Search NASA⌕ Search

DOE OSTI · code-125350

Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) Model

Abstract

The Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) model quantifies the behind-the-meter (BTM) electrical upgrades required for decarbonization through electrification by comparing the expected change in capacity requirements from the electrification technologies to the existing capacity in distributed energy resources (DER) stock (including buildings).

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Yoder, Tim. 2024-03-22. Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) Model. https://doi.org/10.11578/dc.20240322.1. https://searchnasa.com/record/osti%3Acode-125350/behind-the-meter-infrastructure-costs-for-electrification-progression-bicep-model

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.