Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Logistics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Beyond 'Inop': Logbook Communication Between Airline Mechanics and Pilots

When mechanical discrepancies occur on aircraft, effective communication between pilots and mechanics can facilitate identification of the problem. A survey of pilots and mechanics was conducted to determine how often they were able to discuss discrepancies directly and to identify factors that influenced the detail they provided about discrepancies in the aircraft logbook. Logistical factors such as short turn times between flights and crew schedules appeared to present barriers to face-to-face meetings between pilots and mechanics. Guidelines for pilot logbook entries. Pilots reported receiving significantly less training on writing logbook entries and spent significantly less time making individual entries than mechanics. Mechanics indicated greater concern about the Federal Aviation Administration reading their entries than pilots. Mechanics indicated they had little opportunity to follow up with pilots to clarify a logbook entry once pilots departed the aircraft.

Munro, Pamela A.↗

Constellation's First Flight Test: Ares I-X

On October 28, 2009, NASA launched Ares I-X, the first flight test of the Constellation Program that will send human beings to the Moon and beyond. This successful test is the culmination of a three-and-a-half-year, multi-center effort to design, build, and fly the first demonstration vehicle of the Ares I crew launch vehicle, the successor vehicle to the Space Shuttle. The suborbital mission was designed to evaluate the atmospheric flight characteristics of a vehicle dynamically similar to Ares I; perform a first stage separation and evaluate its effects; characterize and control roll torque; stack, fly, and recover a solid-motor first stage testing the Ares I parachutes; characterize ground, flight, and reentry environments; and develop and execute new ground hardware and procedures. Built from existing flight and new simulator hardware, Ares I-X integrated a Shuttle-heritage four-segment solid rocket booster for first stage propulsion, a spacer segment to simulate a five-segment booster, Peacekeeper axial engines for roll control, and Atlas V avionics, as well as simulators for the upper stage, crew module, and launch abort system. The mission leveraged existing logistical and ground support equipment while also developing new ones to accommodate the first in-line rocket for flying astronauts since the Saturn IB last flew from Kennedy Space Center (KSC) in 1975. This paper will describe the development and integration of the various vehicle and ground elements, from conception to stacking in KSC s Vehicle Assembly Building; hardware performance prior to, during, and after the launch; and preliminary lessons and data gathered from the flight. While the Constellation Program is currently under review, Ares I-X has and will continue to provide vital lessons for NASA personnel in taking a vehicle concept from design to flight.

Davis, Stephan R.↗

Habitat Demonstration Unit Project Leadership and Management Strategies

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

HDU Deep Space Habitat (DSH) Overview

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project Deep Space Habitat (DSH) analog that will be field-tested during the 2011 Desert Research and Technologies Studies (D-RATS) field tests. The HDU project is a technology pull project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU Pressurized Excursion Module (PEM) that was field tested in the 2010 D-RATS, adding habitation functionality to the prototype unit. The 2010 configuration of the HDU-PEM consisted of a lunar surface laboratory module that was used to bring over 20 habitation-related technologies together in a single platform that could be tested as an advanced habitation analog in the context of mission architectures and surface operations. The 2011 HDU-DSH configuration will build upon the PEM work, and emphasize validity of crew operations (habitation and living, etc), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The HDU project consists of a multi-center team brought together in a skunkworks approach to quickly build and validate hardware in analog environments. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 analog field test will include Multi Mission Space Exploration Vehicles (MMSEV) and the DSH among other demonstration elements to be brought together in a mission architecture context. This paper will describe overall objectives, various habitat configurations, strategic plan, and technology integration as it pertains to the 2011 field tests.

Kennedy, Kriss J.↗

NASA Space Flight Vehicle Fault Isolation Challenges

The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discrete programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as testability of the integrated flight vehicle especially problematic. The cost of fully automated diagnostics can be completely justified for a large fleet, but not so for a single flight vehicle. Fault detection is mandatory to assure the vehicle is capable of a safe launch, but fault isolation is another issue. SLS has considered various methods for fault isolation which can provide a reasonable balance between adequacy, timeliness and cost. This paper will address the analyses and decisions the NASA Logistics engineers are making to mitigate risk while providing a reasonable testability solution for fault isolation.

