DOE OSTI · 3377487
Preparing For Advanced Air Mobility: A System-Level Framework For Infrastructure, Investment, and Deployment
Abstract
Advanced air mobility (AAM) is moving from demonstration toward early deployment, supported by a growing national strategy that outlines how these systems may evolve across airspace, infrastructure, and operations. As this transition takes shape, a more practical question comes into focus: what does it mean to be ready? This paper introduces a Capability Maturity Model (CMM) as a structured way to think about that challenge. Rather than treating readiness as a fixed condition, it frames it as a progression - one that develops across multiple, interdependent domains over time.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Maurer, Wesley [National Laboratory of the Rockies, Golden, CO (United States)]. 2026-06-24. Preparing For Advanced Air Mobility: A System-Level Framework For Infrastructure, Investment, and Deployment. https://www.osti.gov/biblio/3377487
Cite the original work for its findings. Save a collection to share your selection of sources.