Search NASA⌕ Search

SEARCH · Search NASA

Results for “DELTA PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Roentgensatellit (ROSAT)

The DSN (Deep Space Network) mission support requirements for ROSAT (Roentgensatellit) are summarized. ROSAT is an international cooperative program between NASA and the Bundesministerium fuer Forschung and Technologie (BMFT). The satellite was launched on a Delta 2 vehicle and placed in a circular orbit at an altitude of 580 km, with a 53-deg inclination. The mission objectives are outlined and the DSN support requirements are defined through the presentation of tables and narratives describing the spacecraft flight profile; DSN support coverage; frequency assignments; support parameters for telemetry and command; and tracking support responsibility.

Guckenbiehl, F.↗

Remote Sensing Spinoff

Delta Data Systems Inc., founded by ex-NASA engineers, used ELAS, a COSMIC-provided computer program for processing remotely sensed data as a starting point for its development of ATLAS. ATLAS is used to process satellite and aircraft data, to digitize soil topographic maps, and to generate land use maps. Among its applications are medical digital processing, food processing, and specialized services for the remote sensing community.

Source record↗

Dawn: Cooperation, not Control

On September 27, 2007, a Delta II rocket carrying the Dawn spacecraft lifted off from Kennedy Space Center. Part of NASAs Discovery program, the $370 million Dawn mission began its three-billion-mile voyage to the asteroid belt to study the asteroid Vesta and Ceres, a dwarf planet. The spacecraft is scheduled to reach Vesta in 2011. After spending nine months measuring the composition, shape, and topography of that body, it will travel a billion miles to carry out a similar analysis of Ceres in 2015. The Important Lessons: The demands of Dawn and other challenging missions have taught some important lessons for successful program and project management. These are the main ones: a) Program management, particularly of uncoupled and loosely coupled projects, should be more about enabling than controlling. You're working with motivated, high-performing teams and institutions with a track record of quality and success. Emphasize commander's intent over rudder control; let them know where you want to go and when you want to be there, then let them figure out how to get there. b) Open and honest discussion of issues is essential. People fill the void of the unknown with their worst fears. Get folks around the table and have open, honest, and frank dialogue. I've seldom seen this fail to get to the root of issues. c) You have to earn your seat at the table, proving that you are competent, trustworthy, and dedicated to the success of the mission. d) Know when to fold 'em. Your pride can get rolled up in making a milestone or launch date, but you have to make a judgment based on the realities of the situation and not wear down the team trying to meet an increasingly impossible deadline. e) The NASA governance model that gives a voice to the concerns of engineers and safety experts works-trust it and use it.

May, Todd↗

Friction Stir Weld Application and Tooling Design for the Multi-purpose Crew Vehicle Stage Adapter

The Multi-Purpose Crew Vehicle (MPCV), commonly known as the Orion capsule, is planned to be the United States' next manned spacecraft for missions beyond low earth orbit. Following the cancellation of the Constellation program and creation of SLS (Space Launch System), the need arose for the MPCV to utilize the Delta IV Heavy rocket for a test launch scheduled for 2014 instead of the previously planned Ares I rocket. As a result, an adapter (MSA) must be used in conjunction with the MPCV to account for the variation in diameter of the launch vehicles; 5.5 meters down to 5.0 meters. Prior to ight article fabrication, a path nder (test article) will be fabricated to ne tune the associated manufacturing processes. The adapter will be comprised of an aluminum frustum (partial cone) that employs isogrid technology and circumferential rings on each end. The frustum will be fabricated by friction stir welding (FSW) three individual panels together on a Vertical Weld Tool (VWT) at NASA Marshall Space Flight Center. Subsequently, each circumferential ring will be friction stir welded to the frustum using a Robotic Weld Tool (RWT). The irregular geometry and large mass of the MSA require that extensive tooling preparation be put into support structures for the friction stir weld. The tooling on the VWT will be comprised of a set of conveyors mounted on pre-existing stanchions so that the MSA will have the ability to be rotated after each of the three friction stir welds. The tooling requirements to friction stir weld the rings with the RWT are somewhat more demanding. To support the mass of the MSA and resist the load of the weld tool, a system of mandrels will be mounted to stanchions and assembled in a circle. The goal of the paper will be to explain the design, fabrication, and assembly of the tooling, to explain the use of friction stir welding on the MSA path nder, and also to discuss the lessons learned and modi cations made in preparation for ight article fabrication in support of the 2014 launch of the Orion MPCV.

