Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONFIGURATION CONTROL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Lessons Learned in the Update of a Safety Limit for the High Flux Isotope Reactor

A recent unreviewed safety question (USQ) regarding a portion of the High Flux Isotope Reactor (HFIR) transient decay heat removal analysis focused on applicability of a heat transfer correlation at the low flow end of reactor operations. During resolution of this issue, review of the correlations used to establish the safety limit (SL) on reactor flux-to-flow ratio revealed the need to change the magnitude of the SL at the low flow end of reactor operations and the need to update the hot spot fuel damage criteria to incorporate current knowledge involving parallel channel flow stability. Because of the original safety design strategy for the reactor, resolution of the issues for the flux-to-flow ratio involved reevaluation of all key process variable SLs and limiting control settings (LCSs) using the current version of the heat transfer analysis code for the reactor. Goals of the work involved updating and upgrading the SL analysis where necessary, while preserving the safety design strategy for the reactor. Changes made include revisions to the safety design criteria at low flows to address the USQ, update of the process- and analysis input-variable uncertainty considerations, and upgrade of the safety design criteria at high flow. The challenges faced during update/upgrade of this SL and LCS are typical of the problems found in the integration of safety into the design process for a complex facility. In particular, the problems addressed in the area of instrument uncertainties provide valuable lessons learned for establishment and configuration control of SLs for large facilities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NGNP Risk Management Database: A Model for Managing Risk

To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

42 ENGINEERING↗

2015 Summary Report on Industrial and Regulatory Engagement Activities

The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway of the Light Water Reactor Sustainability(LWRS) Program conducts a vigorous engagement strategy with the U.S. nuclear power industry, including the nuclear operating companies, major support organizations, the Nuclear Regulatory Commission (NRC), and suppliers. The goal of this engagement strategy is to develop a shared vision and common understanding across the nuclear industry of the need for II&C modernization, the performance improvement that can be obtained, and the opportunities for collaboration to enact this vision. The primary means of engaging the nuclear operating companies is through a Utility Working Group (UWG), composed of utility representatives that participate in formal meetings and bi-monthly phone calls to provide input on nuclear plant needs and priorities for II&C technologies. Two working groups were initiated during FY 2015 to provide a means for UWG members to focus on particular technologies of interest. The Outage Improvement Working Group consists of eight utilities that participate in periodic conference calls and have access to a share-point web page for acccess to project materials developed in the Advanced Outage Control Center pilot project. In the area of computer-based procedures and automated work packages, the II&C Pathway has worked with the Nuclear Information Technology Strategic Leadership (NITSL) to set up a monthly conference call with interested utility members to discuss various aspects of mobile worker technologies. Twenty one technical and project reports were delivered to the UWG during FY 2015, reflecting the work of the II&C Pathway pilot projects during the year. Distribution of these reports is one of the primary means of transferring to the nuclear industry the knowledge and experience gained during the development of advanced II&C technologies in support of LWR sustainability. Site visits to discuss pilot project activities and future plans were made to Arizona Public Service, Exelon, Duke Energy, Pacific Gas & Electric, SCANA, Southern Nuclear, South Texas Project, STARS Alliance, Tennessee Valley Authority, and Xcel. Discussions were also held on the pathway goals and activities with major industry support organizations during FY 2102, including the Institute of Nuclear Power Operations (INPO), the Nuclear Information Technology Strategic Leadership (NITSL), the Nuclear Energy Institute (NEI), and the Electric Power Research Institute. The Advanced II&C Pathway work was presented at five major industry conferences and Informal discussions were held with key NRC managers at industry conferences. In addition, discussions were held with NRC senior managers on digital regulatory issues through participation on the NEI Digital I&C Working Group. Meetings were held with major industry suppliers and consultants, to explore opportunities for collaboration and to provide a means of pilot project technology transfer. In the international area, discussions were held with Electricite’ de France (EdF) concerning possible collaboration in the area NPP configuration control using intelligent wireless devices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Components Database Design and Implementation for Accelerators and Detectors

Many accelerator and detector systems being fabricated for the PEP-II Accelerator and BABAR Detector needed configuration control and calibration measurements tracked for their components. Instead of building a database for each distinct system, a Components Database was designed and implemented that can encompass any type of component and any type of measurement. In this paper we describe this database design that is especially suited for the engineering and fabrication processes of the accelerator and detector environments where there are thousands of unique component types. We give examples of information stored in the Components Database, which includes accelerator configuration, calibration measurements, fabrication history, design specifications, inventory, etc. The World Wide Web interface is used to access the data, and templates are available for international collaborations to collect data off-line.

