DOE OSTI · code-125350
Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) Model
Abstract
The Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) model quantifies the behind-the-meter (BTM) electrical upgrades required for decarbonization through electrification by comparing the expected change in capacity requirements from the electrification technologies to the existing capacity in distributed energy resources (DER) stock (including buildings).
Keep this discovery
Explore connections, maps & timelines
Yoder, Tim. 2024-03-22. Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) Model. https://doi.org/10.11578/dc.20240322.1
Cite the original work for its findings. Save a collection to share your selection of sources.