Joint scheduling of energy, fast and primary frequency response reserves in integrated transmission–distribution networks

Abstract

Inverter-based distributed energy resources (DERs) connected to distribution networks (DNs) can provide fast frequency support, but their reserve deliverability depends on feeder constraints and differs from synchronous primary frequency response (PFR). Existing transmission–distribution coordination studies usually treat reserve generically or neglect feeder-level feasibility, while frequency-security scheduling studies rarely represent distribution feeders explicitly. This paper develops a bi-level day-ahead scheduling framework for integrated transmission–distribution networks that jointly clears energy, transmission-side PFR, and distribution-side fast frequency response (FFR) under exogenous hourly inertia and largest-loss inputs from an external unit commitment (UC) schedule. The transmission problem is modeled with DC-optimal power flow (OPF) and closed-form second-order cone (SOC) frequency-security constraints, whereas each DN is represented by a reserve-aware branch-flow AC-OPF so that scheduled fast reserves remain deliverable during activation. The bi-level problem is reformulated through Karush–Kuhn–Tucker (KKT) conditions into a mixed-integer SOC program, and a penalty term is used to tighten the distribution-network relaxation. In the reduced test system, lower exogenous inertia increased the required primary response from 179.64 MW to 191.08 MW, distribution-side fast response reduced total frequency-response procurement by up to 4.9%, and neglecting distribution constraints overstated the combined distribution-side energy and reserve award by up to 18%. In the expanded study, the largest case was solved in 2.02 s with a 0.00% optimality gap. Time-domain simulations kept the frequency nadir above 59.0 Hz in all tested hours. These results demonstrate the value of fast-response modeling and distribution-feasible reserve delivery in coordinated market clearing.

Keep this discovery

BibTeXRIS

Noh, Seung-Gil, Heleno, Miguel, Choi, Woo Yeong, Kim, Yun-Su. 2026-04-01. Joint scheduling of energy, fast and primary frequency response reserves in integrated transmission–distribution networks. https://doi.org/10.1016/j.ijepes.2026.111892

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related discoveries

How Distributed Energy Resources Can Support Resilience in Utility Distribution Networks

The goal of this webinar is to engage with electric utilities in the Midwest, particularly small public utilities, to understand the industry's needs for science tools to plan for winter resilience in the future, designing tools that will benefit electric power resilience in all communities. Michigan Tech leads this project with partners from multiple academic, government, and industry groups and asked NLR to present on DERs and laboratory tools and resources.

24 POWER TRANSMISSION AND DISTRIBUTION

Netload Range Cost Curves for Coordinated Transmission-Distribution Planning Under DER Growth Uncertainty

The increasing penetration of distributed energy resources (DERs) requires better coordination between transmission and distribution (T&D) planning to ensure system security and cost efficiency. However, misaligned planning horizons, computational burdens, and privacy concerns hinder effective coordination, leading to either underutilized resources caused by overinvestments or reliability risks due to underinvestment. To address this challenge, we introduce netload range cost curves (NRCCs), a novel approach for managing long-term DER growth uncertainty through T&D coordination, while preserving existing data-sharing and regulatory structures. NRCCs provide pairs of (i) peak substation netload guarantees and (ii) corresponding distribution upgrade options and costs, enabling their seamless integration into transmission planning workflows. To compute NRCCs efficiently, we develop a transmission-aware distribution network planning (TADNP), which is subsequently integrated to an iterative computation procedure. These NRCCs are then embedded into an NRCC-informed transmission planning model to enable resource-efficient coordination. We illustrate our proposed approach with a case study based on realistic distribution and transmission systems in the San Francisco Bay Area, California. Our results indicate the possibility of dramatic savings in transmission investments by incorporating the proposed NRCC-integrated T&D coordination framework.

Li, Yujia