Search NASA⌕ Search

SEARCH · Search NASA

Results for “Administration and Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Status of the DOE /STOR/-sponsored national program on hydrogen production from water via thermochemical cycles

A pure thermochemical cycle is a system of linked regenerative chemical reactions which accepts only water and heat and produces hydrogen. Thermochemical cycles are potentially a more efficient and cheaper means of producing hydrogen from water than is the generation of electricity followed by electrolysis. The Energy Storage Systems Division of the Department of Energy is currently funding a national program on thermochemical hydrogen production. The National Aeronautics and Space Administration is responsible for the technical management of this program. The goal is to develop a cycle which can potentially operate with an efficiency greater than 40% using a heat source providing a maximum available temperature of 1150 K. A closed bench-scale demonstration of such a cycle would follow. This cycle would be labeled a 'reference cycle' and would serve as a baseline against which future cycles would be compared.

Baker, C. E.↗

Operations manual: Vertical Motion Simulator (VMS) S.08

The Ames Research Center Vertical Motion Simulator (VMS) is described in terms useful to the researcher who intends to use it. A description of the VMS and its performance are presented together with the administrative policies governing its operation. The management controls over its use are detailed, including data requirements, user responsibilities, and scheduling procedures. This information is given in a form that should facilitate communication with the NASA operations group during initial simulator use.

Jones, A. D.↗

The Senior Executive Service

A major innovation of the Civil Service Reform Act of 1978 was the creation of a Senior Executive Service (SES). The purpose of the SES is both simple and bold: to attract executives of the highest quality into Federal service and to retain them by providing outstanding opportunities for career growth and reward. The SES is intended to: provide greater authority in managing executive resources; attract and retain highly competent executives, and assign them where they will effectively accomplish their missions and best use their talents; provide for systematic development of executives; hold executives accountable for individual and organizational performance; reward outstanding performers and remove poor performers; and provide for an executive merit system free of inappropriate personnel practices and arbitrary actions. This Handbook summarizes the key features of the SES at NASA. It is intended as a special welcome to new appointees and also as a general reference document. It contains an overview of SES management at NASA, including the Executive Resources Board and the Performance Review Board, which are mandated by law to carry out key SES functions. In addition, assistance is provided by a Senior Executive Committee in certain reviews and decisions and by Executive Position Managers in day-to-day administration and oversight.

Source record↗

ASK Talks With Joseph Rothenberg

Recently retired NASA administrator Joseph Rothenberg reflects on project management during the Apollo era at the start of his career, as well as the history of, and changes in, project management over his years at NASA. He concludes by describing what he sees as NASA's most important needs in the near future.

Rothenberg, Joseph↗

Taguchi Approach to Design Optimization for Quality and Cost: An Overview

Calibrations to existing cost of doing business in space indicate that to establish human presence on the Moon and Mars with the Space Exploration Initiative (SEI) will require resources, felt by many, to be more than the national budget can afford. In order for SEI to succeed, we must actually design and build space systems at lower cost this time, even with tremendous increases in quality and performance requirements, such as extremely high reliability. This implies that both government and industry must change the way they do business. Therefore, new philosophy and technology must be employed to design and produce reliable, high quality space systems at low cost. In recognizing the need to reduce cost and improve quality and productivity, Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) have initiated Total Quality Management (TQM). TQM is a revolutionary management strategy in quality assurance and cost reduction. TQM requires complete management commitment, employee involvement, and use of statistical tools. The quality engineering methods of Dr. Taguchi, employing design of experiments (DOE), is one of the most important statistical tools of TQM for designing high quality systems at reduced cost. Taguchi methods provide an efficient and systematic way to optimize designs for performance, quality, and cost. Taguchi methods have been used successfully in Japan and the United States in designing reliable, high quality products at low cost in such areas as automobiles and consumer electronics. However, these methods are just beginning to see application in the aerospace industry. The purpose of this paper is to present an overview of the Taguchi methods for improving quality and reducing cost, describe the current state of applications and its role in identifying cost sensitive design parameters.

Unal, Resit↗

The Space Exploration Initiative: a challenge to advanced life support technologies: keynote presentation

President Bush has enunciated an unparalleled, open-ended commitment to human exploration of space called the Space Exploration Initiative (SEI). At the heart of the SEI is permanent human presence beyond Earth orbit, which implies a new emphasis on life science research and life support system technology. Proposed bioregenerative systems for planetary surface bases will require carefully designed waste processing elements whose development will lead to streamlined and efficient and efficient systems for applications on Earth.

