DOE OSTI · 3383644
Design progress for the 22 GeV CEBAF energy upgrade
Also available from
Abstract
In this work we examine the progress made in the design of the proposed FFA upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF). This proposed upgrade will double the number of passes through the two linacs by replacing the two highest energy arcs with new Fixed Field Alternating Gradient (FFA) arcs, roughly doubling the energy. These FFA arcs will use permanent magnets in a Halbach configuration to shape their fields. The design involves new optics for the linacs and remaining electromagnetic arcs, as well as new electromagnetic separators. These feed into the permanent magnet FFA arcs. We also report on ongoing studies of the dynamics of the beams, and an experiment to measure the effects of radiation on the permanent magnets.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Nissen, E. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Bogacz, A. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Coxe, A. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Seryi, A. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Gamage, B. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Khan, D. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Neththikumara, I. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Deitrick, K. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Sereno, N. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Kazimi, R. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Ruber, R. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Bodenstein, R. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Ogur, S. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Satogata, T. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Roblin, Y. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)], Trbojevic, D. [Brookhaven National Laboratory (BNL), Upton, NY (United States)], Berg, J. [Brookhaven National Laboratory (BNL), Upton, NY (United States)], Brooks, S. [Brookhaven National Laboratory (BNL), Upton, NY (United States)], Hoffstaetter, G. [Cornell Univ., Ithaca, NY (United States)], Morozov, V. [Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)]. 2026-01-28. Design progress for the 22 GeV CEBAF energy upgrade. https://doi.org/10.18429/jacow-napac2025-wezn01
Cite the original work for its findings. Save a collection to share your selection of sources.