Data Analytics Methods to Measure Plant Outage Resilience

Abstract

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Mandelli, Diego [Idaho National Laboratory] (ORCID:0000000293542233). 2026-05-08. Data Analytics Methods to Measure Plant Outage Resilience. https://www.osti.gov/biblio/3362935

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Alchemy: A Model-Based Approach for 2D to 3D Autonomous Nuclear System Design

Engineering design of nuclear power plant (NPP) piping and equipment systems frequently bypasses crucial 2D system planning, instead moving straight to 3D modeling. This often leads to designs that exceed building envelope constraints, forcing expensive and time-consuming redesigns. When 2D modeling is employed, it typically involves labor-intensive manual workflows that convert 2D drawings into 3D models, resulting in inefficiencies and errors across design iterations. These workflows further suffer from poor software interoperability and dependence on proprietary software ecosystems, thereby contributing to schedule delays and cost overruns. This paper presents Alchemy, an autonomous framework that transforms 2D system definitions into Industry Foundation Classes (IFC)-compliant 3D building information models (BIMs) for expediting nuclear facility design at the conceptual preliminary phase. Using a model-based approach, the framework treats the 2D system diagram as the central reference model employed to automatically generate all subsequent outputs, ensuring consistency between the system definition and the resulting physical design. A web-based interface enables engineers to define hierarchical system topologies including associated equipment, geometric properties, and connectivity requirements. A two-phase equipment layout optimization algorithm automatically computes collision-free spatial configurations within predefined building envelopes. An artificial intelligence (AI)-assisted pipe routing module then generates orthogonal, collision-free routing paths, allowing the user to select either an A* search-based method or an Ant Colony Optimization (ACO)-based method. All outputs are authored natively in IFC format, relying on open-source technologies and standardized formats in order to ensure extensibility and eliminate proprietary software dependencies. The proposed framework is validated on two representative pressurized-water reactor (PWR)-based case studies, for which it autonomously generates IFC-compliant 3D models in minutes, drastically reducing workflows that typically require hours of manual effort. The generated model demonstrates topologically correct equipment placement, physically plausible spatial relationships, and collision-free pipe routing consistent with known PWR loop configurations. This work represents a foundational step toward digital engineering for nuclear facility preliminary design, with future ongoing development targeting design code compliance and expanded system complexity.

97 - MATHEMATICS AND COMPUTING↗