Ecological Systems, Closed↗

International Space Station Increment-6/8 Microgravity Environment Summary Report November 2002 to April 2004

This summary report presents the analysis results of some of the processed acceleration data measured aboard the International Space Station during the period of November 2002 to April 2004. Two accelerometer systems were used to measure the acceleration levels for the activities that took place during Increment-6/8. However, not all of the activities during that period were analyzed in order to keep the size of the report manageable. The National Aeronautics and Space Administration sponsors the Microgravity Acceleration Measurement System and the Space Acceleration Measurement System to support microgravity science experiments that require microgravity acceleration measurements. On April 19, 2001, both the Microgravity Acceleration Measurement System and the Space Acceleration Measurement System units were launched on STS-100 from the Kennedy Space Center for installation on the International Space Station. The Microgravity Acceleration Measurement System unit was flown to the station in support of science experiments requiring quasi-steady acceleration measurements, while the Space Acceleration Measurement System unit was flown to support experiments requiring vibratory acceleration measurement. Both acceleration systems are also used in support of the vehicle microgravity requirements verification as well as in support of the International Space Station support cadre. The International Space Station Increment-6/8 reduced gravity environment analysis presented in this report uses acceleration data collected by both sets of accelerometer systems: 1. The Microgravity Acceleration Measurement System, which consists of two sensors: the Orbital Acceleration Research Experiment Sensor Subsystem, a low frequency range sensor (up to 1 Hz), is used to characterize the quasi-steady environment for payloads and vehicle, and the High Resolution Accelerometer Package, which is used to characterize the vibratory environment up to 100 Hz. 2. The Space Acceleration Measurement System measures vibratory acceleration data in the range of 0.01 to 400 Hz. This summary report presents analysis of some selected quasi-steady and vibratory activities measured by these accelerometers during Increment-6/8 from November 2002 to April 2004.

Jules, Kenol↗

Accident Case Study of Organizational Silence Communication Breakdown: Shuttle Columbia, Mission STS-107

This report has been developed by the National Aeronautics and Space Administration (NASA) ESMD Risk and Knowledge Management team. This document provides a point-in-time, cumulative, summary of key lessons learned derived from the official Columbia Accident Investigation Board (CAIB). Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document. This report is accompanied by a video that will be sent at request

Lessons Learned↗

From Here to There - Bird's Eye Perspective on Grant Lifecycle and Administration

“What gets measured gets done ”or “measure it to manage it”. The statements have become matter of fact. However, measurement (and even metrics) alone cannot fully communicate an organization’s story without the point of accountability. As a dynamic org, we must measure what is necessary, using the appropriate lenses to analyze the most relevant information that allows robust decision-making. A key function of Program Planning and Control (PP&C) is to assist HRP in the development of such strategy that ensures the proper execution of program research goals. With introspection of the Technical Officer role as defined by 2 CFR(i.e., Part 200, Part 1800)and subsequent governance under the NASA Grant and Cooperative Agreement Manual (GCAM), we’ve realized an obvious disconnect among Principal Investigator’s (PI),technical communication with the elements and some of the administrative/fiduciary requirements that should run parallel to the science work. This find has introduced new program risks as evidenced through incomplete deliverables or other less-than-successful requirements through the lifecycle for work we fund. One solution the Grants Technical Officer proposes is for PP&C to share in the communication with stakeholders of grants administration much earlier in the award process in attempt to reduce programmatic risks; particularly in data, reporting and performance management. As such, the planned IWS 2022 session will focus on(plenary) topics that include (1) definition of the grant lifecycle, (2) anatomy of a grant(NF1687 the award document), and (3)performance measurement/post-award monitoring. As HH&P pursues its strategic objectives to evolve the directorate into a data rich and knowledge rich organization, it has become increasingly important to develop the multiple levels of insight across the program to ensure data and other reporting(qualitative/quantitative), alongside proper administration. And the desired outcome is to make certain HRP meets/exceeds the accountability standard that our research information is received, maintained and accessible in posterity.

Lucy D Barnes-Moten↗

Automated Procurement System (APS): Project management plan (DS-03), version 1.2

The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.↗

UAS Service Supplier Checkout: How UTM Confirmed Readiness of Flight Tests with UAS Service Suppliers

NASA collaborated with industry partners to develop and test the small Unmanned Aircraft System (sUAS) Traffic Management (UTM) research platform, a software prototype used for developing airspace integration requirements for sUAS operations. The lessons learned from these activities will help inform the Federal Aviation Administration (FAA) on what is needed to safely manage sUAS operations. A core component of the UTM platform is the UAS Service Supplier (USS), which acts as a communications bridge to meet the regulatory and operational requirements. As the UTM partners began USS flight tests, NASA found that it was difficult to get all USSs functioning at comparable quality levels to ensure successful flight tests. Also, NASA anticipated that the FAA would encounter similar challenges when they begin to register USSs for operational use. These realizations led to the development of USS Checkout, a set of processes and tools designed to increase flight test efficiency. We learned that a good USS Checkout process is balanced for simplicity versus test coverage, and is amenable to automation. We also learned that when USS Checkout is a USS prerequisite for flight tests, flight tests were more efficient and effective.

