Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distribution system state estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

180 records · Page 10

Optimization-Based Dynamic Voltage Support of Microgrids Using Energy Storage Systems

A microgrid network is characterized by a high R/X ratio, making the voltage more sensitive to active power changes compared to bulk power systems, where the voltage is regulated primarily by reactive power. Due to its sensitivity, voltage control approaches for microgrids should also consider the active power input coupling, making it very different from conventional power systems. Additionally, as the energy costs associated with active and reactive powers are different and the operational conditions of microgrids connected to active distribution systems vary over time, the ideal controller to provide voltage support must be flexible enough to handle these technical and operational constraints. This paper proposes a model predictive control approach to provide dynamic voltage support using energy storage systems. This approach uses a simplified predictive model of the system to solve the model predictive control problem. By proper selection of model predictive control weighting parameters, the quality of service provided can be adjusted to achieve the desired performance. A simulation study in MATLAB/Simulink validates the proposed approach for the Cordova, Alaska microgrid. Results show that the performance of the voltage support can be adjusted depending on the choice of weight and constraints of the controller.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electronic Spin Relaxation and Clustering in High-Pressure High-Temperature Synthesized Microcrystalline Diamond Particles with Reduced Nitrogen Content

The negatively charged nitrogen-vacancy (NV – ) color center in diamonds is widely studied because of numerous applications of this unique quantum system in sensing and quantum information sciences. While substitutional nitrogen is required to form the NV – centers in diamond, it also yields other paramagnetic defects─primarily the neutrally charged substitutional nitrogen centers (P1)─that decrease NV – spin coherence, which in turn degrades performance in applications. Herein, we investigate high-pressure high-temperature synthesized diamond microparticles (ca. 140–185 μm) having lower─ranging from 3 to 38 ppm─than the typical nitrogen content of type 1b diamond ( ca. 100 ppm and higher) typically used for the production of fluorescent diamond particles with NV – centers. A suite of electron paramagnetic resonance, optically detected magnetic resonance, and nuclear magnetic resonance methods are used to characterize spin properties of P1 and NV – centers in the particles. Upon decreasing the nitrogen content from 29 to 3 ppm, the ensemble NV – T 2 relaxation time increased by about 3-fold as measured directly in the Hahn Echo experiment at magnetic field of 1.2 T. Analysis of electronic relaxation of P1 centers revealed the existence of at least two distinct populations of P1 centers, consisting of fast and slower relaxing spins and allowed for an estimation of local concentrations. Even with <10 ppm nitrogen contents, the analysis indicated a highly heterogeneous distribution of P1 centers, suggesting the possibility of P1 spin clustering even at low nitrogen concentrations. The combined data demonstrate that the particles prepared from HPHT diamond with a low nitrogen content offer improved spin properties that are beneficial for NV – sensing applications.

Carbon↗

Real-Time Multiregional Market-to-Market Congestion Management Through Exchange of Relief Cost Curve

This paper introduces a novel method for multiregional market-to-market (M2M) coordinated congestion management. It identifies shortcomings in existing M2M approaches, where Regional Transmission Organizations (RTOs) exchange shadow prices and relief requests to optimize congestion relief allocations across interconnected regions. Two methods are proposed to enhance flow and price convergence. The first method proposes that both Regional Transmission Organizations (RTOs) use state-estimator flows directly to determine relief requirements, eliminating delays and potential oscillations caused by using market flows calculated from the prior period under existing M2M approach. The second method involves exchanging transmission relief cost curves, enabling each RTOs to integrate other RTOs' relief costs curve into its real-time security-constrained economic dispatch (SCED). This method can effectively extend the coordination to multiple transmission lines and across more than two RTOs. The alternating direction method of multipliers (ADMM) is also applied to the M2M coordination problem and compared with the proposed methods. Case studies on small and large-scale systems demonstrate the effectiveness of these approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NLR's FleetDNA Speed Distributions for EPA MOVES

The U.S. Environmental Protection Agency (EPA) MOtor Vehicle Emission Simulator (MOVES) models mobile sources of air toxics at small and large scales across the Unites States. Vehicle speed distributions based on the type of vehicle, type of road traveled, and hour of the day are inputs into MOVES. In conjunction with vehicle miles traveled (VMT) inputs, they are used to estimate total operation time and select the relevant driving cycles from which running operating modes and emissions are estimated. In an ongoing research effort, the National Laboratory of the Rockies (NLR) partnered with the EPA to provide default average speed data for heavy-duty vehicles based on NLR's FleetDNA database and the Bourns College of Engineering - Center for Environmental Research and Technology (CE-CERT) data set from the University of California, Riverside.

33 ADVANCED PROPULSION SYSTEMS↗

Grid Resiliency using Hydro-based Microgrids During Wildfires

The primary objective of this project is to assess the techno-economic viability of hydropower resources with supplementary investments, including microgrid controllers, storage solutions, load banks, additional generation like diesel generators, communication links, and transmission infrastructure. The aim is to enable these systems to operate autonomously (in islanded mode) and ensure grid resiliency during and after wildfire events. The project seeks to establish a comprehensive framework for setting up hydropower-based microgrids, from risk estimation to final investment decisions. These microgrids can provide critical support during emergencies and offer additional grid stability and revenue opportunities during regular operations and other system contingencies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A neural-network-enhanced parameter-varying framework for multi-objective model predictive control applied to buildings

