Search NASASearch

SEARCH · Search NASA

Results for “Control Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

A Closer Look at Automation Behavior During a Human-in-the-Loop Simulation

A 2012 Human-In-The-Loop air traffic control simulation investigated a gradual paradigm-shift in the allocation of functions between operators and automation. Air traffic controllers staffed five adjacent high-altitude en route sectors, and during the course of a two-week experiment, worked traffic under four different function allocation concepts aligned with increasingly mature NextGen operational environments. These NextGen time-frames ranged from near current-day operations to nearly fully-automated control, in which the ground systems automation was responsible for detecting conflicts, issuing strategic and tactical resolutions, and alerting controllers to exceptional circumstances. This paper continues the investigations reported in previous publications. Analyses of data surrounding the conflict-resolution task serve as the context in which we investigate the interactions between controllers and the automation.

Human-Automation Interaction

Impacts of solar energy utilization

Various methods of conducting surveys and analyses to determine the attitude of the public toward the energy crisis are discussed. Models to determine the impact of the energy crisis and proposed alternative sources of energy on the social structure are analyzed. The various interest groups which are concerned with energy and the nature of their interest are identified. The government structure for controlling resource production and allocation is defined.

Source record

An inside look at NASA planetology

Staffing, financing and budget controls, and research grant allocations of NASA are reviewed with emphasis on NASA-supported research in planetary geological sciences: studies of the composition, structure, and history of solar system planets. Programs, techniques, and research grants for studies of Mars photographs acquired through Mariner 6-10 flights are discussed at length, and particularly the handling of computer-enhanced photographic data. Scheduled future NASA-sponsored planet exploration missions (to Mars, Jupiter, Saturn, Uranus) are mentioned.

Dwornik, S. E.

WARC 92 and some thoughts as to its impact on the NASA propagation program

The World Administrative Radio Conference of 1992 (WARC 92) was held in Torremolinos, Spain, 3 Feb. - 3 Mar. 1992. Major topics considered included shortwave broadcasting, mobile and mobile-satellite service, broadcasting satellite service (sound and HDTV), space services above 20 GHz, and space research. Considerable attention was given to the congested 1-3 GHz band in general and to Low Earth Orbit (LEO) Mobile-Satellite Service, including 'little' LEO's operating below 1 GHz and to 'big' LEO's operating above 1 GHz. Significant new allocations were made for generic Mobile-Satellite Services (MSS). Proposals for allocations for uplink power control beacons and for space research received favorable treatment.

Flock, Warren L.

Space transportation alternatives for large space programs - The International Space University summer session - 1992

The issues discussed in this paper are the result of a 10-week study by the Space Solar Power Program design project members and the Space Transportation Group at the International Space University (ISU) summer session of 1992 to investigate new paradigms in space propulsion and how those paradigms might reduce the costs for large space programs. The program plan was to place a series of power satellites in Earth orbit. Several designs were studied where many kW, MW or GW of power would be transmitted to Earth or to other spacecraft in orbit. During the summer session, a space solar power system was also detailed and analyzed. At ISU, the focus of the study was to foster and develop some of the new paradigms that may eliminate the barriers to low cost for space exploration and exploitation. Many international and technical aspects of a large multinational program were studied. Environmental safety, space construction and maintenance, legal and policy issues of frequency allocation, technology transfer and control and many other areas were addressed.

Palaszewski, Bryan

Space transportation alternatives for large space programs: The International Space University Summer Session, 1992

In 1992, the International Space University (ISU) held its Summer Session in Kitakyushu, Japan. This paper summarizes and expands upon some aspects of space solar power and space transportation that were considered during that session. The issues discussed in this paper are the result of a 10-week study by the Space Solar Power Program design project members and the Space Transportation Group to investigate new paradigms in space propulsion and how those paradigms might reduce the costs for large space programs. The program plan was to place a series of power satellites in Earth orbit. Several designs were studied where many kW, MW, or GW of power would be transmitted to Earth or to other spacecraft in orbit. During the summer session, a space solar power system was also detailed and analyzed. A high-cost space transportation program is potentially the most crippling barrier to such a space power program. At ISU, the focus of the study was to foster and develop some of the new paradigms that may eliminate the barriers to low cost for space exploration and exploitation. Many international and technical aspects of a large multinational program were studied. Environmental safety, space construction and maintenance, legal and policy issues of frequency allocation, technology transfer and control and many other areas were addressed. Over 120 students from 29 countries participated in this summer session. The results discussed in this paper, therefore, represent the efforts of many nations.

