Search NASASearch

SEARCH · Search NASA

Results for “Concurrent Engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Kiloton Class ISRU Systems for LO2/LCH4 Propellant Production on the Mars Surface

As part of the 2023 strategic analysis cycle to explore the trade space, the NASA Mars Architecture Team wanted to explore what it takes to produce in situ on Mars many hundreds of tons of propellants for a large all-chemical transportation system. The conceptual operations and design of the LO 2 /LCH 4 in situ resource utilization (ISRU) water acquisition, propellant production and liquification system was assigned to the NASA Compass concurrent engineering team with support from various NASA ISRU, cryogenic fluid management, and surface power experts. The conceptual point design examined one case producing 300 t of LO 2 /LCH 4 from the Mars atmosphere and delivered water in 20 months and storing the liquified propellants in a to-be-reused lander. Several of these large single-stage, all-chemical class large vertical landers would deliver the required ISRU equipment. The required 150 t of water stock for the ISRU system was traded between three options: delivered, pumped from subsurface ice deposits or extracted from surface soils. The large propellant production systems consist of atmospheric CO 2 collection scroll pumps, a combined solid oxide electrolysis and methanation system to convert the CO 2 and water into gaseous O 2 and CH 4 , and various dryers, scrubbers, and separators to remove the excess water, CO 2 and H 2 . The liquefaction system consisted of 90 K cryocoolers to provide cold Ne to the launch vehicle tanks to liquify these CH 4 and O 2 gases and store them as rocket propellants. The systems are deployed using a 6 t (payload) capable chassis derived from conceptual pressurized rover designs. In total, the propellant production and liquefaction systems required three propellant production pallets, two liquefaction pallets, two water tankers, and six 40 kW-fission surface power systems (FSPS) with cabling. All this equipment was found to notionally fit inside two- 75 metric ton payload capacity Mars ascent and landing vehicles (MALV). For the case where 150 t of water delivered from Earth, four cargo MALVs are required for the full system. The same is true when the 150 t of water is extracted through surface mining. For the borehole system, only 3 cargo MALVs are necessary. A comparison of approaches in terms of number of landers, number and type of elements, power and time is made.

ISRU

Lessons Learned in Concurrent Mission and Systems Design at NASA Glenn Research Center: Almost Fifteen Years of the Compass Team

This paper is a retrospective of the lessons learned during the almost 15-year history of the Compass concurrent mission and systems design team at NASA’s Glenn Research Center (GRC). It examines the key factors in the team’s evolution from a temporary group gathered to perform a single study to the successful, sustainable team it is today. Compass is a matrixed team of experts with various technical backgrounds and personalities. They collaborate over a two-week period either physically in a dedicated meeting space, or virtually to design a space system (Spacecraft, stage, science package, etc). Over the years, because of the rapid nature of the design studies, the team leadership has iterated on the optimal team member personality makeup, facility elements and tools as well as NASA GRC management support necessary to lead to sustained success.

systems engineering

Materials technology assessment for stirling engines

A materials technology assessment of high temperature components in the improved (metal) and advanced (ceramic) Stirling engines was undertaken to evaluate the current state-of-the-art of metals and ceramics, identify materials research and development required to support the development of automotive Stirling engines, and to recommend materials technology programs to assure material readiness concurrent with engine system development programs. The most critical component for each engine is identified and some of the material problem areas are discussed.

Stephens, J. R.

Automated workstation for the operation of spacecraft engineering subsystems

This paper addresses the development of a workstation that exploits automated tools to enable an operator to monitor concurrently several engineering subsystems and/or several space missions. The use of artificial intelligence and advanced graphics capabilities to achieve fast prototypes is discussed. The monitoring of engineering telemetry data from the Power and Pyro Subsystem of the Galileo spacecraft is emphasized.

Bahrami, K. A.

STARDUST: Discovery's InterStellar Dust and Cometary Sample Return Mission

The STARDUST Discovery mission will collect samples of cometary and interstellar dust and return them to Earth. The Jet Propulsion Laboratory provides project management with Lockheed Martin Astronautics as the spacecraft industrial partner. STARDUST management is aggressively pursuing cost control through the use of Total Quality Management principles, specifically operating in a Project Engineering and Integration Team that

STARDUST

RANGERS: Methodology Report on Design and Performance Assessment of Engineered Barrier Systems in a Salt Repository for HLW/SNF

Salt formations are one of the potential host rocks for the final disposal of high-level radioactive waste (HLW) in deep geological repositories, both in Germany and the United States. The safe isolation of radioactive waste in these repositories relies on a multi-barrier system, combining engineered and natural barriers. The natural barrier is provided by the salt rock itself, known for its self-sealing properties and long-term stability. The engineered barrier, on the other hand, comprises sealing components strategically placed within the repository to enhance its containment capabilities. In both Germany and the United States, long-term safety assessments require demonstrating the integrity of the natural barrier for a period of up to 1 million years. Concurrently, the engineered barrier system (EBS) must maintain its structural and functional integrity until the long-term sealing, such as the granular salt backfill material, has re-consolidated to its final low porosity and permeability. Based on extensive expertise and experience with engineered barriers in salt formations, BGE TECHNOLOGY GmbH and Sandia National Laboratories have partnered to develop a robust methodology for the integrity and performance assessment of EBS in HLW repositories through the RANGERS project. This collaborative effort aims to establish a unified approach to geotechnical engineering, repository design, integrity and performance evaluation of EBS in salt repositories.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

Developmental problems and their solution for the Space Shuttle main engine alternate liquid oxygen high-pressure turbopump: Anomaly or failure investigation the key

