Abstract
This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Okwen, Roland [Univ. of Illinois at Urbana-Champaign, IL (United States); Illinois State Geological Survey, Champaign, IL (United States)] (ORCID:0000000322964065), Carman, Carl [Univ. of Illinois at Urbana-Champaign, IL (United States); Illinois State Geological Survey, Champaign, IL (United States)] (ORCID:0009000752212143). 2026-06-09. Storage Field Development Plan: One Earth Energy. https://doi.org/10.2172/3367395
Cite the original work for its findings. Save a collection to share your selection of sources.