Palaszewski, Bryan A.

A Model-based Approach to Controlling the ST-5 Constellation Lights-Out Using the GMSEC Message Bus and Simulink

Space Technology 5 (ST-5) is a three-satellite constellation, technology validation mission under the New Millennium Program at NASA to be launched in March 2006. One of the key technologies to be validated is a lights-out, model-based operations approach to be used for one week to control the ST-5 constellation with no manual intervention. The ground architecture features the GSFC Mission Services Evolution Center (GMSEC) middleware, which allows easy plugging in of software components and a standardized messaging protocol over a software bus. A predictive modeling tool built on MatLab's Simulink software package makes use of the GMSEC standard messaging protocol to interface to the Advanced Mission Planning System (AMPS) Scenario Scheduler which controls all activities, resource allocation and real-time re-profiling of constellation resources when non-nominal events occur. The key features of this system, which we refer to as the ST-5 Simulink system, are as follows: Original daily plan is checked to make sure that predicted resources needed are available by comparing the plan against the model. As the plan is run in real-time, the system re-profiles future activities in real-time if planned activities do not occur in the predicted timeframe or fashion. Alert messages are sent out on the GMSEC bus by the system if future predicted problems are detected. This will allow the Scenario Scheduler to correct the situation before the problem happens. The predictive model is evolved automatically over time via telemetry updates thus reducing the cost of implementing and maintaining the models by an order of magnitude from previous efforts at GSFC such as the model-based system built for MAP in the mid-1990's. This paper will describe the key features, lessons learned and implications for future missions once this system is successfully validated on-orbit in 2006.

Witt, Kenneth J.

Development of a Smooth Trajectory Maneuver Method to Accommodate the Ares I Flight Control Constraints

Six degree-of-freedom (DOF) launch vehicle trajectories are designed to follow an optimized 3-DOF reference trajectory. A vehicle has a finite amount of control power that it can allocate to performing maneuvers. Therefore, the 3-DOF trajectory must be designed to refrain from using 100% of the allowable control capability to perform maneuvers, saving control power for handling off-nominal conditions, wind gusts and other perturbations. During the Ares I trajectory analysis, two maneuvers were found to be hard for the control system to implement; a roll maneuver prior to the gravity turn and an angle of attack maneuver immediately after the J-2X engine start-up. It was decided to develop an approach for creating smooth maneuvers in the optimized reference trajectories that accounts for the thrust available from the engines. A feature of this method is that no additional angular velocity in the direction of the maneuver has been added to the vehicle after the maneuver completion. This paper discusses the equations behind these new maneuvers and their implementation into the Ares I trajectory design cycle. Also discussed is a possible extension to adjusting closed-loop guidance.

Pinson, Robin M.

Workload and Performance in Air Traffic Control: Exploring the Influence of Levels of Automation and Variation in Task Demand

In air traffic control, task demand and workload have important implications for the safety and efficiency of air traffic. Task demand is dynamic, however, research on demand transitions and associated controller perception and performance is limited. In addition, there is a comparatively restricted understanding of the influence of task demand transitions on workload and performance, in association with automation. This study used an air traffic control simulation to investigate the influence of task demand transitions and two conditions of varying automation, on workload and efficiency-related performance. Findings showed that a both the direction of the task demand variation, and the amount of automation, influenced the relationship between workload and performance. Further research is needed to enhance understanding of demand transition and workload history effects on operator experience and performance, in both air traffic control and other safety-critical domains.

air traffic control

Autonomous Mission Operations Roadmap

As light time delays increase, the number of such situations in which crew autonomy is the best way to conduct the mission is expected to increase. However, there are significant open questions regarding which functions to allocate to ground and crew as the time delays increase. In situations where the ideal solution is to allocate responsibility to the crew and the vehicle, a second question arises: should the activity be the responsibility of the crew or an automated vehicle function? More specifically, we must answer the following questions: What aspects of mission operation responsibilities (Plan, Train, Fly) should be allocated to ground based or vehicle based planning, monitoring, and control in the presence of significant light-time delay between the vehicle and the Earth?How should the allocated ground based planning, monitoring, and control be distributed across the flight control team and ground system automation? How should the allocated vehicle based planning, monitoring, and control be distributed between the flight crew and onboard system automation?When during the mission should responsibility shift from flight control team to crew or from crew to vehicle, and what should the process of shifting responsibility be as the mission progresses? NASA is developing a roadmap of capabilities for Autonomous Mission Operations for human spaceflight. This presentation will describe the current state of development of this roadmap, with specific attention to in-space inspection tasks that crews might perform with minimum assistance from the ground.