Smith, Irene Skupniewicz↗

Thermal Management System Trade Study for SUSAN Electrofan Aircraft

Thermal management of power system components is one of the barriers identified towards the implementation of Electrified Aircraft Propulsion architectures. This paper documents the preliminary results of a trade space exploration of thermal management systems conducted for a new National Aeronautics and Space Administration regional transport aircraft concept called the SUbsonic Single Aft eNgine (SUSAN) Electrofan. Traditional methods of thermal management are evaluated alongside newer methods, which are still in development. Mass, power, and drag for traditional liquid / air heat exchangers were calculated, along with mass and area of oscillating heat pipes for outer mold line cooling. An initial assessment of the feasibility of using the fuel as part of the thermal management system was also conducted by evaluating the temperature over the full flight profile. Preliminary results and future work are discussed.

Nic Heersema↗

Flight-Management Algorithm for Fuel-Conservative Descents

Federal Aviation Administration has developed an automated time-based metering form of air traffic control for arrivals into terminal area called local flow management/profile descent (LFM/PD). LFM/PD saves fuel by matching airplane arrival flow to airport acceptance rate through time-control computations and by allowing pilot to descend at his discretion from cruise altitude to metering fix in an idle-thrust, clean configuration (landing gear up, flaps zero, speed brakes retracted).

Knox, C. E.↗

Remote Sensing Capabilities to Detect Maritime Vessels in Distress

The National Aeronautics and Space Administration (NASA) has the responsibility for conducting research and development for search and rescue as charged under the National Search and Rescue Plan. For over two decades this task has been undertaken by the Search and Rescue Mission Office at the NASA Goddard Space Flight Center (GSFC). The technology used by the highly successful beacon locating satellite system, Cospas-Sarsat, was conceived and developed at GSFC and is managed by the National Oceanographic and Atmospheric Administration (NOAA). Using beacon-less remote sensing to find people and vessels in distress complements the demonstrated life saving capabilities of this satellite system. The Search and Rescue Mission Office has been investigating the use of fully polarimetric synthetic aperture radar to locate crashed aircraft. An overview of this effort and potential maritime applications of Search and Rescue Synthetic Aperture Radar (SAR) will be presented. The Mission Office has also developed a Laser search and rescue system called L-SAR. The prototype instrument was designed and built by SenSyTech Inc. It specifically targets the location of novel retro-reflective material easily applied to rescue equipment and vessels in distress. An overview of this effort will also be presented.

Larsen, Rudolph K.↗

Aircraft/Air Traffic Management Functional Analysis Model: User's Guide - Version 2.0

The Aircraft/Air Traffic Management Functional Analysis Model, Version 2.0 (FAM 2.0), is a discrete event simulation model designed to support analysis of alternative concepts in air traffic management and control. FAM 2.0 was developed by the Logistics Management Institute (LMI) a National Aeronautics and Space Administration (NASA) contract. This document provides a guide for using the model in analysis. Those interested in making enhancements or modification to the model should consult the companion document, Aircraft/Air Traffic Management Functional Analysis Model, Version 2.0 Technical Description.

Etheridge, Melvin↗

Web-Based Software for Managing Research

aeroCOMPASS is a software system, originally designed to aid in the management of wind tunnels at Langley Research Center, that could be adapted to provide similar aid to other enterprises in which research is performed in common laboratory facilities by users who may be geographically dispersed. Included in aeroCOMPASS is Web-interface software that provides a single, convenient portal to a set of project- and test-related software tools and other application programs. The heart of aeroCOMPASS is a user-oriented document-management software subsystem that enables geographically dispersed users to easily share and manage a variety of documents. A principle of "write once, read many" is implemented throughout aeroCOMPASS to eliminate the need for multiple entry of the same information. The Web framework of aeroCOMPASS provides links to client-side application programs that are fully integrated with databases and server-side application programs. Other subsystems of aeroCOMPASS include ones for reserving hardware, tracking of requests and feedback from users, generating interactive notes, administration of a customer-satisfaction questionnaire, managing execution of tests, managing archives of metadata about tests, planning tests, and providing online help and instruction for users.

Computer software and hardware↗

Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Evolution of Information Management at the GSFC Earth Sciences (GES) Data and Information Services Center (DISC): 2006-2007

Increasingly sophisticated National Aeronautics and Space Administration (NASA) Earth science missions have driven their associated data and data management systems from providing simple point-to-point archiving and retrieval to performing user-responsive distributed multisensor information extraction. To fully maximize the use of remote-sensor-generated Earth science data, NASA recognized the need for data systems that provide data access and manipulation capabilities responsive to research brought forth by advancing scientific analysis and the need to maximize the use and usability of the data. The decision by NASA to purposely evolve the Earth Observing System Data and Information System (EOSDIS) at the Goddard Space Flight Center (GSFC) Earth Sciences (GES) Data and Information Services Center (DISC) and other information management facilities was timely and appropriate. The GES DISC evolution was focused on replacing the EOSDIS Core System (ECS) by reusing the In-house developed disk-based Simple, Scalable, Script-based Science Product Archive (S4PA) data management system and migrating data to the disk archives. Transition was completed in December 2007

Kempler, Steven↗