Search NASASearch

DOE OSTI · 3484553

Mark-18A Target Material Recovery Program: Initial Hot Startup

Abstract

The Savannah River National Laboratory (SRNL) has been tasked by the National Nuclear Security Administration to recover highly valued isotopes from irradiated Mark-18A (Mk-18A) targets. The Savannah River Site (SRS) has sixty-five Mk-18A targets available for the recovery of the high valued materials. The Mk-18A targets were manufactured with Pu-242 then irradiated under high neutron flux in K-Reactor at the SRS from 1968 to 1978. The sixty-five Mk-18A targets are currently stored in the SRS L-Area Basin and will be removed one at a time and individually transported to SRNL. Upon receipt at SRNL, the Mk-18A target material will be removed from the confinement, dissolved, chemically separated, and calcined to a stable oxide. The flowsheet is designed to recover the plutonium as well as the trivalent actinides. The original targets were manufactured with varying quantities of Pu-242, ranging from 5.2 grams to 121.5 grams. Taking a graded approach to process start up, the lowest loaded target (FT-80-03) was selected as the first target to be received and processed at SRNL. As operational experience and knowledge is gained from processing targets, higher loaded targets will be selected for processing to increase the quantities of valuable isotopes recovered. Due to dose concerns, the receipt and processing of the Mk-18A targets is performed in the SRNL Shielded Cells Facility. The targets are stored in a double J-can confinement in the L-Area Basin. A specially designed cask was procured for transport of the targets from L-Area to SRNL. Once received at SRNL, the targets are loaded into the back of Cell 7 and resized as they enter the cell. The resized targets (1/4 length) are then processed one at a time through the following processes: caustic dissolution and filtration, acidic dissolution and filtration, elutable Reillex anion exchange, diglycolamide (DGA) resin extraction, and DGA calcination. This processing results in two product streams. The first is an aqueous plutonium solution which is removed from the shielded cells and taken to a glovebox for further purification and conversion to an oxide. The second is a calcined oxide product containing the Am and Cm as well as other lanthanide fission products which is removed from the shielded cells using a bagless transfer system. Both materials are packaged for shipment to Oak Ridge National Laboratory (ORNL). This paper will discuss the operating experience, lessons learned, and results from initial process hot startup.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Armstrong, Christopher [Savannah River National Laboratory (SRNL), Aiken, SC (United States)], Fairchild, Drew [Savannah River National Laboratory (SRNL), Aiken, SC (United States)], King, William [Savannah River National Laboratory (SRNL), Aiken, SC (United States)], Louis-Jean, James [Savannah River National Laboratory (SRNL), Aiken, SC (United States)], Mills, Matthew [Savannah River National Laboratory (SRNL), Aiken, SC (United States)] (ORCID:0009000483993235), Taylor-Pashow, Kathryn [Savannah River National Laboratory (SRNL), Aiken, SC (United States)] (ORCID:0000000219860866), Uba, Samuel [Savannah River National Laboratory (SRNL), Aiken, SC (United States)], Williams, Matthew [Savannah River National Laboratory (SRNL), Aiken, SC (United States)]. 2026-03-12. Mark-18A Target Material Recovery Program: Initial Hot Startup. https://www.osti.gov/biblio/3484553

Cite the original work for its findings. Save a collection to share your selection of sources.