43 PARTICLE ACCELERATORS↗

Synchronized electric meter having an atomic clock

Smart electric meters configured to perform fast, time-synchronized electrical energy measurements at the consumer-level are disclosed herein. In some embodiments, a smart electric meter includes circuitry configured to measure an electrical value at a location of an end user in a power system. The smart electric meter can further include an atomic clock configured to output a timing signal, and a controller configured to receive (a) the measured electrical value from the circuitry and (b) the timing signal from the atomic clock. The controller can further (a) process the electrical value to generate meter data and (b) generate a time tag based on the timing signal. Then, the controller can associate the time tag with the meter data to generate time-tagged meter data.

Min, Liang↗

Status Report on the Creation of a Preliminary Data Model and Dictionary for a New Petrologic Database

A preliminary database has been developed that will allow mineralogy and bulk-rock geochemical information to be managed under configuration control and facilitate electronic querying. The database is currently developed in Microsoft Access as a collection of tables, views, and entry forms. Each field and table has been described in a data dictionary.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap. Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Investigation of Digital Instrumentation and Control System Failure Modes

A study sponsored by the Nuclear Regulatory Commission study was conducted to investigate digital instrumentation and control (DI&C) systems and module-level failure modes using a number of databases both in the nuclear and non-nuclear industries. The objectives of the study were to obtain relevant operational experience data to identify generic DI&C system failure modes and failure mechanisms, and to obtain generic insights, with the intent of using results to establish a unified framework for categorizing failure modes and mechanisms. Of the seven databases studied, the Equipment Performance Information Exchange database was found to contain the most useful data relevant to the study. Even so, the general lack of quality relative to the objectives of the study did not allow the development of a unified framework for failure modes and mechanisms of nuclear I&C systems. However, an attempt was made to characterize all the failure modes observed (i.e., without regard to the type of I&C equipment under consideration) into common categories. It was found that all the failure modes identified could be characterized as (a) detectable/preventable before failures, (b) age-related failures, (c) random failures, (d) random/sudden failures, or (e) intermittent failures. The percentage of failure modes characterized as (a) was significant, implying that a significant reduction in system failures could be achieved through improved online monitoring, exhaustive testing prior to installation, adequate configuration control or verification and validation, etc.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Post-closure program streamlining at the Nevada national security site - 15290

More than 200 sites on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) have been closed in place. At these sites, contamination has been left in place, and protection of human health, safety, and the environment is ensured through the establishment of use restrictions (URs). Post-closure requirements were initially established in the Closure Report (CR) for each site and include a variety of inspection, monitoring, maintenance, and reporting commitments. Post-closure requirements and site controls (fences, monuments, soil covers, and postings) may vary depending on site location, accessibility, land use scenario, and the nature of contaminants left in place. Corrective Action Sites (CASs) on the NNSS, NTTR, and TTR have been identified for closure under the Federal Facility Agreement and Consent Order (FFACO), which was signed in 1996. Over 1,900 CASs have been closed under the framework of the FFACO, and more than 200 of those have URs. Many post-closure requirements have been modified over time. In addition, because the scope of the program has spanned almost 20 years, the post-closure requirements have varied due to changing strategies and expectations. Because of the number of sites closed over the course of the program, post-closure requirements are found in hundreds of closure documents, addendums, errata sheets, Records of Technical Change, inspection reports, permit modifications, and correspondence. Furthermore, resources such as personnel and funding necessary to conduct the post-closure program have diminished, while computer capabilities and configuration control principles have improved since closure activities under the FFACO began. Because of these factors, to effectively manage the post-closure program, ensure that all commitments are being met, and improve the ease of identifying the most current post-closure requirements for each UR, the current requirements for every use-restricted site under the purview of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office will be consolidated into a single Post-Closure Plan. The Consolidated Post-Closure Plan will also outline a strategy and present possible criteria that may be used for future evaluation of post-closure requirements. Continual assessment of the post-closure program will ensure that the post-closure requirements for URs across the NNSS, NTTR, and TTR are consistently justifiable and sufficient to protect site workers, the public, and the environment while increasing efficiency. Future changes to post-closure requirements and justification for those changes will be recorded in revisions to the Consolidated Post-Closure Plan. This process will provide a comprehensive, consistent, and streamlined method for evaluation of post-closure requirements and implementation of changes. (authors)