Mission Operations

On-line upgrade of program modules

This paper presents a taxonomy of problems that must be solved in order to achieve on-line upgradability of long-lived programs, and presents a solution to the fundamental problems in the taxonomy. The solutions are based upon AdaPT, a set of language extensions designed to aid in the distribution of a single Ada program. AdaPT introduces three major units, the public, the partition, and the node. Publics are primarily used to share type information. Partitions are the basic units of distribution while nodes are used to control the configuration of the program. Nodes and partitions can be created dynamically via the allocator. A node-level routine controls the replacement process. The controlling node creates a new instance of the routine being replaced; the run-time system must ensure that the new instance is the updated one. Once access to the new version has been established, all further calls to the module are redirected to the new version and the caller is informed of the change so that it may make subsequent calls directly. When a module is being upgraded, there is a transition period during which both the old and new versions are present. We require that clients of a potentially replaceable module 'check in' with the controlling node. The controlling node keeps track of the number of clients that have been redirected to the replacement. When all have been redirected, the old version can be deallocated.

Waldrop, Raymond S.

Human-Automation Cooperation for Separation Assurance in Future NextGen Environments

A 2012 Human-In-The-Loop air traffic control simulation investigated a gradual paradigm-shift in the allocation of functions between operators and automation. Air traffic controllers staffed five adjacent high-altitude en route sectors, and during the course of a two-week experiment, worked traffic under different function-allocation approaches aligned with four increasingly mature NextGen operational environments. These NextGen time-frames ranged from near current-day operations to nearly fully-automated control, in which the ground systems automation was responsible for detecting conflicts, issuing strategic and tactical resolutions, and alerting the controller to exceptional circumstances. Results indicate that overall performance was best in the most automated NextGen environment. Safe operations were achieved in this environment for twice todays peak airspace capacity, while being rated by the controllers as highly acceptable. However, results show that sector operations were not always safe; separation violations did in fact occur. This paper will describe in detail the simulation conducted, as well discuss important results and their implications.

air traffic control

Controller Inhibition of Automated Conflict Resolutions in a Maximum NextGen Condition

With the continued projection of increases in air traffic density, operations in the National Airspace System are expected to exceed human capabilities in the near future. In order to address the bottleneck of human workload capacity, highly automated safety-critical systems are under development to support air traffic controllers. A human-in-the-loop experiment examined controllers transition through four NextGen automation stages: Current-Day, Minimum, Moderate, and Maximum. Maximum NextGen simulated a fully automated environment where the automation was responsible for detecting and resolving conflicts within simulation parameters in high-density airspace. By allocating these tasks to the automation, the controllers task changed. The human moved to primarily a supervisory position- typically only regaining control over separation assurance tasks during conflict situations deferred by the automation. While tasks were allocated a-priori between the controller and automated agent, controllers maintained authority to inhibit the automation from interacting with particular aircraft. Preliminary work is complete, where significant differences were found in inhibition frequency between simulation participants. However, the contexts in which the controllers inhibited the automation, and their reasons for doing so, remain unclear. This analysis attempts to identity factors contributing to human controllers inhibition of the automation in the Maximum NextGen condition.

adaptable automation

Integrated command, control, communications and computation system functional architecture

The functional architecture for an integrated command, control, communications, and computation system applicable to the command and control portion of the NASA End-to-End Data. System is described including the downlink data processing and analysis functions required to support the uplink processes. The functional architecture is composed of four elements: (1) the functional hierarchy which provides the decomposition and allocation of the command and control functions to the system elements; (2) the key system features which summarize the major system capabilities; (3) the operational activity threads which illustrate the interrelationahip between the system elements; and (4) the interfaces which illustrate those elements that originate or generate data and those elements that use the data. The interfaces also provide a description of the data and the data utilization and access techniques.

Cooley, C. G.

