Achievement in Beam Power Records for the NOvA Target System

Abstract

We began updating the NOvA target system for 1-Mega Watt (1-MW) beam operation in 2017. Major changes include maintaining the quality of neutrino beams with reliable instrumentation, reducing instantaneous beam heating on the target, increasing cooling power to handle the high power beam, and controlling tritium water production rate. We successfully achieved a onehour beam power report of 1.018 MW in Summer 2024. This achievement marks an important milestone for Fermilab, demonstrating the capability of the accelerator complex to handle highintensity proton beams at a fast repetition rate. We are now prepared to proceed with a new accelerator upgrade plan, known as the Accelerator Complex Evolution - Main Injector Ramp and Targetry R&D (ACE-MIRT) to support future operates at beam power exceeding 2 MW for the Long Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE). We present the improvement of the target system to exceed the beam power 1-MW.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Yonehara, Katsuya [Fermilab] (ORCID:0000000254404153), Wickermasinghe, Athula [Fermilab]. 2024-12-17. Achievement in Beam Power Records for the NOvA Target System. https://doi.org/10.22323/1.476.0231

Cite the original work for its findings. Save a collection to share your selection of sources.