Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

But what will it Cost? The history of NASA cost estimating

Within two years of being chartered in 1958 as an independent agency to conduct civilian pursuits in aeronautics and space, NASA absorbed either wholly or partially the people, facilities, and equipment of several existing organizations. These included the laboratories of the National Advisory Committee of Aeronautics (NACA) at Langley Research Center in Virginia, Ames Research Center in California, and Lewis Research Center in Ohio; the Army Ballistic Missile Agency (ABMA) at Redstone Arsenal Alabama, for which the team of Wernher von Braun worked; and the Department of Defense Advanced Research Projects Agency (ARPA) and their ongoing work on big boosters. These were especially valuable resources to jump start the new agency in light of the shocking success of the Soviet space probe Sputnik in the autumn of the previous year and the corresponding pressure from an impatient American public to produce some response. Along with these inheritances, there came some existing systems engineering and management practices, including project cost estimating methodologies. This paper will briefly trace the origins of those methods and how they evolved within the agency over the past three decades.

Hamaker, Joseph W.↗

Astrometric telescope facility. Preliminary systems definition study. Volume 3: Cost estimate

The results of the Astrometric Telescope Facility (ATF) Preliminary System Definition Study conducted in the period between March and September 1986 are described. The main body of the report consists primarily of the charts presented at the study final review which was held at NASA Ames Research Center on July 30 and 31, 1986. The charts have been revised to reflect the results of that review. Explanations for the charts are provided on the adjoining pages where required. Note that charts which have been changed or added since the review are dated 10/1/86; unchanged charts carry the review date 7/30/86. In addition, a narrative summary is presented of the study results and two appendices. The first appendix is a copy of the ATF Characteristics and Requirements Document generated as part of the study. The second appendix shows the inputs to the Space Station Mission Requirements Data Base submitted in May 1986. The report is issued in three volumes. Volume 1 contains an executive summary of the ATF mission, strawman design, and study results. Volume 2 contains the detailed study information. Volume 3 has the ATF cost estimate, and will have limited distribution.

Sobeck, Charlie↗

Cost estimating Brayton and Stirling engines

Brayton and Stirling engines were analyzed for cost and selling price for production quantities ranging from 1000 to 400,000 units per year. Parts and components were subjected to indepth scrutiny to determine optimum manufacturing processes coupled with make or buy decisions on materials and small parts. Tooling and capital equipment costs were estimated for each detail and/or assembly. For low annual production volumes, the Brayton engine appears to have a lower cost and selling price than the Stirling Engine. As annual production quantities increase, the Stirling becomes a lower cost engine than the Brayton. Both engines could benefit cost wise if changes were made in materials, design and manufacturing process as annual production quantities increase.

Fortgang, H. R.↗

Cost estimation of balance of plant equipment scale up for proton exchange membrane water electrolyzer systems

Water electrolyzers that use electricity to split water into hydrogen and oxygen could be a key technology for increasing hydrogen supply to meet expanded and emerging market applications, although currently the capital costs of these electrolyzers are high. Here we examine cost reductions that might be achieved by scaling up proton exchange membrane (PEM) electrolyzer systems and leveraging economies of scale through balance of plant (BOP) components for system sizes between 1 MW and 1 GW. We estimate BOP equipment capital costs of about $\$$848/kW at 1 MW, potentially decreasing to $\$$87/kW at 1 GW (2022-dollar year basis) with most of the cost reduction happening as systems scale from 1 MW to 100 MW. We find that BOP subsystems hydrogen drying and water knockout benefited the most from economies-of-scale cost reductions, and piping, instrumentation, and housing and power electronics were less impacted. These cost reductions from economies of scale could be more significant than estimated cost reductions from manufacturing scale-up reported in literature. These results add to the knowledge base that could guide optimal system designs that balance process scale-up with plant modularization and numbering-up. We also estimate that scaling up BOP could potentially lower the levelized cost of hydrogen (LCOH) by $\$$1.7-$\$$4.6/kg, depending on the scale-up magnitude and the plant capacity factor.

08 HYDROGEN↗

ASCoT 3: Nonlinear Principal Components Analysis and Uncertainty Quantification in Early Concept Spacecraft Flight Software Cost Estimation

For mission planners and evaluators alike, value in cost models comes from a mean or median prediction, an understanding of the uncertainty on that prediction, and an understanding of model performance. Here we apply advanced statistical and machine learning methods to spacecraft flight software cost, effort, and SLOC estimation, and present the results in the latest version of the Analogy Software Cost Tool (ASCoT). We present in- and out-of-sample performance metrics for our models, each of which incorporate some amount of epistemic uncertainty. ASCoT, hosted on the One NASA Cost Engineering (ONCE) database via the Online NASA Space Estimation Tool (ONSET), was first showcased in 2016 as a number of analogy-based models and methods (kNN and Clustering) to support early project formulation. This ASCoT update improves upon the previous analogic methods by incorporating uncertainty in the data transformations. In particular, we use a Nonlinear Principal Components Analysis (NLPCA) to deal with ordinal data.

