Search NASA⌕ Search

DOE OSTI · 2570494

Capture Cavities For The Cw Polarized Positron Source Ce + baf

Abstract

The initial design of the capture cavities for the continuous wave (CW) polarized positron beams at Jefferson Lab (Ce + BAF) is presented. A chain of standing wave multi-cell copper cavities inside a solenoid tunnel are selected to improve the positron capture efficiency. The cavity design strategy is presented to accommodate constrains from the large phase distribution of the incident beams, RF power and RF heating. A matrix of design parameters’ range are given for future system optimization when the capture cavities are considered together with other sub-systems and beam dynamics. The contents will also be useful for other CW cavity design for beams with large phase space distribution.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Wang, Shaoheng [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Ushakov, Andriy [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Grames, Joseph [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Raut, Nabin [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Rimmer, Robert [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Roblin, Yves [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Wang, Haipeng [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)]. 2024-12-18. Capture Cavities For The Cw Polarized Positron Source Ce + baf. https://doi.org/10.1051/epjconf%2F202431502009

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