Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEBAF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Evaluation of a High-Power Target Design for Positron Production at CEBAF

A source for polarized positron beams at the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is being designed. The Polarized Electrons for Polarized Positrons (PEPPo) concept is used to produce polarized e$^+$e$^-$-pairs from the bremsstrahlung radiation of a longitudinally polarized electron beam interacting within a high-Z conversion target. The scheme under consideration includes a 4 mm thick tungsten target that absorbs 17 kW deposited by a 1 mA continuous-wave electron beam with an energy of 120 MeV. The concept of a rotating tungsten rim mounted on a water-cooled copper disk was explored. The results of ANSYS thermal and mechanical analyses are discussed together with FLUKA evaluations of the radiation damages.

Ushakov, A.↗

Towards large phase space beams at the CEBAF injector

We report on the status of a degrader device to generate large phase space beams for machine acceptance studies in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. The degrader device consists of thin, low-Z targets to degrade the electron beam phase space through multiple scattering, two apertures to define the maximum transverse emittance, and a solenoid to aid in matching to the rest of the injector beamline. The engineering design of the degrader device and projected degraded beam phase space parameters are presented.

Sy, A.↗

Computational simulations and beamline optimizations for an electron beam degrader at CEBAF

An electron beam degrader is under development with the objective of measuring the transverse and longitudinal acceptance of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. This project is in support of the CE+BAF positron capability. Computational simulations of beam-target interactions and particle tracking were performed integrating the GEANT4 and Elegant toolkits. A solenoid was added to the setup to control the beam's divergence. Parameter optimization of the solenoid field and magnetic quadrupoles gradient was also performed to further reduce particle loss through the rest of the injector beamline.

Lizárraga-Rubio, V.↗

FFA@CEBAF beam transport error and tolerance simulation studies

The Continuous Electron Beam Accelerator Facility (CEBAF) is a 12 GeV recirculating electron accelerator at the Thomas Jefferson National Accelerator Facility (JLAB). Major upgrades to the accelerator are being investigated which include a new 650 MeV injection beamline and state-of-the-art fixed-field alternating (FFA) gradient recirculation arcs. The upgrade will extend the energy of the electron beam to over 20 GeV. In this paper, we provide an error and tolerance simulation study of the amended beam optics transport of the existing accelerator tuned for 22 GeV operation. The study is conducted with the particle tracking codes elegant and Bmad in two parts. In the first part, we treat each section of the accelerator (electromagnetic arcs and linacs) modularly with ideal conditions at the beginning. The second part is a pseudo start-to-end (S2E) simulation with accumulated errors propagating from one beamline to the next.

Accelerator Physics↗

Exploratory splitter bend system designs for FFA@CEBAF

An upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility (JLAB) is anticipated to provide an electron beam of over 20 GeV using the existing superconducting-RF linear accelerator and new fixed-field alternating (FFA) gradient recirculation arcs made up of Halbach-style permanent magnets. In the current design, the FFA arcs will carry six beams with energies of approximately 11, 13, 16, 18, 20, and 22 GeV which will require horizontal splitter lines to match the beam from the preceding linac. In this paper, we describe two alternative splitter beamline designs that are tuned to match the beam's Twiss parameters, R56, time-of-flight, bend-plane offset, and dispersion into the FFA cells.

Accelerator Physics↗

Horizontal Splitter Design For FFA@CEBAF Energy Upgrade: Current Status

Thomas Jefferson National Accelerator Facility (Jefferson Lab) is currently studying the feasibility of an energy upgrade based upon Fixed-Field Alternating Gradient (FFA) permanent magnet technology. The current plan is to replace the highest-energy recirculation arcs with FFA arcs, increasing the total number of beam recirculations, thus the energy. In order to accommodate multiple passes in the FFA arcs, horizontal splitters are being designed to control the beam parameters entering the FFA arcs, as well as the time of flight and R_56. In the current design, six passes will recirculate through the FFA arcs, necessitating the design of six independent beamlines to control the optics and beam dynamics matching into the arcs. These beamlines must fit into the current CEBAF tunnel, while allowing for personnel and equipment access. They must also be flexible enough to accommodate the beam under realistic operational conditions and fluctuations. The constraints on the system are highly restrictive, complicating the design. This document will describe the current state of the design, and indicate the work remaining for a complete conceptual design.

