Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Energy Resources, Interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Synchronization in electric power networks with inherent heterogeneity up to 100% inverter-based renewable generation

The synchronized operation of power generators is the foundation of electric power network stability and a key to the prevention of undesired power outages and blackouts. Here, we derive the conditions that guarantee synchronization in power networks with inherent generator heterogeneity when subjected to small perturbations, and perform a parametric sensitivity analysis to understand synchronization with varied types of generators. As inverter-based resources, which are the primary interfacing technology for many renewable sources of energy, have supplanted synchronous generators in ever growing numbers, the center of attention on associated integration challenges have resided primarily on the role of declining system inertia. Our results instead highlight the critical role of generator damping in achieving a stable state of synchronization. Additionally, we report the feasibility of operating interconnected electric grids with up to 100% power contribution from inverter-based renewable generation technologies. Our study has important implications as it sets the basis for the development of advanced control architectures and grid optimization methods that ensure synchronization and further pave the path towards the decarbonization of the electric power sector.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Planning Roadmap for DER Integration in India: Industry Best Practices and Resource Guide

Ensuring safe, reliable, cost-effective DER integration at scale requires holistic planning, broad stakeholder engagement, and should address key development areas such as standards adoption, equipment testing and certification, interoperability and cybersecurity, interconnection procedures, and advanced forecasting and DER management. Each of these areas currently represent significant challenges for utilities, regulators, OEMs, developers, and even consumers worldwide. India has already seen significant growth of DERs and has announced targets for substantial growth yet to come, with the potential for DERs to make up a non-negligible portion of the country's overall generation capacity. As such, it is of critical importance that Indian stakeholders consider the potential impacts of wide-spread adoption of DERs and take preemptive action related to the five development areas listed here, among others. India should consider strategies including the adoption of key DER standards related to interconnection, testing, and cybersecurity; enabling effective and secure communication channels for DER interoperability; testing and certifying DER equipment in accredited testing laboratories; building robust, streamlined interconnection procedures; and revamping legacy system planning structures to incorporate DERs in a holistic planning framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancing Distribution System Resiliency Using Grid-Forming Fuel Cell Inverter: Preprint

Legacy inverters interfacing distributed energy re-sources are traditionally grid-following (GFL) in nature. GFL assets typically follow real power and reactive power set points. Recently, inverters with grid-forming (GFM) capability are gaining attention as GFM assets can increase the resiliency of the distribution system under stressed conditions. These GFM inverters can use photovoltaics, batteries, or fuel cells as their energy source. In this paper, we present information on inverters interfacing fuel cell assets, specifically with GFM capability. By introducing a fuel cell powered GFM coupled with hydrogen production and storage, the GFM can continuously provide GFM activities during periods of low renewable resource availability, and/or during power outages exceeding typical electric battery duration. Finally, we present information on the need for updates on interconnection and interoperability standards that can be leveraged by utilities for including fuel cell inverters in their asset mix.

fuel cell inverters↗

Standardization of the Distributed Ledger Technology cybersecurity stack for power and energy applications

The global trend towards the integration of distributed energy resources is opening the doors to advanced, complex, and distributedmarketplaces. Such advanced ecosystems, where utility-owned and non utility-owned assets can contribute towards grid operations,generally require distributed communication and grid architectures, which can be supported by Distributed Ledger Technologies(DLTs). However, the potential of DLTs for long-term scalable solutions in operational technology applications has not been fullyutilized, partly due to the lack of standardization across and between different DLTs, as well as other supporting building blocks(e.g., communication protocols). This paper attempts to address this gap by proposing a DLT cybersecurity stack specificallydesigned for researchers, DLT technology developers, and end users (such as utilities). The DLT cybersecurity stack has beennotionally mapped to related cybersecurity components, namely: the Open Systems Interconnection (OSI) model, the TransmissionControl Protocol/Internet Protocol (TCP/IP) suite, and existing Smart Grid architecture frameworks. In addition, the paper discussesseveral cybersecurity implications, and demonstrates the potential uses of the DLT stack through multiple power and energy usecases. It is important to note that the stack can be also applied to the DLT use cases that are outside the power and energy domain.This work has been performed by the Cybersecurity Task Force under the IEEE P2418.5 Blockchain for Energy Standard workinggroup that is stationed under the IEEE Power and Energy Society’s Smart Buildings, Loads, and Customer Systems (SBLC)technical committee.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unintentional Islanding Detection Performance with Mixed DER Types