Motion and force control of multiple robotic manipulators

This paper addresses the motion and force control problem of multiple robot arms manipulating a cooperatively held object. A general control paradigm is introduced which decouples the motion and force control problems. For motion control, different control strategies are constructed based on the variables used as the control input in the controller design. There are three natural choices; acceleration of a generalized coordinate, arm tip force vectors, and the joint torques. The first two choices require full model information but produce simple models for the control design problem. The last choice results in a class of relatively model independent control laws by exploiting the Hamiltonian structure of the open loop system. The motion control only determines the joint torque to within a manifold, due to the multiple-arm kinematic constraint. To resolve the nonuniqueness of the joint torques, two methods are introduced. If the arm and object models are available, an optimization can be performed to best allocate the desired and effector control force to the joint actuators. The other possibility is to control the internal force about some set point. It is shown that effective force regulation can be achieved even if little model information is available.

Wen, John T.

Extended cooperative control synthesis

This paper reports on research for extending the Cooperative Control Synthesis methodology to include a more accurate modeling of the pilot's controller dynamics. Cooperative Control Synthesis (CCS) is a methodology that addresses the problem of how to design control laws for piloted, high-order, multivariate systems and/or non-conventional dynamic configurations in the absence of flying qualities specifications. This is accomplished by emphasizing the parallel structure inherent in any pilot-controlled, augmented vehicle. The original CCS methodology is extended to include the Modified Optimal Control Model (MOCM), which is based upon the optimal control model of the human operator developed by Kleinman, Baron, and Levison in 1970. This model provides a modeling of the pilot's compensation dynamics that is more accurate than the simplified pilot dynamic representation currently in the CCS methodology. Inclusion of the MOCM into the CCS also enables the modeling of pilot-observation perception thresholds and pilot-observation attention allocation affects. This Extended Cooperative Control Synthesis (ECCS) allows for the direct calculation of pilot and system open- and closed-loop transfer functions in pole/zero form and is readily implemented in current software capable of analysis and design for dynamic systems. Example results based upon synthesizing an augmentation control law for an acceleration command system in a compensatory tracking task using the ECCS are compared with a similar synthesis performed by using the original CCS methodology. The ECCS is shown to provide augmentation control laws that yield more favorable, predicted closed-loop flying qualities and tracking performance than those synthesized using the original CCS methodology.

Davidson, John B.

Frequency Allocations for Unmanned Aircraft Systems in the National Airspace. Access 5 White Paper to the WRC Advisory Committee

A critical aspect of the Access 5 program is identifying appropriate spectrum for civil and commercial purposes. However, currently, there is no spectrum allocated for the command/control link between the aircraft control station and the unmanned aircraft. Until such frequency spectrum is allocated and approved, it will be difficult for the UAS community to obtain civil airworthiness certification and operate in the NAS on a routine basis. This document provides a perspective from the UAS community on Agenda Items being considered for the upcoming World Radiocommunication Conference 2007 (WRC 07). Primarily, it supports the proposal to add Aeronautical Mobile (Route) Services (AM(R)S) to existing bands that could be used for UAS Line-of-Sight operations. It also recommends the need to identify spectrum that could be used for an Aeronautical Mobile Satellite (Route) Service (AMS(R)S) that would allow UAS to operate Beyond Line-of-Sight. If spectrum is made available to provide these services, it will then be incumbent upon the UAS community to justify their use of this spectrum as well as the assurance that they will not interfere with other users of this newly allocated spectrum.

Source record

Cassini Attitude Control Operations Flight Rules and How They are Enforced

The Cassini spacecraft was launched on October 15, 1997 and arrived at Saturn on June 30, 2004. It has performed detailed observations and remote sensing of Saturn, its rings, and its satellites since that time. Cassini deployed the European-built Huygens probe which descended through the Titan atmosphere and landed on its surface on January 14, 2005. Operating the Cassini spacecraft is a complex scientific, engineering, and management job. In order to safely operate the spacecraft, a large number of flight rules were developed. These flight rules must be enforced throughout the lifetime of the Cassini spacecraft. Flight rules are defined as any operational limitation imposed by the spacecraft system design, hardware, and software, violation of which would result in spacecraft damage, loss of consumables, loss of mission objectives, loss and/or degradation of science, and less than optimal performance. Flight rules require clear description and rationale. Detailed automated methods have been developed to insure the spacecraft is continuously operated within these flight rules. An overview of all the flight rules allocated to the Cassini Attitude Control and Articulation Subsystem and how they are enforced is presented in this paper.

Burk, Thomas