NuMI Graphite Target Fin Removal Assembly

Abstract

Materials scientists want to study the irradiated graphite target from the Neutrino at the Main Injector (NuMI) beam line. In order to gather these irradiated graphite fins from the target canister, it will have to be done remotely. Therefore, a removal assembly will need to be created in order to do this efficiently and well. This project aims to make progressive steps towards deploying the final target removal assembly. Furthermore, calculations related to the removal assembly design were done, and tests were planned to discover further information about the feasibility of this design. The main result from this project is the deflection of the cantilever arm, which is 0.354 inches due to the weight of the beam and cutting tool. Additionally, more results of this project are the testing assembly CAD model and the feasibility of design. This project concludes that there is still more work that needs to be done for the removal assembly to be deployed, but there were foundational steps that were made in the implementation of this design. Finally, there should be further steps and tests to determine the feasibility of this removal assembly.

Keep this discovery

BibTeXRIS

Malovski, Azra [NIU, DeKalb], Paley, Bill [Fermilab]. 2026-09-01. NuMI Graphite Target Fin Removal Assembly. https://doi.org/10.2172/3625648

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related discoveries

Tailored Solvent Treatment for Optimized Production of Upcycled Anodes from End-Of-Life Li-Ion Batteries

Recycling processes for lithium-ion batteries typically overlook graphite because of its lower market value relative to that of transition-metal-containing cathode materials. However, graphite recovered from cycled lithium-ion batteries holds additional engineered value associated with the solid-electrolyte interphase (SEI). The SEI contributes critical electronic passivation of the graphite surface but becomes highly resistive with extended cycling, yielding poor cell performance. In this work, we apply tailored solvent treatment to end-of-life (EOL) graphite anodes to selectively remove adverse SEI components while retaining beneficially passivating species. We evaluate a series of polar protic solvents to achieve targeted removal of SEI components and control selectivity through rational variation in solvent properties. The physiochemical properties of treatment solvents correlate with both the retained SEI composition and the corresponding electrochemical performance of solvent-treated “upcycled” graphite anodes. Within the initial set of solvents evaluated, top-performing candidates show capacity and Coulombic efficiency nearly equivalent to those of an analogous pristine anode, as well as promising electrochemical performance enhancement with regard to irreversible capacity-loss metrics. This study establishes critical design principles for an optimized anode upcycling method that enhances the value of recycled graphite by retaining and upgrading the SEI.

25 ENERGY STORAGE

Physical thickness characterization of the FRIB production targets

The FRIB heavy-ion accelerator, commissioned in 2022, is a leading facility for producing rare isotope beams (RIBs) and exploring nuclei beyond the limits of stability. These RIBs are produced via reactions between stable primary beams and a graphite target. Approximately 20–40% of the primary beam power is deposited in the target, requiring efficient thermal dissipation. Currently, FRIB operates with a primary beam power of up to 20 kW. To enhance thermal dissipation efficiency, a single-slice rotating graphite target with a diameter of approximately 30 cm is employed. The effective target region is a 1 cm-wide outer rim of the graphite disc. To achieve high RIB production rates, the areal thickness variation must be constrained within 2%. This paper presents physical thickness characterizations of FRIB production targets with various nominal thicknesses, measured using a custom-built non-contact thickness measurement apparatus.

Instrumentation for radioactive beams (fragmentati

Equivalent System Mass Comparison of ECLSS CO2 Removal Technologies

This project employs equivalent system mass (ESM) analyses to evaluate and compare state-of-the-art spacecraft CO2 removal systems. The ESM methodology converts sizing characteristics such as volume, power, and cooling requirements into a unified metric of mass, allowing for simple quantitative comparison of equipment impacts on a system level. Comparison of six high TRL technologies – the Carbon Dioxide Removal System (CDRS), Thermal Amine Scrubber (TAS), Carbon Dioxide Removal Assembly (CDRA), Four-Bed CO2 Scrubber (4BCO2), CO2 and Humidity Control Swing Bed (CHC), and the Carbon Dioxide Removal by Ionic Liquid Sorbent (CDRILS) – was achieved using an existing ESM spreadsheet tool that formerly ranked such technologies for consideration on Gateway. Fidelity of the tool was increased through revision with the most up-to-date sizing and performance data for each technology. ESM values were then estimated using NASA-supplied Lunar, Martian, and low-Earth orbit habitat infrastructure costs. This paper details the ESM approach used, lists major performance variables for each CO2 removal option, and summarizes conclusions of the technology comparison. The results are intended to act as a guide to assist programs in their selection of CO2 technologies best suited for a specific vehicle or mission.

Madeleine C Oliver