DOE OSTI · 920012

Thinking Inside the Box

Abstract

In early 2007, SLAC was faced with a shortage of both electrical power and cooling in the main computer building, at the same time that the BaBar collaboration needed a new cluster of 250 batch machines installed. A number of different options were explored for the expansion. Provision of additional electrical power to the building was estimated to take one to two years, and cost several million dollars; additional cooling was even worse. Space in a Silicon Valley co-location facilities was reasonable on a one-year timescale, but broke even in costs by the end of three years, and were more expensive after that. There were also unresolved questions about the affects of additional latency from an offsite compute cluster to the onsite disk servers. The option of converting existing experimental hall space into computer space was estimated at one year, with uncertain availability. An option to aggressively replace several existing clusters with more power-efficient equipment was studied closely, but was disruptive to continued operations, expensive, and didn't provide any additional headroom. Finally, the installation of a Sun Project Blackbox (PBB) unit was selected as providing the capacity on a timescale of six months for a reasonable cost with minimal disruption to service. SLAC obtained and installed a beta unit and have been running it in production since September 2007. The experiences described are with the Early Access version of the PBB. The production version of the box has engineering changes based in part on our experiences.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Boeheim, Charles T. 2007-11-16. Thinking Inside the Box. https://searchnasa.com/record/osti%3A920012/thinking-inside-the-box

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