Alcorn, John↗

Beam Performance of the Positron Transport Line for CEBAF Positron Upgrade

The Low Energy Recirculator Facility (LERF) at Jefferson Lab, formerly operated for the Free-Electron Laser program, has been proposed as the injector complex for the planned 12 GeV CEBAF positron upgrade (Ce+BAF), with an additional pathway to support a potential 22 GeV CEBAF electron upgrade. In this configuration, LERF would generate and pre-accelerate positrons to 123 MeV, matching the present injection energy into the North Linac. Due to the relatively large emittance expected from the positron source, a comprehensive acceptance study has been performed from LERF through the CEBAF recirculating linacs and beam transport lines to the experimental halls. The objective is to establish the positron phase-space acceptance and provide design feedback to the positron production and capture systems. Furthermore, given CEBAF’s capability to deliver highly polarized beams, spin-tracking simulations have been carried out including magnet imperfections, alignment errors, and synchrotron-radiation–induced energy spread. Particular attention is given to the evolution of the spin tune and the corresponding depolarization mechanisms along the beam delivery path, especially for providing longitudinal polarization at the experimental halls. These results inform injector design choices and assess the overall feasibility of delivering high-polarization positron beams in CEBAF.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Solar heating of the Martian dusty atmosphere

This paper examines the solar heating of the Martian atmosphere during the 1971 global dust storm observed by Mariner 9. Radiative scattering as well as absorption is included by utilizing the delta-Eddington approximation to the full radiative transfer equation. The necessary optical parameters are generated by a Mie program which uses a size distribution and a complex refractive index inferred from a number of sources, particularly from recent analyses of Mariner 9 UVS and TV observations. When uniform mixing of the dust is assumed, the solar heating per unit mass during a Martian global dust storm is remarkably uniform with height for small solar zenith angles. Heating rates may reach 80 K/day for overhead sunlight. Overall, 20% of the direct insolation is absorbed by the dust-laden atmosphere. Even optically thin widespread dust hazes may produce heating rates of several degrees Kelvin per day.

Zurek, R. W.↗

Research, planning, design and development of selected components, subsystems and systems for the Students for the Exploration and Development of Space Satellite (SEDSAT)

The work proposed in this task order was successfully accomplished. This is reflected in the approval by three NASA centers of the SEDSAT satellite to fly as a payload on the shuttle. All documentation necessary for evaluation of the satellite as a Shuttle payload was submitted and approved by the appropriate safety boards. The SEASIS instrument was demonstrated to work and its inclusion as a SEDSAT payload was accomplished in the task period. Finally, the SEDSAT interface to the NASA GSFC PES was approved by MSFC and GSFC with no substantive issues outstanding. As of the end of the contract date all milestones were met. However the NASA MSFC SEDS program was cancelled by the center. Since that time SEDSAT has gone on to be manifested on a Delta vehicle.

Wingo, Dennis↗

Research and Development of Satellites, Small Expendable Deployer System (SEDS)

The work proposed in this task order was successfully accomplished. This is reflected in the approval by three NASA centers of the Students for the Exploration and Development of Space Satellite (SEDSAT) to fly as a payload on the shuttle. All documentation necessary for evaluation of the satellite as a Shuttle payload was submitted and approved by the appropriate safety boards. The Small Expendable Deployer System - SEDS - Earth Atmosphere and Space Imaging System (SEASIS) instrument was demonstrated to work and its inclusion as a SEDSAT payload was accomplished in the task period. Finally, the SEDSAT interface to the NASA GSFC PES was approved by MSFC and GSFC with no substantive issues outstanding. As of the end of the contract date all milestones were met. However the NASA MSFC SEDS program was canceled by the center. Since that time SEDSAT has gone on to be manifested on a Delta vehicle.

