II requirement is only 240kW. With more output power, more protons can be accelerated through the particle accelerator and in the case of the DUNE project, this is ideal given that the chance of a neutrino interacting with a proton or a neutron is one in ten billion. The power amplifier is added to the cavity and driven by the modulator. Within the modulator, the control unit receives input signals from the power supplies, moderates they are working properly, and controls the timing of the power up sequence. However, a challenge imposed by an additional PA was that the control unit could only read signals coming from the previous power supplies but not the additional second set. For this reason, the interface box was designed to facilitate the issue.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Ayala, Diana, Stevenson, Susanna M.. 2024-09-03. Interface Box for Dual Power Amplifier Modulators in Main Injector. https://www.osti.gov/biblio/2439273

Cite the original work for its findings. Save a collection to share your selection of sources.