Most inverters for use in distribution-connected distributed energy resource applications (distributed generation and energy storage) are tested and certified to detect and cease to energize unintentional islands on the electric grid. The requirements for the performance of islanding detection methods are specified in IEEE 1547-2018, and specified conditions for certification- type testing of islanding detection are defined in IEEE 1547.1. Such certification-type testing is designed to ensure a minimum level of confidence that these inverters will not island in field applications. However, individual inverter certification tests do not address interactions between dissimilar inverters or between inverter and synchronous machines that may occur in the field. This work investigates the performance of different inverter island detection methods for these two circumstances that are not addressed by the type testing: 1) combinations of different inverters using different types of islanding detection methods, and 2) combinations of inverters and synchronous generators. The analysis took into consideration voltage and frequency ride- through requirements as specified in IEEE 1547-2018, but did not consider grid support functionality such as voltage or frequency response. While the risk of islanding is low even in these cases, it is often difficult to deal with these scenarios in a simplified interconnection screening process. This type of analysis could provide a basis to establish a practical anti- islanding screening methodology for these complex scenarios, with the goal of reducing the number of required detailed studies. Eight generic Groups of islanding detection behavior are defined, and examples of each are used in the simulations. The results indicate that islanding detection methods lose effectiveness at significantly different rates as the composition of the distributed energy resources (DERs) varies, with some methods remaining highly effective over a wide range of conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Wendell

This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

What Role Do Aggregators Play in Power System Security and Resilience?

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. In surveying the current state-of-the-art across different but interconnected topics, we illustrate how aggregators can be power system participants that enhance grid security. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

Review of Power System Support Functions for Inverter-Based Distributed Energy Resources - Standards, Control Algorithms, and Trends

Penetration of renewable energy in power systems has been increasing in the past decades in response to increased global electricity demand and concerns for the environment. Distributed energy resources (DERs) based on renewables have experienced rapid growth thanks to the incentive programs and broad-based participation. With the growing prevalence of DERs, the risk of grid instability and vulnerability increases due to the intermittent nature of renewable energy. At the same time, the voltage and frequency deviation problems emerge more often when the reverse power flow occurs under supply-demand imbalance in distributed power systems. Standards and grid codes have been issued for DER inverters to interconnect with the distribution grid. The updated standard and grid codes expect DERs to provide a variety of power system support functions in order to incorporate higher DER penetration and to maximize DER value to the grid. This paper provides an overview of the power system support functions from renewable DER inverters, which are categorized as: voltage regulation by active/reactive power control, frequency regulation by active power control, voltage ride-through, and frequency ride-through. The benefits and drawbacks of each algorithm are presented and compared with its predecessor, manifesting the logic in the evolution of the algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy-water interdependencies across the three major United States electric grids: A multi-sectoral analysis

As water availability and timing of delivery fluctuates and the US electric grid sees rapid transformation and reconfiguration under decarbonization and resource adequacy strategies, there is a critical need for information and data that supports understanding the water-energy interdependency landscape. The United States currently lacks comprehensive data, informative visualizations, and analysis of energy-water interdependencies at scales necessary to support resource and operational decision-making. This article provides US electricity interconnection-level Sankey diagrams that show the relative reliance of water and energy across various economic sectors. A deeper analysis is additionally provided at the county level to illustrate trends and potential opportunities related to resiliency and efficiency in multi-sectoral water and energy flow distributions and intensities. We find that the electricity interconnections in the US vary dramatically in their water and energy interdependencies across applications and economic sectors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Graph-Net with Node Embeddings to Detect False Data Injection Attacks in Photovoltaic Systems

