Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Abstract

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Ojo, Yemi [Idaho National Laboratory (INL), Idaho Falls, ID (United States)], Shafiul Alam, S M [Idaho National Laboratory (INL), Idaho Falls, ID (United States)] (ORCID:0000000262769443), Yan, Weihang [National Renewable Energy Laboratory (NREL), Golden, CO (United States)], Gevorgian, Vahan [National Renewable Energy Laboratory (NREL), Golden, CO (United States)], Balliet, Hill [National Renewable Energy Laboratory (NREL), Golden, CO (United States)]. 2024-12-18. Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower. https://doi.org/10.2172/2500383

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

Staying Current: A Community Readiness Framework for Marine Energy Applied to River Current Energy in Alaska

Marine energy-including wave, tidal, and river current energy-can provide a local energy source for rural and remote communities. Marine energy has the potential to bolster self-sufficiency and create economic opportunities while preserving ecological integrity. Communities may be interested in deploying, testing, and advancing these early-stage technologies to meet their needs. However, limited capacity, workforce constraints, and other barriers can challenge development. To better understand a community's interest in and preparedness for marine energy, we developed a suite of 150 'metrics of readiness.' Organized across seven categories-technical, social, environmental, strategic, governance, economic, financial-and 29 subcategories, the metrics provide a holistic perspective beyond the technical aspects of an energy device. We conducted a desktop application of the metrics of readiness for Igiugig, Alaska. The metrics were applied retrospectively for two points in time: before (2009) and after (2018) in-stream testing of a river current energy device. By documenting changes among categories and subcategories of the metrics, our results show the evolving nature of community readiness for river current energy. They also illustrate how our interdisciplinary framework captures the investment in environmental effects research and commitment to strategic planning that occurred in Igiugig. In future applications, we envision the framework could be used to foster public engagement in marine energy, collaborate with communities in project development, shape capacity building activities, prioritize investments, and inform research needs. While our study focuses on enabling river current energy in Alaska, the metrics of readiness have the potential to inform implementation of other renewable technologies with communities in new geographies.

13 HYDRO ENERGY↗