Benesch, Jay↗

Current status of conceptual horizontal splitter design for FFA@CEBAF energy Upgrade

Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) is currently investigating the feasibility of upgrading its maximum operating energy using Fixed-Field Alternating-gradient (FFA) recirculating arcs to increase the total number of recirculations of the beam through the pair of LINACs. These FFA arcs will be composed of permanent magnets, with small Panofsky-style multipole correctors. In order to control the beam parameters through these FFA arcs, horizontal splitters must be used. The geometrical and physical constraints, as well as the beam matching requirements are very restrictive, complicating the design. This work will show the current status of the most mature design, which includes matching solutions, as well as options for extraction of the beam.

Accelerator Physics↗

Exploring Causes of Beam Loss at CEBAF

At Jefferson Lab, the Continuous Electron Beam Accelerator (CEBAF) features a unique design with two linear accelerators and two arc sections allowing for multiple turns of the electron beam, as well as four experimental end stations. This topology leads to increased beam losses, especially in the spreader and recombiner regions connecting the arcs to the linacs and in the extraction regions connecting the experimental end stations to the accelerator. These losses result in equipment activation and operational interruptions. Recent upgrades to the facility’s diagnostic systems, including the addition of xenon ion chambers, have provided higher-resolution data regarding these loss events. Building on this improved observational capability, we are developing a simulation framework using optics codes and the Geant4-based BDSIM to model beam extinction and halo formation in these regions. This work aims to correlate simulation results with experimental data to isolate the causes of beam loss and inform future machine tuning strategies. We present a summary of conclusions drawn from recent operational studies and outline a plan to model the beam loss and validate the simulations.

Matthews, C. [Old Dominion Univ., Norfolk, VA (Uni↗

First degraded beams in the CEBAF injector

The electron beam degrader in the Continuous Electron Beam Accelerator Facility (CEBAF) injector at Jefferson Lab serves to generate electron beams with transverse emittance over 10x the nominal values, with the ultimate goal of using degraded electron beams to measure machine acceptance. Electron beams are degraded through multiple scattering in thin carbon foils, and maximum transverse emittance is defined through two collimating apertures. The degrader device was installed in late 2024, with commissioning and first beams on degrader targets during the 2025 physics run. We report on first operation of the degrader device. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177.

Sy, A. [Thomas Jefferson National Accelerator Faci↗

Resonance Control System for the CEBAF Separator Upgrade

Abstract The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. The RF system employs two digital LLRF systems controlling four normal conducting cavities in a vector sum setting. Cavity tune information of the individual cavities is obtained using a multiplexing scheme of the forward and reflected RF signals. Water skids equipped with heaters and valves are used to control resonance. A new FPGA-based hardware and EPICS-based predictive control algorithm has been developed to support reliable operation of the beam extraction process. This paper presents the architecture design of the existing hardware and software as well as a plan to develop a model predictive control system.

Plawski, Tomasz↗

Status of conceptual horizontal splitter design for FFA@CEBAF energy upgrade

Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) is currently investigating the feasibility of upgrading its maximum operating energy using Fixed-Field Alternating-gradient (FFA) recirculating arcs to increase the total number of recirculations the beam through the pair of LINACs. These FFA arcs will be composed of permanent magnets, with small Panofsky-style multipole correctors. Horizontal splitters are needed to control the beam parameters through these FFA arcs. The geometrical and physical constraints, as well as the beam matching requirements are very restrictive, complicating the design. This work will show the current status of the most mature design, which includes matching solutions, as well as options for extraction of the beam.

Accelerator Physics↗

LLRF commissioning of the CEBAF C75 upgrades SAM 2024/25

An often-overlooked aspect of Low Level Radio Frequency (LLRF) design is commissioning of a new system. During Jlab’s Scheduled Accelerator Maintenance (SAM) in 2024, two C75 Cryomodule were installed in CEBAF with Jlab’s LLRF 3.0 system. Jlab’s team has invested effort in automating and standardizing their commissioning process. Several key components are klystron characterization, cavity characterization, and interlock verification. This poster will present the summary of LLRF preparation and commissioning efforts at Jlab.

Accelerator Physics↗

Standardized beamline particulate characterization analysis: Initial application to CEBAF and LCLS-II cryomodule components

Despite continuously evolving efforts to minimize and manage the occurrence of particulates in operational SRF accelerator systems, the presence of electron field emission from contaminating particulates on SRF surfaces with high surface electric fields remains a consistent challenge. Jefferson Lab has recently initiated a standardized particulate sampling and characterization practice in order to gain more specific and systematic knowledge of the particulates actually present. It is expected that patterns emerging from such sampling will strengthen source attribution and guide improvement efforts. Initial samples were gathered from a cryomodule and adjoining warm girders that were removed from the CEBAF tunnel for reprocessing. The collection and analysis techniques were also used to characterize particulates on the inside of LCLS-II string components. Samples are transferred to clean industry-standard forensic GSR carbon tape spindles and examined via automated cleanroom SEM scanning for particle localization trends and sizing. The particulates are subsequently analyzed with EDS for elemental composition. A catalogue of found particle types is being accumulated. The methods used and results obtained from these initial applications will be presented.