The Space Shuttle main engine (SSME) alternate high-pressure liquid oxygen pump experienced synchronous vibration and ball bearing life problems that were program threatening. The success of the program hinged on the ability to solve these development problems. The design and solutions to these problems are engirded in the lessons learned and experiences from prior programs, technology programs, and the ability to properly conduct failure or anomaly investigations. The failure investigation determines the problem cause and is the basis for recommending design solutions. For a complex problem, a comprehensive solution requires that formal investigation procedures be used, including fault trees, resolution logic, and action items worked through a concurrent engineering-multidiscipline team. The normal tendency to use an intuitive, cut-and-try approach will usually prove to be costly, both in money and time and will reach a less than optimum, poorly understood answer. The SSME alternate high-pressure oxidizer turbopump development has had two complex problems critical to program success: (1) high synchronous vibrations and (2) excessive ball bearing wear. This paper will use these two problems as examples of this formal failure investigation approach. The results of the team's investigation provides insight into the complexity of the turbomachinery technical discipline interacting/sensitivities and the fine balance of competing investigations required to solve problems and guarantee program success. It is very important to the solution process that maximum use be made of the resources that both the contractor and Government can bring to the problem in a supporting and noncompeting way. There is no place for the not-invented-here attitude. The resources include, but are not limited to: (1) specially skilled professionals; (2) supporting technologies; (3) computational codes and capabilities; and (4) test and manufacturing facilities.

Ryan, R.

Nacelle Aerodynamic and Inertial Loads (NAIL) project. Appendix B

The testing was conducted on the Boeing-owned 747 RA001 test bed airplane during the concurrent 767/JT9D-7R4 engine development program. Following a functional check flight conducted from Boeing Field International (BFI) on 3 October 1980, the airplane and test personnel were ferried to Valley Industrial Park (GSG) near Glasgow, Montana, on 7 October 1980. The combined NAL and 7670JT9D-7R4 test flights were conducted at the Glasgow remote test site, and the airplane was returned to Seattle on 26 October 1980.

Source record

Concurrent optimization of airframe and engine design parameters

An integrated system for the multidisciplinary analysis and optimization of airframe and propulsion design parameters is being developed. This system is known as IPAS, the Integrated Propulsion/Airframe Analysis System. The traditional method of analysis is one in which the propulsion system analysis is loosely coupled to the overall mission performance analysis. This results in a time consuming iterative process. First, the engine is designed and analyzed. Then, the results from this analysis are used in a mission analysis to determine the overall aircraft performance. The results from the mission analysis are used as a guide as the engine is redesigned and the entire process repeated. In IPAS, the propulsion system, airframe, and mission are closely coupled. The propulsion system analysis code is directly integrated into the mission analysis code. This allows the propulsion design parameters to be optimized along with the airframe and mission design parameters, significantly reducing the time required to obtain an optimized solution.

Lavelle, Thomas M.

Concurrent optimization of airframe and engine design parameters

An integrated system for the multidisciplinary analysis and optimization of airframe and propulsion design parameters is being developed. This system is known as IPAS, the Integrated Propulsion/Airframe Analysis System. The traditional method of analysis is one in which the propulsion system analysis is loosely coupled to the overall mission performance analysis. This results in a time consuming iterative process. First, the engine is designed and analyzed. Then, the results from this analysis are used in a mission analysis to determine the overall aircraft performance. The results from the mission analysis are used as a guide as the engine redesigned and the entire process repeated. In IPAS, the propulsion system, airframe, and mission are closely coupled. The propulsion system analysis code is directly integrated into the mission analysis code. This allows the propulsion design parameters to be optimized along with the airframe and mission design parameters, significantly reducing the time required to obtain an optimized solution.

Lavelle, Thomas M.

Trans-Global Mission Architectures

Mission operations include the utilization of both space and ground resources to achieve mission objectives. Future architectures will make the spacecraft a node on a distributed system, thus expanding the scope of missions beyond the global scale. The history and evolution of planetary mission operations are outlined, together with the current global involvement in planetary missions. The modular nature and reuse of the supporting ground data systems, and the inclusion of automation and dedicated software in space missions, are discussed. A trans-global mission architecture is presented, and consists of an extension of a layered reusable mission operations architecture to create an open ground/space operations system. Concurrent mission engineering with such trans-global structures is discussed.

Anderson, Barbara V.

The Proliferation of PDC-Type Environments in Industry and Universities

JPL's Project Design Cenger (PDC), opened in 1994, has become a model for other facilities of the same type in the aerospace industry. More recently, PDC-type environments have been adopted by some university aerospace departments as an educational tool. This paper discusses some of these facilities and their possible future direction.

concurrent engineering collaborating environments

Mars Pathfinder

The Mars Pathfinder Mission Assurance program was the first.

concurrent engineering early

JPL/NASA/IEEE Test Effectiveness Workshop

(none given)From OBJECTIVES: Specific objectives of the working group are to support the innovation, development, evaluation and implementation of test methods, metrics and tools based on failure engineering/physics and/or root cause evaluations. Data sources systems and tools shall be developed and implemented that: 1) provide improved preventions, controls, analyses and tests (PACT) & field failure data collection, 2) facilities data analysis, archiving, retrieval, failure physics and/or root cause evaluations and 3) enable new and existing technology suitability evaluations to be performed.

effectiveness concurrent engineering metrics test

Flight System Testbed for Low Cost Spacecraft Interface Evaluation

A world leader in space technology, JPL has over 30 years experience in developing spacecraft systems and managing deep space missions for NASA. Future scientific missions will require the rapid development of small, lightweight, high-technology, low-cost spacecraft. JPL is developing a method of meeting these requirements: a test facility specifically for supporting a rapid prototyping development environment that creates a virtual (simulated) spacecraft in which system-level evaluations of components can be carried out very early in the development cycle, long before an actual spacecraft is built.

flight system testbed component evaluation reengin