Wingo, Dennis Ray↗

Program of Research in Flight Dynamics in the JIAFS, George Washington University at NASA Langley Research Center

The program objectives are fully defined in the original proposal entitled 'Program of Research in Flight Dynamics in GW at NASA Langley Research Center,' which was originated March 20, 1975, and in the renewals of the research program from December 1, 2000 to November 30, 2001. The program in its present form includes three major topics: 1) the improvement of existing methods and development of new methods for wind tunnel and flight test data analysis, 2) the application of these methods to wind tunnel and flight test data obtained from advanced airplanes, 3) the correlation of flight results with wind tunnel measurements, and theoretical predictions. The Principal Investigator of the program is Dr. Vladislav Klein. Three Graduate Research Scholar Assistants (K. G. Mas, M. M. Eissa and N. M. Szyba) also participated in the program. Specific developments in the program during the period Dec. 1, 2001 through Nov. 30, 2002 included: 1) Data analysis of highly swept delta wing aircraft from wind and water tunnel data, and 2) Aerodynamic characteristics of the radio control aircraft from flight test.

Klein, Vladislav↗

Ensuring Safe Exploration: Ares Launch Vehicle Integrated Vehicle Ground Vibration Testing

Ground vibration testing has been an integral tool for developing new launch vehicles throughout the space age. Several launch vehicles have been lost due to problems that would have been detected by early vibration testing, including Ariane 5, Delta III, and Falcon 1. NASA will leverage experience and testing hardware developed during the Saturn and Shuttle programs to perform ground vibration testing (GVT) on the Ares I crew launch vehicle and Ares V cargo launch vehicle stacks. NASA performed dynamic vehicle testing (DVT) for Saturn and mated vehicle ground vibration testing (MVGVT) for Shuttle at the Dynamic Test Stand (Test Stand 4550) at Marshall Space Flight Center (MSFC) in Huntsville, Alabama, and is now modifying that facility to support Ares I integrated vehicle ground vibration testing (IVGVT) beginning in 2012. The Ares IVGVT schedule shows most of its work being completed between 2010 and 2014. Integrated 2nd Stage Ares IVGVT will begin in 2012 and IVGVT of the entire Ares launch stack will begin in 2013. The IVGVT data is needed for the human-rated Orion launch vehicle's Design Certification Review (DCR) in early 2015. During the Apollo program, GVT detected several serious design concerns, which NASA was able to address before Saturn V flew, eliminating costly failures and potential losses of mission or crew. During the late 1970s, Test Stand 4550 was modified to support the four-body structure of the Space Shuttle. Vibration testing confirmed that the vehicle's mode shapes and frequencies were better than analytical models suggested, however, the testing also identified challenges with the rate gyro assemblies, which could have created flight instability and possibly resulted in loss of the vehicle. Today, NASA has begun modifying Test Stand 4550 to accommodate Ares I, including removing platforms needed for Shuttle testing and upgrading the dynamic test facilities to characterize the mode shapes and resonant frequencies of the vehicle. The IVGVT team expects to collect important information about the new launch vehicles, greatly increasing astronaut safety as NASA prepares to explore the Moon and beyond.

Tuma, M. L.↗

The Effects of Reducing the Structural Mass of the Transit Habitat on the Cryogenic Propellant Required for a Human Phobos Mission

A technique for rapidly determining the relationship between the pressurized volume, structural mass and the cryogenic propellant required to be delivered to Earth orbit for a Mars Transit Habitat is provided. This technique is based on assumptions for the required delta-V's, the Exploration Upper Stage performance and the historical structural masses for human spacecraft from Mercury Program through the International Space Station. If the Mars Transit Habitat is constructed from aluminum, structural mass estimates based on the habitat pressurized volume are accurate to within 15%. Other structural material options for the Mars Transit Habitat are also evaluated. The results show that small, achievable reductions in the structural mass of the Transit Habitat can save tens of thousands of pounds of cryogenic propellant that need to be delivered to Earth orbit for a human Phobos Mission.