Reece, Charles↗

CEBAF Upgrade Bunch Length Measurements

Many accelerators use short electron bunches and measuring the bunch length is important for efficient operations. CEBAF needs a suitable bunch length because bunches that are too long will result in beam interruption to the halls due to excessive energy spread and beam loss. In this work, bunch length is measured by invasive and non-invasive techniques at different beam energies. Two new measurement techniques have been commissioned; a harmonic cavity showed good results compared to expectations from simulation, and a real time interferometer is commissioned and first checkouts were performed. Three other techniques were used for measurements and comparison purposes without modifying the old procedures. Two of them can be used when the beam is not compressed longitudinally while the other one, the synchrotron light monitor, can be used with compressed or uncompressed beam.

43 PARTICLE ACCELERATORS↗

Multi-objective optimization of CEBAF heat load management and trip rates using AI/ML

The goal of this project is to investigate the use of RL to simultaneously optimize the cryogenic heat load and trip rate of the CEBAF linacs and make it generic to solve multi-objective problems that will enable its application at other Department of Energy (DOE) facilities with similar challenges. The existing approach optimizes the gradient distribution to minimize the trip rate and does not take into account the total heat load. A secondary objective of the project is the develop a framework to correct cavity quality curves (Q-curves) or RF-heat to Gradient relation curves for individual cavities. These curves are currently obtained using historical measurements and may have changed their behavior due to various events. Correction in these curves will allow us to accurately approximate the total RF heat generated by the linacs which is critical for the optimization.

43 PARTICLE ACCELERATORS↗

A Smart Alarm for the CEBAF Injector

We present initial results from a proof-of-concept ?smart alarm? for the CEBAF injector. Because of the injector's large number of parameters and possible fault scenarios, it is highly desirable to have an autonomous alarm system that can quickly identify and diagnose unusual machine states. Our approach leverages a trained neural network to not only identify an anomalous machine state, but also to identify the root-cause by pinpointing the specific element or region responsible. We developed an inverse model trained on data collected during normal operations. Using the inverse model, measurements from the machine are used to compute machine settings, which are then compared to EPICS setpoints. Instances when predictions differ from EPICS setpoints by a user-defined threshold are flagged as anomalies, and the user is alerted to the issue. We present the results of our data collection efforts, model training and performance, and initial performance metrics.

Tennant, C.↗

35 years of CEBAF - Historic Review

Jefferson Lab, the youngest of the DOE Science laboratories, is now more than thirty years old, time to look back and understand how the lab has become a pillar of nuclear physics research in the world. Initially, a 2GeV conventional linac and stretcher ring was foreseen, but as soon as Hermann Grunder was nominated as Lab Director, he changed the design to a superconducting, recirculating linac. It is this accelerator, CEBAF, which has become the workhorse at Jefferson Lab, first at 4 GeV, then 6 GeV, and then an upgrade to 12GeV. The talk will follow this evolution of the accelerator complex.

Hutton, Andrew↗

SRF Cavity Fault Classification Using Machine Learning At CEBAF

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is the first large high power CW recirculating electron accelerator to make use of SRF accelerating structures. The structures are configured in two anti-parallel linacs connected by arcs. Each linac consists of twenty C20/C50 cryomodules each containing eight 5-cell cavities and five C100 upgrade cryomodules each containing eight 7-cell cavities. Accurately classifying the source of cavity faults is critical for improving accelerator performance. A cavity fault triggers a waveform acquisition process where 17 waveform records sampled at 5 kHz are recorded for each of the 8 cavities in the affected cryomodule. The waveform record length is sufficiently long for transient microphonic effects to be observable. This data combined with archived signals sampled at 10 Hz are used to classify faults. Significant time is required for a subject matter expert to analyze and identify the intra-cavity signatures of imminent faults. This paper describes a path forward that utilizes machine learning for automatic fault classification. Post-training identification of the physical origins of faults are discussed, as are potential machine-trained model-free implementations of trip avoidance procedures. These methods should provide new insights into cavity fault mechanisms and facilitate intelligent optimization of cryomodule performance

Solopova, A.↗