Distributed energy resources (DER) contribute to the operational stability of the larger power grid both at utility-scale as well as commercial and residential scales in aggregated forms. These DER in-turn are susceptible to increasing cyber threats. An adversary can plug into the same local network that a field photovoltaic (PV) system uses to interconnect its data loggers and inverters and manipulate certain measurements collected from the network or trick existing irradiance and inverter readings through false data injection attacks (FDIA). Control routines that rely on these measurements can propagate the false data, impacting critical decisions that result in a suboptimal operation or even cause intentional harm leading to inverter-tripping or unscheduled loads that need to be shed. To detect FDIA in PV systems, the paper introduces an attention-based graph neural network with node embeddings and applied it to a simple prototypical DC-coupled microgrid with PV, energy storage, and load. The algorithm shows a detection accuracy of up to 98.95%. The proposed FDIA detection technique will provide micro-grid operators with an effective method to safeguard their systems, guaranteeing the secure and reliable operation.

Parvez, Imtiaz [Utah Valley University]↗

Comparative Assessment of Tactics to Improve Primary Frequency Response Without Curtailing Solar Output in High Photovoltaic Interconnection Grids

Power grid primary frequency response will be significantly impaired by Photovoltaic (PV) penetration increase because of the decrease in inertia and governor response. PV inertia and governor emulation requires reserving PV output and leads to solar energy waste. This paper exploits current grid resources and explores energy storage for primary frequency response under high PV penetration at the interconnection level. Based on the actual models of the U.S. Eastern Interconnection grid and the Texas grid, effects of multiple factors associated with primary frequency response, including the governor ratio, governor deadband, droop rate, fast load response. are assessed under high PV penetration scenarios. In addition, performance of batteries and supercapacitors using different control strategies is studied in the two interconnections. The paper quantifies the potential of various resources to improve interconnection-level primary frequency response under high PV penetration without curtailing solar output.

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solid State Power Substations (SSPS): A Multi-Hierarchical Architecture from Substation to Grid Edge

With the growing deployment of distributed generation, or power electronic interfaced renewable energy and storage technologies, the nature and behavior of the grid is changing. Synchronous machine-driven asset contributions to the generation mix are shrinking, leading to concerns regarding grid stability. Furthermore, the scale of smaller distributed PE resources needed for managing the electrical network could dwarf the existing system leading to more complex optimization problems and communication interconnections. This paper introduces the concept of a hierarchal system of controllers that spans the grid edge or the customer end to distribution scale substations or solid-state power substation (SSPS). This concept focuses on minimizing the number of interfaces and optimization considerations in the grid by clustering resources into nodes and hubs. The work validates the concept in a controller hardware-in-the-loop (cHIL) platform.

Chinthavali, Madhu Sudhan↗

Distributed Generation Cost-Benefit and Ratemaking Considerations for Idaho

This memo was completed through the Grid Modernization Laboratory Consortium (GMLC), a strategic partnership between the U.S. Department of Energy (DOE) and the national laboratories to bring together leading experts, technologies, and resources to collaborate on the goal of modernizing the nation’s grid. The GMLC was established as part of the DOE Grid Modernization Initiative to accelerate the development of technology, modeling analysis, tools, and frameworks to help enable grid modernization. Special thanks to DOE project leads, Larry Mansueti and Elaine Ulrich, and the laboratory project lead for this effort, Peter Cappers from Lawrence Berkeley National Laboratory (LBNL). The Idaho Public Utility Commission (IPUC) Staff requested this technical assistance to improve their understanding of the emerging, complex, and consequential issues around distributed energy resource (DER) rate design to help the staff achieve its goal of making a fair, just, and reasonable rate design recommendation with respect to Order 34147 under Case No. IPC-E-17-13. 2 PNNL-28285 In Case No. IPC-E-17-13, Idaho Power requested authorization from the IPUC to establish new rate schedules for residential and small general service customers with on-site generation. The IPUC’s Order No. 34046 of May 9, 2018 authorized Idaho Power to (IPUC 2018a): Close Schedule 84 and create Schedule 6 for residential on-site generators and Schedule 8 for small general service on-site generators; Acknowledge smart inverter technology; Make proposed revisions to interconnection Schedule 72; Open an Idaho Power-specific docket to “to comprehensively study the costs and benefits of on-site generation on Idaho Power’s system, as well as proper rates and rate design, transitional rates, and related issues of compensation for net excess energy provided as a resource” to Idaho Power; File a study with the IPUC “exploring fixed-cost recovery in basic charges and other rate design options prior to its next general rate case.”