Zipay, John Joseph↗

The Effects of Reducing the Structural Mass of the Transit Habitat on the Cryogenic Propellant Required for a Human Phobos Mission

A technique for rapidly determining the relationship between the pressurized volume, structural mass and the cryogenic propellant required to be delivered to Earth orbit for a Mars Transit Habitat is provided. This technique is based on assumptions for the required delta-V's, the Exploration Upper Stage performance and the historical structural masses for human spacecraft from Mercury Program through the International Space Station. If the Mars Transit Habitat is constructed from aluminum, structural mass estimates based on the habitat pressurized volume are accurate to within 15 percent. Other structural material options for the Mars Transit Habitat are also evaluated. The results show that small, achievable reductions in the structural mass of the Transit Habitat can save tens of thousands of pounds of cryogenic propellant that need to be delivered to Earth orbit for a human Phobos Mission.

Zipay, John J.↗

Impact of Drift on the Vehicle Liftoff Acoustic Environments

As a launch vehicle lifts off the pad, depending on the flyaway maneuver, it will drift away from the exhaust hole causing the plume(s) to impinge on the launch deck. This impingement on the deck creates acoustic sources and causes the noise levels on the vehicle to increase. The percentage of the plume which impinges on the deck can be calculated and related to sound pressure levels. Using this information, a delta dB can be calculated if the drift or flyaway maneuver for a specific vehicle changes during a program

Kenny, Jeremy↗

RADIO MONITORING OF THE TIDAL DISRUPTION EVENT SWIFT J164449.3+573451. I. JET ENERGETICS AND THE PRISTINE PARSEC-SCALE ENVIRONMENT OF A SUPERMASSIVE BLACK HOLE

We present continued radio observations of the tidal disruption event Swift J164449.3+573451 extending to {delta}t Almost-Equal-To 216 days after discovery. The data were obtained with the EVLA, AMI Large Array, CARMA, the SMA, and the VLBA+Effelsberg as part of a long-term program to monitor the expansion and energy scale of the relativistic outflow, and to trace the parsec-scale environment around a previously dormant supermassive black hole (SMBH). The new observations reveal a significant change in the radio evolution starting at {delta}t Almost-Equal-To 1 month, with a brightening at all frequencies that requires an increase in the energy by about an order of magnitude, and an overall density profile around the SMBH of {rho}{proportional_to}r{sup -3/2} (0.1-1.2 pc) with a significant flattening at r Almost-Equal-To 0.4-0.6 pc. The increase in energy cannot be explained with continuous injection from an L{proportional_to}t{sup -5/3} tail, which is observed in the X-rays. Instead, we conclude that the relativistic jet was launched with a wide range of Lorentz factors, obeying E(> {Gamma}{sub j}){proportional_to}{Gamma}{sup -2.5}{sub j}. The similar ratios of duration to dynamical timescale for Sw 1644+57 and gamma-ray bursts (GRBs) suggest that this result may be applicable to GRB jets as well. The radial density profile may be indicative of Bondi accretion, with the inferred flattening at r {approx} 0.5 pc in good agreement with the Bondi radius for a {approx}few Multiplication-Sign 10{sup 6} M{sub Sun} black hole. The density at {approx}0.5 pc is about a factor of 30 times lower than inferred for the Milky Way Galactic Center, potentially due to a smaller number of mass-shedding massive stars. From our latest observations ({delta}t Almost-Equal-To 216 days) we find that the jet energy is E{sub j,iso} Almost-Equal-To 5 Multiplication-Sign 10{sup 53} erg (E{sub j} Almost-Equal-To 2.4 Multiplication-Sign 10{sup 51} erg for {theta}{sub j} = 0.1), the radius is r Almost-Equal-To 1.2 pc, the Lorentz factor is {Gamma}{sub j} Almost-Equal-To 2.2, the ambient density is n Almost-Equal-To 0.2 cm{sup -3}, and the projected angular size is r{sub proj} Almost-Equal-To 25 {mu}as, below the resolution of the VLBA+Effelsberg. Assuming no future changes in the observed evolution and a final integrated total energy of E{sub j} Almost-Equal-To 10{sup 52} erg, we predict that the radio emission from Sw 1644+57 should be detectable with the EVLA for several decades and will be resolvable with very long baseline interferometry in a few years.