Bramon, Christopher↗

Lunar Surface Cargo Offloading Concepts

A sustainable presence on the lunar surface will serve as a vital training ground and technology demonstration test site in preparation for future human missions to Mars. Robotic lunar surface campaigns will focus on the exploration of resources providing information on the availability and extraction of usable resources, such as oxygen and water, and prepare the surface for a sustained human presence. Landers, outfitted with sensor packages, will be used to conduct risk-reduction activities and aid in the development of technologies prior to the crewed lunar missions that drive the need to for a logistics supply chain that requires offloading. A series of landers will be required on other planetary surfaces to build up the capabilities, capitalizing on those resources, required for sustained human presence. In each of those landers will be cargo including ascent vehicles, habitats, supplies, science packages, spare parts, fluids commodities for fuel and life support, and others varying in volume and ranging from mass in hundreds of kilograms to an estimated 6-14 metric tons to support Human Landing Systems and surface logistics requirements. This paper will examine the challenge of offloading examples of these cargo elements from different categories of landers on the lunar surface using a variety of methodologies. Challenges on the lunar surface arise with the conditions present (thermal, lighting, communications, regolith consistency), the desire to minimize mass of all landed systems, the desire to perform much of the activities with limited to minimal human interaction, and the overall configuration of the landers that are responsible for landing the cargo.

Lunar↗

Lunar Surface Cargo Offloading Concepts

A sustainable presence on the lunar surface will serve as a vital training ground and technology demonstration test site in preparation for future human missions to Mars. Robotic lunar surface campaigns will focus on the exploration of resources providing information on the availability and extraction of usable resources, such as oxygen and water, and prepare the surface for a sustained human presence. Landers, outfitted with sensor packages, will be used to conduct risk-reduction activities and aid in the development of technologies prior to the crewed lunar missions that drive the need to for a logistics supply chain that requires offloading. A series of landers will be required on other planetary surfaces to build up the capabilities, capitalizing on those resources, required for sustained human presence. In each of those landers will be cargo including ascent vehicles, habitats, supplies, science packages, spare parts, fluids commodities for fuel and life support, and others varying in volume and ranging from mass in hundreds of kilograms to an estimated 6-14 metric tons to support Human Landing Systems and surface logistics requirements. This paper will examine the challenge of offloading examples of these cargo elements from different categories of landers on the lunar surface using a variety of methodologies. Challenges on the lunar surface arise with the conditions present (thermal, lighting, communications, regolith consistency), the desire to minimize mass of all landed systems, the desire to perform much of the activities with limited to minimal human interaction, and the overall configuration of the landers that are responsible for landing the cargo.

Lunar↗

Closing the Loop on Space Trash / Is a Circular Economy Possible?

A crew member will nominally consume 2.5 kg of water per crew-member per day, rejectapproximately 0.032 kg of dry fecal solid waste per crew member per day (dry basis)and generate approximately 2,122 kg of logistical waste per year on a long-durationcrewed mission. This topic seeks to push the conversation towards completing a closedloop system and circular economy for all materials and recoverable resources withregard to waste management, regenerative water use, and recycling. In all aspects,reduction of crew maintenance time, mass, power and volume are at the forefront oftechnology development. In addition, the longevity and hardware robustness is important(lasting >3 years). Overall water recovery of >98% is desired, as well as, condensingheat exchangers that remove water from air with collection rates up to 1.45 kg of waterper hour. There are many technologies on the ground being developed for recycling andtrash management or regenerative water use that have yet to introduce themselves forspace development and infusion. Here we look to open the conversation and cross cutthese platforms to bring out some innovation and exposure into the hidden crevasses ofthe waste that humans create and how to minimize it/repurpose it, for all of humanity.

ISRU↗

Space station systems analysis study. Part 2, volume 3: Appendixes, Book 2: Supporting data (7 through 18)

Topics discussed include: (1) design considerations for a MARS sample return laboratory module for space station investigations; (2) crew productivity as a function of work shift arrangement; (3) preliminary analysis of the local logistics problem on the space construction base; (4) mission hardware construction operational flows and timelines; (5) orbit transfer vehicle concept definition; (6) summary of results and findings of space processing working review; (7) crew and habitability subsystem (option L); (8) habitability subsystem considerations for shuttle tended option L; (9) orbiter utilization in manned sortie missions; (10) considerations in definition of space construction base standard module configuration (option L); (11) guidance, control, and navigation subsystems; and (12) system and design tradeoffs.

