Search NASA⌕ Search

DOE OSTI · 3027657

Validation Testing for Molten Chloride Reactor Experiment Equipment Removal and Disposal Techniques

Abstract

The Molten Chloride Reactor Experiment (MCRE) will be the first reactor featuring a fast-spectrum molten chloride circulating nuclear fuel system in the world. Planning for equipment removal and disposal (ERD) of MCRE has identified several technology gaps due to the unique environment of this nuclear experiment. Some of the gaps arise from the application of existing disassembly and/or sizing methods to novel material forms or in novel configurations. Others arise from unknown material behavior. This paper summarizes proposed test plans for ERD validation experiments to address these complicated or unknown equipment removal procedures. At the Waste Management Symposia in 2024, the Idaho National Laboratory (INL) MCRE ERD team presented the challenges associated with hosting multiple nuclear experiments in series with only brief transition periods between systems. Such difficulties include higher dose rates, the presence of radioisotopes infrequently encountered in reactor decommissioning and radioactive waste management, lack of intrinsic remote-operations infrastructure in the test bed, space constraints in the test bed, and contamination minimization requirements. To address these challenges, remote or semi-remote technologies are planned to be implemented in a non-hot cell environment with limited space availability. The team also discussed how a systems engineering approach is being used for conceptual development and design of equipment removal systems to address these challenges. For example, to reduce constraints for the removal of more difficult components, non-activated, noncontaminated elements are planned to be taken out first where possible. Still, there are complexities associated with the remaining components. In this work, the operational framework for MCRE ERD was reviewed for technical gaps and open questions, and test plans were drafted to address these areas. The tests plans were written for the following categories: vision systems, pipe cutting, drill/grout/filler, flush salt, and miscellaneous, with the miscellaneous group consisting of tests like techniques for removing bearings and reflector bricks. The test plans explore material, infrastructure, and staffing requirements needed for test execution. The test plans additionally focus on the evaluation of success. Determining the outcome of a test is imperative - as these explorative actions have the potential to rearrange or re-scope planned ERD activities. Success criteria identified thus far include required tool output, required area(s), debris production and mitigation, and repeatability. Test plans are an essential aspect of the systems engineering approach to MCRE ERD. They are used as the beginning steps in defining use cases for the ERD system. Performance of the validation tests is expected to begin in the summer of 2025 and will take approximately 9 to 12 months to complete. Execution of these plans will be expedited by specifying test needs ahead of time, facilitating efficient interactions with any subcontractors tasked with running the requested tests. Evaluating the outcomes of these tests will inform MCRE ERD procedures and timing and will also identify additional technical constraints for the MCRE ERD System. This upfront process optimization effort will help the project save time and resources at the end of the experiment.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Sarah, Heagy, [University of California, Berkeley] (ORCID:0009000585940943), Kitcher, Evans Damenortey [Idaho National Laboratory] (ORCID:0000000285819028), Welty, Brett D [Idaho National Laboratory], Woolf, Mitchell S [Idaho National Laboratory] (ORCID:0000000212052110), Smith (Reactor Proj Engineering - U790), Andrew J [Idaho National Laboratory] (ORCID:0000000311461198), King, James A [Idaho National Laboratory] (ORCID:0000000337284759), Smith, Nicholas Vise [Idaho National Laboratory], Clark, Benjamin Douglas [Idaho National Laboratory], Yancey Spencer, Kristy Diane [Idaho National Laboratory] (ORCID:0000000304480411). 2025-03-09. Validation Testing for Molten Chloride Reactor Experiment Equipment Removal and Disposal Techniques. https://www.osti.gov/biblio/3027657

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

A Benchmarking Framework for Evaluating Large Language Model Capabilities in Nuclear Reactor Safety Applications

Large language models (LLMs) are increasingly capable of answering technical questions, synthesizing domain knowledge, and supporting engineering workflows. For nuclear science and engineering, these capabilities require careful, domain-specific evaluation before they can be credibly incorporated into safety-related activities, regulatory review, or technical decision support. This paper presents preliminary results from benchmarking framework for evaluating LLM capabilities in nuclear contexts. The framework is organized into three evaluation categories: nuclear fundamentals, general dual-use knowledge, and plant specific knowledge. These categories are intended to distinguish general nuclear engineering competence from broader technical reasoning and more context-dependent nuclear knowledge. Initial evaluations focus on nuclear fundamentals using questions representative of the knowledge expected of a nuclear professional engineer. Results indicate that contemporary frontier models perform at a high level and substantially exceed the performance of older model generations, with some models approaching saturation of the current benchmark. These findings suggest both the rapid improvement of LLM capabilities in specialized technical domains and the need for more discriminating evaluation methods. The paper presents the benchmark structure, preliminary model-comparison results, and ongoing work. This work supports development of verifiable, responsible, and safety-conscious methods for assessing AI systems in nuclear engineering applications.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

MARVEL Lessons Learned – 2026 Edition Fabrication, Fuel Procurement, Quality Assurance, and Safety Basis

The Microreactor Applications Research Validation and Evaluation (MARVEL) project is intended to be among the first U.S. advanced reactor demonstrations in four decades. By virtue of being sponsored directly by the U.S. Department of Energy (DOE), the reactor is expected to benefit the broader nuclear community by exercising design processes, safety reviews, and supply chains. This project is committed to publicly documenting key lessons learned along the way toward demonstration. Building on a 2025 report that focused on lessons learned from guard vessel fabrication and Primary Coolant Apparatus Test (PCAT) testing (Abou-Jaoude et al. 2025), this 2026 edition captures findings spanning structural fabrication, quality assurance (QA), reactivity control system (RCS) assembly, fuel fabrication and shipment, safety basis development, balance-of-plant design, and overall reactor design.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

MARVEL Reactor Digital Engineering Developments

The MARVEL reactor project has served to introduce a new generation of engineers to the processes required to transform a reactor design from simply an idea on paper into what will be an approved, constructed, and operational nuclear power system. Much as there have been advances in materials, analysis, and evaluation methodologies over the 50 years since the last reactor was built at INL, so too has the technology for managing the engineering process itself advanced. Digital Engineering tools and methods provide improved coordination between previously siloed engineering disciplines, reduced burdens of non-value-added data transcription processes and bring forward insights and improvements that might otherwise fall later in the design stage, where changes are much more costly. While the tools and techniques to support the full digital engineering vision are not yet complete, the MARVEL design processes provide valuable demonstrations and validations of key aspects and illuminate further areas for implementation by subsequent projects.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