79 ASTRONOMY AND ASTROPHYSICS↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

THE L-{sigma} RELATION OF LOCAL H II GALAXIES

For the first time we present a new data set of emission line widths for 118 star-forming regions in H II galaxies (HIIGs). This homogeneous set is used to investigate the L-{sigma} relation in conjunction with optical spectrophotometric observations. We were able to classify their nebular emission line profiles due to our high-resolution spectra. Peculiarities in the line profiles such as sharp lines, wings, asymmetries, and in some cases more than one component in emission were verified. From a new independent homogeneous set of spectrophotometric data, we derived physical condition parameters and performed statistical principal component analysis. We have investigated the potential role of metallicity (O/H), H{beta} equivalent width (W{sub H{beta}}), and ionization ratio [O III]/[O II] to account for the observational scatter of the L-{sigma} relation. Our results indicate that the L-{sigma} relation for HIIGs is more sensitive to the evolution of the current starburst event (short-term evolution) and dated by W{sub H}{beta} or even the [O III]/[O II] ratio. The long-term evolution measured by O/H also plays a potential role in determining the luminosity of the current burst for a given velocity dispersion and age as previously suggested. Additionally, galaxies showing Gaussian line profiles present tighter correlations indicating that they are the best targets for the application of the parametric relations as an extragalactic cosmological distance indicator. Best fits for a restricted homogeneous sample of 45 HIIGs provide us with a set of new extragalactic distance indicators with an rms scatter compatible with observational errors of {delta}log L{sub H}{alpha} = 0.2 dex or 0.5 mag. Improvements may still come from future optimized observational programs to reduce the observational uncertainties on the predicted luminosities of HIIGs in order to achieve the precision required for the application of these relations as tests of cosmological models.

79 ASTRONOMY AND ASTROPHYSICS↗

Beam Normal Single Spin Asymmetry in Forward Angle Inelastic Electron-Proton Scattering using the Q-Weak Apparatus

The Q-weak experiment in Hall-C at the Thomas Jefferson National Accelerator Facility has made the first direct measurement of the weak charge of the proton through the precision measurement of the parity-violating asymmetry in elastic electron-proton scattering at low momentum transfer. There is also a parity conserving Beam Normal Single Spin Asymmetry or transverse asymmetry (B_n) on H_2 with a sin(phi)-like dependence due to two-photon exchange. If the size of elastic B_n is a few ppm, then a few percent residual transverse polarization in the beam, combined with small broken azimuthal symmetries in the detector, would require a few ppb correction to the Q-weak data. As part of a program of B_n background studies, we made the first measurement of B_n in the N-to-Delta(1232) transition using the Q-weak apparatus. The final transverse asymmetry, corrected for backgrounds and beam polarization, was found to be B_n = 42.82 ± 2.45 (stat) ± 16.07 (sys) ppm at beam energy E_beam = 1.155 GeV, scattering angle theta = 8.3 deg, and missing mass W = 1.2 GeV. B_n from electron-nucleon scattering is a unique tool to study the gamma^* Delta Delta form factors, and this measurement will help to improve the theoretical models on beam normal single spin asymmetry and thereby our understanding of the doubly virtual Compton scattering process. To help correct false asymmetries from beam noise, a beam modulation system was implemented to induce small position, angle, and energy changes at the target to characterize detector response to the beam jitter. Two air-core dipoles separated by ~10 m were pulsed at a time to produce position and angle changes at the target, for virtually any tune of the beamline. The beam energy was modulated using an SRF cavity. The hardware and associated control instrumentation will be described in this dissertation. Preliminary detector sensitivities were extracted which helped to reduce the width of the measured asymmetry. The beam modulation system has also proven valuable for tracking changes in the beamline optics, such as dispersion at the target.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