DOE OSTI · 3016250

UNIFI Specifications for Grid-Forming Inverter-Based Resources: Version 3

Abstract

The UNiversal Interoperability for grid-Forming Inverters (UNIFI) Consortium addresses fundamental challenges facing the integration of grid-forming (GFM) inverters in electric grids alongside rotating machines and other inverter-based resources (IBRs). This document defines a set of UNIFI specifications for GFM IBRs that provides requirements from both a power system level as well as functional requirements at the inverter level that are intended to provide means for the vendor-agnostic operation of GFM IBRs at any scale in electric power systems.

Explore related subjects

Keep this discovery

BibTeXRIS

Kroposki, Ben [National Laboratory of the Rockies, Golden, CO (United States)]. 2026-01-30. UNIFI Specifications for Grid-Forming Inverter-Based Resources: Version 3. https://doi.org/10.2172/3016250

Cite the original work for its findings. Save a collection to share your selection of sources.

Discover connections

Connections use source metadata and explicit phrase matches, not verified experimental comparisons.

KEEP EXPLORING

Related discoveries

Commercial and Industrial Energy Procurement in Nigeria: A Consumer's Guidebook

Across Africa, countries have incorporated a variety of new energy sources into their energy mix to account for increasing demand. In Nigeria, electricity consumption per capita has grown nearly 50% in the past 20 years. To address rising demand for energy in Nigeria, the country has passed several recent policies and regulations aimed at increasing energy generation across the country, improving the country's transmission infrastructure, and ensuring that electricity reliably reaches end users, including commercial and industrial (C&I) customers. This guidebook is designed for C&I customers in Nigeria to use in the consideration of procuring such onsite, captive energy systems to supplement their energy needs. Each section of this guidebook touches on a step of the procurement process and details the relevant stakeholders, processes, and data needed to make decisions during that step.

14 SOLAR ENERGY

A Sensitivity-driven Wide Area Protection (SWAP) Coordination Tool for High Penetration of Inverter-based Resources (IBR)

Traditionally, power system generation sources have been composed of synchronous generators, of which the fault current behavior is understood with minimal differences between generation size and types due to the physics of their construction. Present protection schemes and modeling methods are based upon these understood characteristics. Most renewable generation is composed of inverter-based resources (IBR), in which fault current is determined by switching control software and hardware limitations, each of which can vary between manufacturers and even between models of the same manufacturer. The resulting fault current is low in magnitude, low in negative-sequence current, unpredictable phase angles, and is a challenge to model. These characteristics also result in a challenge to traditional protection schemes and fault simulation software. To address several of these concerns, the project has the following goals: 1. Improve IBR models: Improve IBR models used in short circuit (SC) programs to accurately capture the response of IBRs at the bulk power system (BPS) level for fault and protection studies. 2. Develop automation tool: Develop an automation tool that allows engineers to identify protection coordination and sensitivity issues by performing SC and protection coordination studies in a high IBR-penetrated grid by applying variations to the IBR models, faults, contingencies, etc. 3. Develop schemes: Develop new protection mitigation solution schemes that complement the existing protection systems to ensure safe operation of the BPS with higher IBR penetration levels. The project team did not achieve this final goal, as the Department of Energy (DOE) stopped the project early due to changes in DOE funding priorities. The termination notice came at the beginning of the final project phase, while the team was identifying and beginning to investigate protection issues. It should be noted that the team discussed a 100% penetration scenario. However, this scenario would require the use of grid-forming IBR models that are not presently available. Since developing these models requires additional effort, the 100% penetration scenario was not pursued during this project. In the future, developing the methodology and models for the 100% scenario could benefit the industry.

14 SOLAR ENERGY