Source record↗

Large-Scale Spacecraft Fire Safety Experiments in ISS Resupply Vehicles

Our understanding of the fire safety risk in manned spacecraft has been limited by the small scale of the testing we have been able to conduct in low-gravity. Fire growth and spread cannot be expected to scale linearly with sample size so we cannot make accurate predictions of the behavior of realistic scale fires in spacecraft based on the limited low-g testing to date. As a result, spacecraft fire safety protocols are necessarily very conservative and costly. Future crewed missions are expected to be longer in duration than previous exploration missions outside of low-earth orbit and accordingly, more complex in terms of operations, logistics, and safety. This will increase the challenge of ensuring a fire-safe environment for the crew throughout the mission. Based on our fundamental uncertainty of the behavior of fires in low-gravity, the need for realistic scale testing at reduced gravity has been demonstrated. To address this concern, a spacecraft fire safety research project is underway to reduce the uncertainty and risk in the design of spacecraft fire safety systems by testing at nearly full scale in low-gravity. This project is supported by the NASA Advanced Exploration Systems Program Office in the Human Exploration and Operations Mission Directorate. The activity of this project is supported by an international topical team of fire experts from other space agencies to maximize the utility of the data and to ensure the widest possible scrutiny of the concept. The large-scale space flight experiment will be conducted on three missions; each in an Orbital Sciences Corporation Cygnus vehicle after it has deberthed from the ISS. Although the experiment will need to meet rigorous safety requirements to ensure the carrier vehicle does not sustain damage, the absence of a crew allows the fire products to be released into the cabin. The tests will be fully automated with the data downlinked at the conclusion of the test before the Cygnus vehicle reenters the atmosphere. The international topical team is collaborating with the NASA team in the definition of the experiment requirements and performing supporting analysis, experimentation and technology development.

Combustion↗

Developing Mars-Based Clinical Scenarios for an Earth Independent Medical Operations (EIMO) – Based Decision Support Service

As crewed missions move beyond Low-Earth Orbit, pre-mission planning cannot fully buy down the medical risks of exploration-class missions. Martian missions, where increased hazards exist, (such as long-duration spaceflight, surface-level EVA operations, and communications delays) will require a paradigm shift in the structure of a medical system. An Earth-Independent Medical Operations-based Medical System (EIMO-MS) will need to optimize four critical domains to help provide medical care: utilization of Pre-Mission Planning, augmentation of Acute and Prolonged Medical Decision Making, automated tracking of Resource Management, and assistance in Task Load Balance. The ideal EIMO-MS will be able to accomplish this goal by having an interactive, adaptable interface that will be able to provide real-time medical services. It must respond based on the level of crewmember training, medical situation, and available medical and non-medical resources. To showcase the capabilities and requirements of such a sophisticated automated MS, a series of clinical scenarios of escalating complexity were developed with clinical and systems engineering input. These scenarios describe in clinical detail what a theoretical future medical system, enhanced with multiple information streams (such as a medical database, an AI-based Decision Support System, real-time monitoring, enhanced in-situ laboratory imaging, etc.) can achieve in conjunction with a trained and experienced crew. Scenarios are comprised of: a context section including objectives and applicable spaceflight environment, a highlighted assumptions section, a clinical narrative section, and a systems engineering activity diagram demonstrating the integrated Medical System (MS). The “swim lanes” of the activity diagram act as the logistical core of each scenario and show how the MS will interact with the crew, ground support, and other in-flight systems. The Design Reference Mission that is used for the scenarios is based on existing reference mission profiles [1] with a projected 30-sol stay on the Martian surface. Scenarios span the spectrum from planned evaluations, minor medical care, urgent care, surgical guidance, critical and expectant management, and behavioral health care. Mission complexity will exponentially increase during deep space and Mars exploration-class missions, and medical support for these missions will likewise need to increase in autonomy and adaptability. The integrated system that will support these missions will need to provide assistance in a variety of anticipated and unforeseen scenarios. These medical scenarios, guided by clinician input, are initial steps in crafting the requirements for an EIMO-based medical system. By working in a systems engineering framework, requirements and capabilities can be extracted and mapped while maintaining a clinical core.

