Spallation Neutron Source Proton Power Upgrade (PPU) Project: Lessons Learned for CD-4

Abstract

The SNS PPU project goals were to design, build, install and test the equipment necessary to double the accelerator power from 1.4 MW to 2.8 MW and to deliver a 2.0 MW qualified target. PPU also included the provision of a stub-out in the SNS accumulator-ring-to-target tunnel to facilitate a rapid connection to a new proton beamline for the Second Target Station (STS) project. The power capability was doubled by increasing the proton beam energy by 33% and the peak beam current by 50%, relative to pre-PPU accelerator performance. The project also included modifications to some buildings and services. The PPU project accomplished the energy upgrade by fabricating and installing new superconducting radiofrequency (RF) cryomodules, with supporting RF equipment, in the existing linac tunnel and klystron gallery, respectively. The High Voltage Converter Modulators (HVCM) and klystrons for some of the existing installed RF equipment were upgraded to handle the higher beam current. The increased beam power of 2 MW on the First Target Station (FTS) was enabled by the addition of a new high-volume gas injection system for pressure pulse and cavitation mitigation in the mercury target and a redesigned mercury target vessel.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Champion, Mark [Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)] (ORCID:0000000257422568), Cain, Wendy [Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)]. 2025-04-01. Spallation Neutron Source Proton Power Upgrade (PPU) Project: Lessons Learned for CD-4. https://doi.org/10.2172/2573159

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