24 POWER TRANSMISSION AND DISTRIBUTION↗

Categorizing distributed wind energy installations in the United States to inform research and stakeholder priorities

Abstract Background Distributed wind energy adoption in the United States can contribute to the diverse portfolio of energy technologies needed to achieve ambitious decarbonization goals. However, with limited deployment to date, the current distributed wind market must be better understood; these efforts will support the range of stakeholders who will drive successful deployment. This article first distinguishes three categories of distributed wind from existing literature: (1) behind the meter, (2) intended for explicit local load, and (3) physically distributed. A novel methodology to classify individual wind installations into each of these categories is then presented and applied to two data sets of wind installations in the United States to categorize and illuminate distinct segments in the distributed wind market. Results Physically distributed installations, constituted by small to moderately sized projects serving local loads on distribution systems solely because of their proximity to them, account for the highest amount of capacity but the lowest number of installations out of the three categories. The inverse is true for behind-the-meter installations, which are used to serve on-site loads. Installations intended for explicit local load, which are interconnected on the utility side of the distribution system and intentionally built to provide energy to loads on the same distribution system, rank in the middle for both installed capacity and number of installations. Conclusions Distributed wind energy deployment in the United States is geographically widespread, but the extent to which a single category is developed in each state varies. Policies, wind resources, and broad energy technology trends contribute to these deployment patterns. By identifying the extent to which each category of installations exists, decision-makers are empowered with data necessary to tailor research and development programs and address stakeholder priorities through policy and other means, ultimately supporting future deployment.

17 WIND ENERGY↗

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comminty Geothermal: Planning and Design of a Heating and Cooling System in Framingham, Massachusetts

These reports, plans, and drawings review the achievements of Home Energy Efficiency Team (HEET) and its partners to plan and design a network of interconnected ground-source heat pump systems, or geothermal network, in an area encompassing multiple environmental justice (EJ) neighborhoods in the City of Framingham, MA. The materials provided in this dataset include, a) stakeholder and design best practices, b) study on optimal method to interconnect geothermal loops, c) guidelines for monitoring and metering, d) operations and maintenance plans, e) permitting guidelines and f) 10-day driller tutorial curriculum. These materials can guide the efficient and ethical design of future geothermal networks nationwide. The capacity of the system is estimated at 217 tons and is designed to provide 100% of heating and cooling needs for the buildings connected to the loop. In this project, 80 boreholes are used as the main thermal resources, the distribution system (or loop) consists of 0.61 miles of an 8-inch single-pipe at ambient temperature, with the capacity to connect 44 buildings, including 13 apartment buildings from the Framingham Housing Authority, one transitional home, one school building and 29 single family homes. While Framingham already has a geothermal network loop that is currently in the commissioning stage, our proposed project is unique because it is the first utility-led expansion loop (2nd loop) project that will connect to an adjacent existing geothermal loop (1st loop) in a pre-existing neighborhood. Both the 1st and 2nd loops are being installed, owned and operated by Eversource Energy, the utility Deployment Partner.

15 GEOTHERMAL ENERGY↗