Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) Model

Abstract

The Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) model quantifies the behind-the-meter (BTM) electrical upgrades required for decarbonization through electrification by comparing the expected change in capacity requirements from the electrification technologies to the existing capacity in distributed energy resources (DER) stock (including buildings).