DOE OSTI · 973978
EFRT M-12 Issue Resolution: Solids Washing
Abstract
Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes” of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Baldwin, David L, Schonewill, Philip P, Toth, James J, Huckaby, James L, Eslinger, Paul W, Hanson, Brady D, Kurath, Dean E, Minette, Michael J. 2010-01-01. EFRT M-12 Issue Resolution: Solids Washing. https://doi.org/10.2172/973978. https://searchnasa.com/record/osti%3A973978/efrt-m-12-issue-resolution-solids-washing
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.