54 ENVIRONMENTAL SCIENCES↗

Selection and Traceability of Parameters To Support Hanford-Specific RESRAD Analyses -- Fiscal Year 2008 Status Report

In fiscal years 2007 and 2008, the Hanford Site Groundwater Remediation Project, formerly managed by Fluor Hanford, Inc., requested the Pacific Northwest National Laboratory (PNNL) to support the development and initial implementation of a strategy to establish and maintain, under configuration control, a set of Hanford-specific flow and transport parameter estimates that can be used to support Hanford Site assessments. This document provides a summary of those efforts, culminating in a set of best-estimate Hanford-specific parameters for use in place of the default parameters used in the RESRAD code. The RESRAD code is a computer model designed to estimate radiation doses and risks from RESidual RADioactive materials. The long-term goals of the PNNL work are to improve the consistency, defensibility, and traceability of parameters and their ranges of variability, and to ensure a sound basis for assigning parameters for flow and transport models in the code. The strategy was to start by identifying the existing parameter data sets most recently used in site assessments, documenting these parameter data sets and the raw data sets on which they were based, and using the existing parameter sets to define best-estimate parameters for use in the RESRAD code. The Hanford-specific assessment parameters compiled for use in RESRAD are traceable back to the professional judgment of the authors of published documents. Within the references, parameters are often not directly traceable back to the raw data and analytical approaches used to derive the assessment parameters. Future activities will work to continuously improve the defensibility and traceability of the parameter data sets and to address limitations and technical issues associated with the existing assessment parameter data sets.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Space Shuttle Orbiter audio subsystem

The selection of the audio multiplex control configuration for the Space Shuttle Orbiter audio subsystem is discussed and special attention is given to the evaluation criteria of cost, weight and complexity. The specifications and design of the subsystem are described and detail is given to configurations of the audio terminal and audio central control unit (ATU, ACCU). The audio input from the ACCU, at a signal level of -12.2 to 14.8 dBV, nominal range, at 1 kHz, was found to have balanced source impedance and a balanced local impedance of 6000 + or - 600 ohms at 1 kHz, dc isolated. The Lyndon B. Johnson Space Center (JSC) electroacoustic test laboratory, an audio engineering facility consisting of a collection of acoustic test chambers, analyzed problems of speaker and headset performance, multiplexed control data coupled with audio channels, and the Orbiter cabin acoustic effects on the operational performance of voice communications. This system allows technical management and project engineering to address key constraining issues, such as identifying design deficiencies of the headset interface unit and the assessment of the Orbiter cabin performance of voice communications, which affect the subsystem development.

Stewart, C. H.↗

Report of the Attitude Control and Attitude Determination Panel

Failures and deficiencies in flight programs are reviewed and suggestions are made for avoiding them. The technology development problem areas considered are control configured vehicle design, gyros, solid state star sensors, control instrumentation, tolerant/accomodating control systems, large momentum exchange devices, and autonomous rendezvous and docking.

Source record↗

NPS alternate techsat satellite, design project for AE-4871

This project was completed as part of AE-4871, Advanced Spacecraft Design. The intent of the course is to provide experience in the design of all the major components in a spacecraft system. Team members were given responsibility for the design of one of the six primary subsystems: power, structures, propulsion, attitude control, telemetry, tracking and control (TT&C), and thermal control. In addition, a single member worked on configuration control, launch vehicle integration, and a spacecraft test plan. Given an eleven week time constraint, a preliminary design of each subsystem was completed. Where possible, possible component selections were also made. Assistance for this project came principally from the Naval Research Laboratory's Spacecraft Technology Branch. Specific information on components was solicited from representatives in industry. The design project centers on a general purpose satellite bus that is currently being sought by the Strategic Defense Initiative.