Robotic Spacecraft↗

A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

Mizell, Carolyn↗

Machine learning models for maintenance cost estimation in delivery trucks using diesel and natural gas fuels

The maintenance costs can represent about 15%–60% of the cost of produced goods depending on the type of goods transported. To comply with stringent emissions regulations, diesel engines are incorporated with complex after-treatment systems that demand increased maintenance. The availability of alternative fuels such as natural gas and propane has fostered the natural gas and propane powertrain systems as well as electrification options for heavy- and medium-duty vehicles. A critical barrier to adopting alternative fuel vehicles has been the lack of knowledge on comparative vehicle maintenance/repair costs with conventional diesel. Moreover, the region of operation, the type of vehicle operation, and seasonal temperature changes also affect the duty cycle which impacts the maintenance and repair costs. This study focuses on estimating the cost-per-mile for heavy-duty vehicles using machine learning models such as random forest, xgboost, neural networks, and a super-learner model. The super-learner model achieved an error as low as 0.0068 $/mile for mean absolute error and 0.0086 $/mile for root mean square error with a coefficient of determination/R-Squared of 97.28%. Specifically, the paper investigates the data collected from the maintenance and repair costs associated with delivery trucks using diesel and natural gas fuels. Since the availability of data is the major constraint, we leveraged the data collected by West Virginia University and the partnership with fleet companies. This allows for additional information related to maintenance costs and fleet-specific maintenance practices of alternative fuel vehicles. This study promotes clean fuel technologies and enables fleet management companies to adopt alternative fuel vehicles in case of similar or lower cost of maintenance compared to diesel vehicles resulting in reduced emissions and total cost of ownership.

Katreddi, Sasanka↗

Development of weight and cost estimates for lifting surfaces with active controls

Equations and methodology were developed for estimating the weight and cost incrementals due to active controls added to the wing and horizontal tail of a subsonic transport airplane. The methods are sufficiently generalized to be suitable for preliminary design. Supporting methodology and input specifications for the weight and cost equations are provided. The weight and cost equations are structured to be flexible in terms of the active control technology (ACT) flight control system specification. In order to present a self-contained package, methodology is also presented for generating ACT flight control system characteristics for the weight and cost equations. Use of the methodology is illustrated.

Anderson, R. D.↗

Equipment Cost Estimator

The ECE application forecasts annual costs of preventive and corrective maintenance for budgeting purposes. Features within the application enable the user to change the specifications of the model to customize your forecast to best fit their needs and support “what if” analysis. Based on the user's selections, the ECE model forecasts annual maintenance costs. Preventive maintenance costs include the cost of labor to perform preventive maintenance activities at the specific frequency and labor rate. Corrective maintenance costs include the cost of labor and the cost of replacement parts. The application presents forecasted maintenance costs for the next five years in two tables: costs by year and costs by site.

Source record↗

Mass Production Cost Estimation of Direct H 2 PEM Fuel Cell Systems for Transportation Applications (2017 - 2021) (Final Report)

This report summarizes project activities for an assessment of transportation fuel cell system cost from 2017 to 2021. The project defined and projected the mass production costs of direct hydrogen PEM fuel cell power systems for LDVs (automobiles), MDVs, and HDVs for current and future technologies. In each year of the project, the fuel cell power system designs and cost projections were updated to reflect technological advances. Systems were defined corresponding to direct H2 PEM FC power systems for ~80 kWnet LDVs, 70-170 kWnet MDVs, and 275-330 kWnet HDVs. A selection of systems was analyzed in each year. Major components, their functionality, and relevant parameters were defined in system diagrams. The system definitions were supported by system performance modeling calculations. A BOM for each system analyzed was created that tabulated all system components and subsystems contained in the power systems. Several annual manufacturing rates were considered for each system analyzed.

08 HYDROGEN↗

Laser Atmospheric Wind Sounder (LAWS) phase 1. Volume 3: Project cost estimates

The laser atmospheric wind sounder (LAWS) cost modeling activities were initiated in phase 1 to establish the ground rules and cost model that would apply to both phase 1 and phase 2 cost analyses. The primary emphasis in phase 1 was development of a cost model for a LAWS instrument for the Japanese Polar Orbiting Platform (JPOP). However, the Space Station application was also addressed in this model, and elements were included, where necessary, to account for Space Station unique items. The cost model presented in the following sections defines the framework for all LAWS cost modeling. The model is consistent with currently available detail, and can be extended to account for greater detail as the project definition progresses.

Source record↗

Software Estimates Costs of Testing Rocket Engines

Simulation-Based Cost Model (SiCM) is a computer program that simulates pertinent aspects of the testing of rocket engines for the purpose of estimating the costs of such testing during time intervals specified by its users. A user enters input data for control of simulations; information on the nature of, and activity in, a given testing project; and information on resources. Simulation objects are created on the basis of this input. Costs of the engineering-design, construction, and testing phases of a given project are estimated from numbers and labor rates of engineers and technicians employed in each phase, the duration of each phase; costs of materials used in each phase; and, for the testing phase, the rate of maintenance of the testing facility. The three main outputs of SiCM are (1) a curve, updated at each iteration of the simulation, that shows overall expenditures vs. time during the interval specified by the user; (2) a histogram of the total costs from all iterations of the simulation; and (3) table displaying means and variances of cumulative costs for each phase from all iterations. Other outputs include spending curves for each phase.

Source record↗