Analytical and Performance-Based Evaluation Alternatives to Full-Scope, High-Fidelity Testbeds

Abstract

One consequence the design and operational differences of advanced reactors is that integrated system validation (ISV) using full-scope, high-fidelity testbed might not be cost-justified or practical. The absence of traditional ISV may pose an issue for the conduct of safety evaluations since it may leave regulators without the information derived from this performance-based testing. The purpose of this research is to identify analytical and performance-based test and evaluation methods that are alternatives to full-scope, high-fidelity testbeds that have traditionally been used for ISV. We developed a method to test validation based on a multi-stage validation (MSV) framework. MSV is an approach to meeting validation objectives through incremental, successive validation activities beginning in the early stages of the design process and continuing through the later stages. MSV doesn't rely solely on late stage validation, rather it accommodates the use of a broad spectrum of analytical and performance-based information and a diversity of testbeds. In addition, MSV embraces the use of information from other types of evaluations and analyses.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

O'Hara, John [Brookhaven National Laboratory (BNL), Upton, NY (United States)] (ORCID:0009000946112597). 2025-02-19. Analytical and Performance-Based Evaluation Alternatives to Full-Scope, High-Fidelity Testbeds. https://doi.org/10.2172/2529383

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

ZiaCore Critical Experiment Demonstrates Key Technologies for Nuclear Energy Systems

ZiaCore is a LANL Laboratory Directed Research and Development (LDRD) project focused on developing and demonstrating key technologies for future nuclear energy systems. The project itself was split into three tasks: 1) Design of the ZiaCore Reactor, a UO2 fueled, graphite and zirconium-hydride (ZrH) moderated, heat pipe cooled micro-reactor 2) Development of the ZrH and heat pipes components 3) Performance of a critical experiment with a representative portion of the ZiaCore reactor incorporating the ZrH and heat pipes developed and made at LANL.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