Abstract

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Dhakal, Rabin [Electric Power Research Inst. (EPRI), Palo Alto, CA (United States)] (ORCID:0000000305475294), Li, Wayne [Electric Power Research Inst. (EPRI), Palo Alto, CA (United States)], Buch, Kushal [Electric Power Research Inst. (EPRI), Palo Alto, CA (United States)]. 2026-06-26. Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR). https://doi.org/10.2172/3375617

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Heliostat sizing methodology for concentrating solar thermal industrial process heat projects

This study presents a method to obtain a heliostat size that minimizes the levelized cost of heat (LCOH) of a heliostat-based concentrating solar thermal system for applications of solar heating for industrial processes at operating temperatures from 565 to 1550°C. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model to supplement the previously developed cost models, which we update to reflect current pricing trends. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWh th . Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the LCOH, producing a characteristic U-shaped trend with a robust near-optimal window of 7-20 m 2 ; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats being deployed at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY

A Sensitivity-driven Wide Area Protection (SWAP) Coordination Tool for High Penetration of Inverter-based Resources (IBR)

Traditionally, power system generation sources have been composed of synchronous generators, of which the fault current behavior is understood with minimal differences between generation size and types due to the physics of their construction. Present protection schemes and modeling methods are based upon these understood characteristics. Most renewable generation is composed of inverter-based resources (IBR), in which fault current is determined by switching control software and hardware limitations, each of which can vary between manufacturers and even between models of the same manufacturer. The resulting fault current is low in magnitude, low in negative-sequence current, unpredictable phase angles, and is a challenge to model. These characteristics also result in a challenge to traditional protection schemes and fault simulation software. To address several of these concerns, the project has the following goals: 1. Improve IBR models: Improve IBR models used in short circuit (SC) programs to accurately capture the response of IBRs at the bulk power system (BPS) level for fault and protection studies. 2. Develop automation tool: Develop an automation tool that allows engineers to identify protection coordination and sensitivity issues by performing SC and protection coordination studies in a high IBR-penetrated grid by applying variations to the IBR models, faults, contingencies, etc. 3. Develop schemes: Develop new protection mitigation solution schemes that complement the existing protection systems to ensure safe operation of the BPS with higher IBR penetration levels. The project team did not achieve this final goal, as the Department of Energy (DOE) stopped the project early due to changes in DOE funding priorities. The termination notice came at the beginning of the final project phase, while the team was identifying and beginning to investigate protection issues. It should be noted that the team discussed a 100% penetration scenario. However, this scenario would require the use of grid-forming IBR models that are not presently available. Since developing these models requires additional effort, the 100% penetration scenario was not pursued during this project. In the future, developing the methodology and models for the 100% scenario could benefit the industry.

14 SOLAR ENERGY

Technoeconomic Analysis Round Robin of a Retrofit of the Ivanpah Concentrating Solar Plant with a Molten-Salt System with Thermal Energy Storage

While the fidelity of technoeconomic analysis (TEA) models for concentrating solar thermal systems has improved in recent years, there is a lack of consensus on the specific inputs used to forecast performance of a newly built tower system due to a lack of validations and post-mortems available to the public. This effort is a joint initiative between multiple international organizations to validate and compare their TEA models. The specific case study is a proposed retrofit of one unit of the Ivanpah Solar Energy Generating System to include molten-salt storage, replacing the steam generation system with a molten-salt receiver, salt-to-steam heat exchanger train, and new balance of plant while keeping the existing steam turbine, solar field, and interconnection in place, using plant data for calibration. This manuscript discusses several of the agreed-upon assumptions for this study as well as a preliminary analysis from prior work that motivates the study.

14 SOLAR ENERGY