A Review of the Current Landscape of Distributed Wind Interconnection Standards

Abstract

The source did not provide an abstract. Follow the original record for more information.

Keep this discovery

BibTeXRIS

Louie, Melissa (ORCID:0009000846036427), Bastian, Liliana (ORCID:000000025749449X), Darbali-Zamora, Rachid (ORCID:000000024772719X). 2026-05-01. A Review of the Current Landscape of Distributed Wind Interconnection Standards. https://www.osti.gov/biblio/3710706

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related discoveries

Experimental Validation of a Modular All-Electric Power Take-Off Topology for Wave Energy Converter Enabling Marine Renewable Energy Interconnection

Power electronic converters are an enabling technology for the emerging marine energy applications, such as using ocean waves to produce electricity. This paper outlines the power take-off system and its key components used in a wave energy converter offering modularity and scalability to generate power efficiently. The proposed power take-off system was implemented based on a modular multilevel converter and could be deployed to convert any alternating current electrical energy to a different alternating current for interconnection to grid or non-grid applications. Examples of widespread deployment are supplying electricity to coastal communities or producing clean drinking water. The analysis using both the simulation tests and laboratory experiments verified the design objectives and basic functionality of the developed power take-off system. An acceptable response using a field programmable gate array-based controlled laboratory testbench was achieved, complying with guidelines specified in the prevalent industry standards. Seamless operation during steady-state and transients for the studied wave energy converter was achieved as supported by the obtained results. The key findings of this work were experimentally examined under different load conditions, direct current bus voltage fluctuations, and generator speed–torque regulation. The ability of the power take-off system to generate high-power quality of the waveforms, e.g., against adhering to the IEEE 519-2022 standard for total harmonic distortion limits, is also confirmed.

Engineering

A review of United States energy-only generator interconnection service policy and considerations for reform

Grid interconnection has emerged as a significant obstacle to the development of new electricity resources. There is growing interest in energy-only interconnection, which is an interconnection service option meant to allow the interconnection of new generators without ensuring their energy deliverability during all hours through the transmission system to customers. This approach potentially avoids upfront congestion-related transmission upgrades but could increase curtailment risk. Interest in energy-only interconnection is shaped by incomplete understanding of how interconnection policy functions in different jurisdictions, a knowledge gap that makes it difficult to determine how energy-only interconnection might be better used or re-designed. In this paper, we provide a regulatory review of energy-only interconnection in U.S. interconnection policy and practice, identifying jurisdictions in which rules are close to -or farther from-the theoretical concept of energy-only interconnection service. We find substantial jurisdictional differences in how energy-only interconnection is implemented, driven by differences in resource adequacy frameworks, real-time transmission operations, and state-level procurement practices. U.S. regulators have preferred local jurisdictional flexibility over federal prescription of interconnection study methods and procedures, which also contributes to differences among regions. Such findings raise fundamental questions about whether competition policies in electricity markets should extend beyond spot energy markets and into more prescriptive guidelines around interconnection rules and market entry. This paper sheds light on tensions that energy-only interconnection raises in allowing generators to access the transmission system on an as available basis and discusses how controlling thresholds for congestion-related network upgrades may be a barrier to electricity market entry.

Gorman, Will

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.