Prashant Parmar↗

STS-108 Mission Highlights Resource Tape

A continuation of 'STS-108 Mission Highlights Resource Tape, Part 1 of 3' (internal ID 2002049331) and 'STS-108 Mission Highlights Resource Tape, Part 2 of 3' (internal ID 2002049330), this video shows footage from flight days 9-12. The control of the International Space Station (ISS) is handed from the Expedition 3 crew (Commander Frank Culbertson, Jr. and Flight Engineers Mikhail Turin and Vladimir Dezhurov) to the Expedition 4 crew (Commander Yuri Onufrienko and Flight Engineers Carl Walz and Daniel Bursch) in an on-orbit ceremony. Both Expedition crews and the STS-108 crew (Commander Dominic Gorie, Pilot Mark Kelly, and Mission Specialists Linda Godwin and Daniel Tani) are seen reloading the Rafaello Multipurpose Logistics Module (MPLM). External shots show the MPLM demating from the ISS and returning to the payload bay of Endeavour. The three crews bid farewell to each other before closing the hatches between ISS and Endeavour. The orbiter undocks from ISS and performs its flyarounds. ISS is seen against a backdrop of stars as Endeavour flies away. On the return flight to Earth, the Starshine 2 satellite is deployed. The video ends with the orbiter's landing as seen from several viewpoints.

Source record↗

Maintainable design for Space Station Freedom

Space Station Freedom poses a unique challenge from the standpoint-of-logistical support and maintainability. There is limited on-orbit stowage volume available for supply of replacement parts for critical systems, and crew time required for maintenance and repair of on-board systems is an extremely valuable commodity. These considerations, plus the high cost of ground-to-orbit resupply, give special importance to the consideration of maintainability in system design. Use of common parts and system redundancy have important influences on logistics and maintenance requirements, and the requirements for specialized crew training and tools are directly related to system design for maintainability. This paper describes the approach for maintainable design of Space Station Freedom systems.

Hopson, George D.↗

STS-106 Crew Activity Report/Flight Day 8 Highlights

On this eighth day of the STS-106 Atlantis mission, the flight crew, Commander Terrence W. Wilcutt, Pilot Scott T. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov move into the second half of preparing the International Space Station (ISS) for its first resident crew. Lu and Malenchenko are seen installing the power converters in the Zvezda module and components of the primary oxygen generation system. Mastracchio and Wilcutt moves supplies and logistics from the payload of Atlantis to the ISS. Wilcutt and Altman participate in several interviews and the crew wishes the Olympiads in Sydney good luck in their endeavors. Scenes also include external views of the ISS and images of Earth, including Sydney, Australia.

Source record↗

Human factors in space station architecture 1: Space station program implications for human factors research

The space station program is based on a set of premises on mission requirements and the operational capabilities of the space shuttle. These premises will influence the human behavioral factors and conditions on board the space station. These include: launch in the STS Orbiter payload bay, orbital characteristics, power supply, microgravity environment, autonomy from the ground, crew make-up and organization, distributed command control, safety, and logistics resupply. The most immediate design impacts of these premises will be upon the architectural organization and internal environment of the space station.

Cohen, M. M.↗

Rendezvous Integration Complexities of NASA Human Flight Vehicles

Propellant-optimal trajectories, relative sensors and navigation, and docking/capture mechanisms are rendezvous disciplines that receive much attention in the technical literature. However, other areas must be considered. These include absolute navigation, maneuver targeting, attitude control, power generation, software development and verification, redundancy management, thermal control, avionics integration, robotics, communications, lighting, human factors, crew timeline, procedure development, orbital debris risk mitigation, structures, plume impingement, logistics, and in some cases extravehicular activity. While current and future spaceflight programs will introduce new technologies and operations concepts, the complexity of integrating multiple systems on multiple spacecraft will remain. The systems integration task may become more difficult as increasingly complex software is used to meet current and future automation, autonomy, and robotic operation requirements.

Brazzel, Jack P.↗

Assessment of Ultrasound Devices to Protect the Health of Astronauts in the New Era of Space Exploration: A Literature Review

Microgravity and radiation of space create harsh physiological strains on astronauts with significant damaging effects on cardiovascular and musculoskeletal systems among others. It is necessary to utilize medical technologies that can effectively monitor chronic and acute alterations to astronauts’ health statuses on spacecrafts. Future missions to distant planetary bodies will result in longer exposure to damaging environmental factors and limit crew access to healthcare resources and maintenance devices; thus, even greater logistical and quality considerations must be made. Remarkable advancements in ultrasound technology have created new powerful portable imaging devices and a potential chip-based alternative to piezoelectric crystals that are used in nearly all ultrasound devices. This literature review will investigate new commercial and prototypal ultrasound medical devices on their potential effectiveness in austere environments such as space. The accuracy, versatility, and practicality of each device will be compared to each other as well as the current technological gold standards of health monitoring used in traditional healthcare settings. Assessment of new ultrasound technology in this literature review will provide guidance to future missions by space agencies regarding the most optimal medical devices to protect astronauts and, therefore, enable further exploration of distant planets and solar systems.

Parag Vyas↗