Integrating AI Data Centers with the Power Grid

Abstract

The rapid expansion of artificial intelligence (AI) has triggered an unprecedented surge in electricity demand, with US data center energy use projected to double or triple 2023 levels by 2028. This exponential growth places strain on grid infrastructure, which can hinder timely construction of desired computing capacity. To bridge this supply-demand gap, utilities and AI developers are increasingly turning to demand flexibility, a strategy that incentivizes shifting or reducing power use during peak periods of grid stress. Data centers are uniquely equipped for flexible operations due to their digital workloads, built-in redundancy, and onsite energy assets. This article outlines four primary mechanisms to enable data center flexibility: computational load flexibility (shifting tasks temporally or geographically), flexible use of core facility infrastructure adjustments, energy storage utilization, and onsite electricity generation. To encourage adoption, utilities are deploying new tariff designs, including voluntary interruptible service riders, mandated flexibility requirements, and streamlined interconnection processes for flexible loads. For the highly capitalized and rapidly growing AI industry, the primary motivators for embracing these strategies are expediting facility interconnection, satisfying emerging regulatory mandates, and mitigating community resistance. While demand flexibility cannot substitute the long-term need for new bulk power generation, it serves as an essential, immediate solution for enabling near-term deployment. By transforming data centers from grid stressors into stabilizing assets, flexible operations can ensure reliable grid integration, ease market pressures, and support a resilient power system.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Granderson, Jessica [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)], Hoffman, Ian [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)], Holecek, Billie [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)], Crowe, Eliot [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)], Smith, Sarah [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)], Frick, Natalie Mims [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)]. 2026-05-08. Integrating AI Data Centers with the Power Grid. https://www.osti.gov/biblio/3393683

Cite the original work for its findings. Save a collection to share your selection of sources.

Discover connections

Connections use source metadata and explicit phrase matches, not verified experimental comparisons.

KEEP EXPLORING

Related reports

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