DOE OSTI · 2589172
Floating Offshore Wind US Manufacturing and Commercialization (CRADA Final Report)
Abstract
Create a detailed manufacturing, assembly, load-out, transportation, upending, turbine integration, and offshore transportation plan for a hypothetical project in one of the California lease areas off the central coast. Develop a detailed schedule and cost estimation for each step of the process and compare with conventional floating platform designs.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Cooperman, Aubryn [National Renewable Energy Laboratory (NREL), Golden, CO (United States)], Mulas Hernando, Daniel [National Renewable Energy Laboratory (NREL), Golden, CO (United States)], Riccobono, Nick [National Renewable Energy Laboratory (NREL), Golden, CO (United States)], Kanner, Sam [Aikido Technologies, San Francisco, CA (United States)]. 2025-09-16. Floating Offshore Wind US Manufacturing and Commercialization (CRADA Final Report). https://doi.org/10.2172/2589172
Cite the original work for its findings. Save a collection to share your selection of sources.