Search NASA⌕ Search

DOE OSTI · 2504607

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Abstract

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL) Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems. The National Emission Standard for Hazardous Air Pollutants (NESHAP [40 Code of Federal Regulations 61, Subpart H]) requires an assessment of all emission units that have the potential for radionuclide air emissions. Emission units are registered with the State of Washington. Potential emissions from emission units are assessed annually by PNNL staff. Sampling, monitoring, and other regulatory compliance requirements are designated based on the potential to-emit dose criteria, a graded approach to facility-identified potential impact categories, and regulatory requirements. The purpose of this document is to describe the facility radionuclide air emission sampling program and provide current and historical facility emission unit system performance, operation, and design information. For sampled emission units, the building, exhaust unit, control technologies, and sample extraction details are provided. Additionally, applicable configuration drawings, figures, and photographs are included. For non-sampled emission units, emission estimation and radionuclide source details are provided. Site-wide permits for the lowest potential impact category are described. Deregistered/transitioned emission unit details are also provided as necessary for at least 5 years post-closure/transition. Currently, five emission units are sampled continuously for particulate radionuclides at PNNL managed facilities on the PNNL-Richland campus (3 of the 5) and on the Hanford Site (2 of the 5). Four of these units have sampling systems that comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1–2011 standard for sampling from stacks and ducts of nuclear facilities, and the fifth is grandfathered and compliant with the older ANSI N13.1–1969 standard. In addition, the PNNL-managed Hanford Site 325 Building EP 325-01-S stack is sampled continuously for emissions of tritium. No emissions sampling is required for the single licensed emission unit on the PNNL-Sequim campus.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Klein, Michael C. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)], Ramos Sanchez, Sergio G. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)], Snyder, Sandra F. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)] (ORCID:0000000158261324), Barnett, John M. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)] (ORCID:0000000153810064). 2025-01-01. Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems. https://doi.org/10.2172/2504607

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Water4Energy Step-1 Band-M Ready-to-Train Samples for TVA Weeks-to-Years Prediction, Version 0

AI-ready Band-M (monthly) labelled training pack for the Water4Energy Genesis Task-1 project on weeks-to-years prediction of Tennessee Valley temperature and precipitation. The deposit includes leakage-aware issue-time samples (samples_M_v0.nc; N=486), train-only scalers, issue-time split table, supporting monthly panels, and Python generation scripts to recreate the pack from the companion Tier-1 raw observation collection (https://doi.org/10.13139/ORNLNCCS/3398576). Each sample pairs a 12-month lookback of teleconnection indices and SST box anomalies with TVA-mean ERA5 anomaly targets (t2m, tp, msl) at leads 1–3 months.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, particle analysis

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, time bins

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