DOE OSTI · 972701
105-H Reactor Interim Safe Storage Project Final Report
Abstract
The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Ison, E G. 2008-11-08. 105-H Reactor Interim Safe Storage Project Final Report. https://doi.org/10.2172/972701. https://searchnasa.com/record/osti%3A972701/105-h-reactor-interim-safe-storage-project-final-report
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.