Abstract
Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project, Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to conduct testing to demonstrate the performance of the WTP Pretreatment Facility (PTF) leaching and ultrafiltration processes at an engineering-scale. In addition to the demonstration, the testing was to address specific technical issues identified in Issue Response Plan for Implementation of External Flowsheet Review Team (EFRT) Recommendations - M12, Undemonstrated Leaching Processes.( ) Testing was conducted in a 1/4.5-scale mock-up of the PTF ultrafiltration system, the Pretreatment Engineering Platform (PEP). Parallel laboratory testing was conducted in various PNNL laboratories to allow direct comparison of process performance at an engineering-scale and a laboratory-scale. This report presents and discusses the results of those tests.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Kurath, Dean E, Hanson, Brady D, Minette, Michael J, Baldwin, David L, Rapko, Brian M, Mahoney, Lenna A, Schonewill, Philip P, Daniel, Richard C, Eslinger, Paul W, Huckaby, James L, Billing, Justin M, Sundar, Parameshwaran S, Josephson, Gary B, Toth, James J, Yokuda, Satoru T, Baer, Ellen BK, Barnes, Steven M, Golovich, Elizabeth C, Rassat, Scot D, Brown, Christopher F, Geeting, John GH, Sevigny, Gary J, Casella, Amanda J, Bontha, Jagannadha R, Aaberg, Rosanne L, Aker, Pamela M, Guzman-Leong, Consuelo E, Kimura, Marcia L, Sundaram, S K, Pires, Richard P, Wells, Beric E, Bredt, Ofelia P. 2009-12-23. Pretreatment Engineering Platform Phase 1 Final Test Report. https://doi.org/10.2172/970760
Cite the original work for its findings. Save a collection to share your selection of sources.