DOE OSTI · 2560754
ATR Fuel Management
Abstract
The sixth Core Internals Changeout (CIC) of ATR was completed on March 21, 2022, and Nuclear Testing (NT) commenced shortly thereafter. In support of NT, 235U flux wires were attached to flux wands using electrical tape and installed in water channels 2, 6, 11, 15 and 19 in each of the 40 ATR Mark VII fuel elements that comprise an ATR core to perform low power flux measurements during ATR Cycle 170CIC NT-3. The flux wands were fabricated from Poly (Methyl Methacrylate), or PMMA. Irradiated cobalt capsules were loaded in the ATR Northeast Irradiation Housing Assembly (NEIHA), the East Flux Trap (EFT), South Flux Trap (SFT), inboard A-positions and various H-positions as a 170CIC NT-3 core reactivity hold-down mechanism. The PMMA flux wands received significant gamma dose from the irradiated cobalt during NT-3 which caused discoloration, embrittlement and swelling of the flux wands. The removal of the degraded flux wands from the 0.078 in. wide by 50 in. long fuel element coolant channels has been a unique challenge. This presentation summarizes the cleaning techniques used to remove the flux wand debris from the elements, an aggressive PMMA irradiation experiment performed concomitantly with initial cleaning efforts, and planned inspection and qualification techniques that will be applied in the future to potentially requalify the impacted elements for re-use.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Curnutt, Bryon J. 2022-10-11. ATR Fuel Management. https://www.osti.gov/biblio/2560754
Cite the original work for its findings. Save a collection to share your selection of sources.