Source record↗

Redundant Robot Can Avoid Obstacles

Simple and direct control scheme enables redundant robot to avoid obstacles in workspace. In proposed scheme, called "configuration control", degrees of freedom used to configure robot to satisfy set of inequality constraints representing avoidance of obstacles, while simultaneously making end effector follow desired trajectory. Provides capability to avoid obstacles in dynamically varying environment where apriori planning of tasks not feasible.

Homayoun, Seraji↗

Fluid Mechanics, Drag Reduction and Advanced Configuration Aeronautics

This paper discusses Advanced Aircraft configurational approaches across the speed range, which are either enabled, or greatly enhanced, by clever Flow Control. Configurations considered include Channel Wings with circulation control for VTOL (but non-hovering) operation with high cruise speed, strut-braced CTOL transports with wingtip engines and extensive ('natural') laminar flow control, a midwing double fuselage CTOL approach utilizing several synergistic methods for drag-due-to-lift reduction, a supersonic strut-braced configuration with order of twice the L/D of current approaches and a very advanced, highly engine flow-path-integrated hypersonic cruise machine. This paper indicates both the promise of synergistic flow control approaches as enablers for 'Revolutions' in aircraft performance and fluid mechanic 'areas of ignorance' which impede their realization and provide 'target-rich' opportunities for Fluids Research.

Bushnell, Dennis M.↗

Target Diagnostics Supports NIF's Path to Ignition

The physics requirements derived from the National Ignition Facility (NIF) experimental campaigns are leading to a wide variety of target diagnostics. Software development for the control and analysis of these diagnostics is included in the NIF Integrated Computer Control System, Diagnostic Control System and Data Visualization. These projects implement the configuration, controls, data analysis and visual representation of most of these diagnostics. To date, over 40 target diagnostics have been developed to support NIF experiments. In 2011 diagnostics were developed or enhanced to measure Ignition performance in a high neutron yield environment. Performance is optimized around four key variables: Adiabat (a) which is the strength and timing of four shocks delivered to the target, Velocity (V) of the imploding target, Mix (M) is the uniformity of the burn, and the Shape (S) of the imploding Deuterium Tritium (DT) hot spot. The diagnostics used to measure each of these parameters is shown in figure 1. Adiabat is measured using the Velocity Interferometer System for Any Reflector (VISAR) diagnostic consisting of three streak cameras. To provide for more accurate adiabat measurements the VISAR streak cameras were enhanced in FY11 with a ten comb fiducial signal controller to allow for post shot correction of the streak camera sweep non-linearity. Mix is measured by the Neutron Time of Flight (NTOF) and Radiochemical Analysis of Gaseous Samples (RAGS) diagnostics. To accommodate high neutron yield shots, NTOF diagnostic controls are being modified to use Mach Zehnder interferometer signals to allow the digitizers to be moved from near the target chamber to the neutron shielded diagnostic mezzanine. In December 2011 the first phase of RAGS diagnostic commissioning will be completed. This diagnostic will analyze the tracers that are added to NIF target capsules that undergo nuclear reactions during the shot. These gases are collected and purified for nuclear counting by the RAGS system. Three new instrument controllers were developed and commissioned to support this diagnostic. A residual-gas analyzer (RGA) instrument measures the gas content at various points in the system. The Digital Gamma Spectrometer instrument measures the radiological spectrum of the decaying gas isotopes. A final instrument controller was developed to interface to a PLC based Gas collection system. In order to support the implosion velocity measurements an additional Gated X-ray Detector (GXD) diagnostic was tested and commissioned. This third GXD views the target through a slit contained in its snout and allows the other GXD diagnostics to be used for measuring the shape on the same shot. In order to measure the implosion shape in a high neutron environment, Actide Readout In A Neutron Environment (ARIANE) and Neutron Imaging (NI) diagnostics were commissioned. The controls for ARIANE, a fixed port gated x-ray imager, contain a neutron shielded camera and micro channel plate pulser with its neutron sensitive electronics located in the diagnostic mezzanine. The NI diagnostic is composed of two Spectral Instruments SI-1000 cameras located 20M from the target and provides neutron images of the DT hot spot for high yield shots. The development and commissioning of these new or enhanced diagnostics in FY11 have provided meaningful insight that facilitates the optimization of the four key Ignition variables. In FY12 they will be adding three new diagnostics and enhancing four existing diagnostics in support of the continuing optimization series of campaigns.

42 ENGINEERING↗