A Participation Factor-Based Approach for Defining the EMT Model Boundary for Power System Simulations with Inverter-Based Resources

Abstract

The increasing penetration of inverter-based resources (IBRs) introduces new challenges to power system simulations, particularly with the emergence of fast electromagnetic transient (EMT) dynamics and sub-synchronous oscillations (SSO) that require time-consuming EMT simulations. To reduce the time cost for simulating a large-scale power grid with IBRs, this paper proposes a novel participation factor-based approach for defining a critical zone for detailed EMT modeling and simulations, which includes the IBRs, synchronous generators, and the network components participating significantly in simulated contingencies. Both model-based and response-based methods are introduced for the estimation of participation factors (PFs). The case study on the 240-bus Western Electricity Coordinating Council (WECC) system demonstrates that the EMT zone determined by the proposed approach can effectively capture power system dynamics involving IBRs.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Sajjadi, Mahsa, Xia, Tianwei, Xiong, Min, Sun, Kai, Hoke, Andy (ORCID:0000000267917812), Wang, Bin, Tan, Jin (ORCID:0000000205997730). 2025-03-10. A Participation Factor-Based Approach for Defining the EMT Model Boundary for Power System Simulations with Inverter-Based Resources. https://doi.org/10.1109/iecon55916.2024.10905745

Cite the original work for its findings. Save a collection to share your selection of sources.