Management of the electrical grid is becoming more complex due to the increased penetration of alternative energy generation technologies and a broadening diversity of electric loads. This complexity creates challenges in balancing demand and generation that can increase the potential for grid instabilities. One effective way to address this issue is to leverage previously unexploited demand flexibility through advanced control strategies. In this work, we propose an advanced control method, called adaptive neural parameter-varying model predictive control (ANPV-MPC), to control the temperature and energy consumption of a building via its Heating, Ventilation, and Air Conditioning system. ANPV-MPC combines key ideas in parameter-varying control, adaptive control, and online learning strategies to bridge the gap between computationally efficient linear model predictive control and more accurate nonlinear model predictive control. The novelty in ANPV-MPC is the use of a physics-inspired Bayesian neural network to estimate the coefficients of the parameter-varying linear control model. The Bayesian neural network additionally provides uncertainty estimates, triggering online training to capture evolving building system conditions. We show that ANPV-MPC can approximate the building system dynamics with a 28.39% higher accuracy than traditional linear model predictive control, resulting in 36.23% better control performance without increasing complexity of the optimal control problem. ANPV-MPC also adapts in real time to previously unseen conditions using online learning, further improving its performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Estimating Flexibility Envelopes for Residential Customers From Utility Smart Meter Data: Preprint

Demand response from residential customers has significant potential to support power system operations, but accurate flexibility estimation is challenging due to the limited resolution of advanced metering infrastructure (AMI) data. Most utility AMI measurements are recorded at hourly intervals, with only a small portion at higher resolutions, and even fewer households have appliance-level energy usage data. To address this issue, this paper proposes a two-stage long short-term memory (LSTM) framework for estimating household flexibility envelopes from low-resolution AMI data. In the first stage, the heating, ventilating, and air-conditioning (HVAC) load and non-HVAC loads are estimated by using a model trained on a small set of households with appliance-level profiles. These estimated data are then used to compute the upper- and lower-flexibility bounds, which are subsequently down-sampled to lower-resolution data. In the second stage, these flexibility bounds serve as training inputs for another LSTM model, enabling direct prediction of flexibility envelopes for households with only hourly AMI data. This method is validated using Pecan Street data from two different areas, and the results demonstrate its applicability and effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Oak Ridge National Laboratory EAGLE-I TM : Modeling Electric Utility County Customers for Situational Awareness

During natural hazard events (hurricanes, wildfires, earthquakes, etc.) and recent man-made events (e.g., cyber attacks), the exchange of near real-time, spatially refined data within the response community is critical. The EAGLE-I$^{TM}$ platform is one tool that facilitates this data for decision makers within the energy sector. While much information can be collected and integrated into the system directly, other pertinent data must be augmented by other derived data products to enhance the information and allow for a consistent evaluation of on-the-ground conditions. One such data set that requires the addition of other derived data is the electric utility customer outage data that is aggregated to the county level within the EAGLE-I application. Without a county customer data set, outages can only be compared on total counts, which gives greater importance to higher population outages. Including an electric utility customer data set at the county level allows for these outage counts to be converted to percent outages and brings a consistent classification of outages and equal importance to all outages. To achieve this, several available data sets were combined and spatial disaggregation techniques were employed to model customer estimates at the county scale. This paper presents the approach to produce this data for the United States and lessons learned from working with these disparate data sets. Data validation is provided, where possible, and limitations of the model and possible improvements are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bias Correction and Statistical Downscaling of Solar Radiation Using NA-CORDEX and the NSRDB

The current state-of-art for estimating long-term PV production uses long-term estimates of solar radiation variables, such as global horizontal irradiance (GHI), from previous years. This data is used in models such as the System Advisor Model (SAM) or PYSyst to predict annual production for a PV plant. This information is then used to estimate the production over the next 20 years (a typical plant lifetime) under the assumption that the variability over the current period is representative of the future. As the PV industry moves to extend plant lifetimes to 50 years the current assumptions of representativeness of weather may not be appropriate. This is especially true as our climate changes rapidly. To assess long-term PV production, future projections for solar radiation based on projected carbon emissions are readily available in regional and global climate models. However, climate model projections contain inherent biases that may need to be corrected for accurate analysis of future projections of climate variables. Several studies have analyzed projections of solar radiation for future years, however the accuracy of the model output compared to current and historic data has not been widely studied. Chen (2021) showed that available climate models do not accurately represent solar radiation in some cases, over-projecting GHI at the surface while under-projecting its obstructions, such as clouds and aerosols. This works aims to (1) increase understanding of the accuracy of solar radiation currently available in global and regional climate models and (2) implement bias correction through linear models based on reanalysis data compared to observed solar radiation. The latter aim will be conducted using available observed solar radiation data and modeled data from several regional climate models (RCMs). The bias correction method will be applied to projections of solar radiation resulting in a more accurate representation of the future of solar production.

climate data↗

Prioritizing Uncertainties in Hydrogen Contribution to Risk in Post-Crash Outcomes for Rail

This report presents analysis from Sandia National Laboratories predicting contributions to risk associated with the use of hydrogen technology for rail. Event sequence diagrams are used to describe possible accident scenarios and progressions. Initiating event frequencies and branch event probabilities for each scenario are quantified with uncertainty using distributions fit to Federal Railroad Administration and U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration data on applicable accidents from 2000 to 2020. Uncertainty is propagated through the event sequence diagram to estimate the frequency and conditional probability of accident end states. The analysis identifies four scenarios with significant contributions to risk from hydrogen that are predicted to occur relatively frequently, which may inform priorities for reducing uncertainty. These scenarios are 1) overpressure events resulting from collisions with hydrogen release due to mechanical damage and delayed ignition, 2) jet fire events resulting from collisions with hydrogen release due to mechanical damage and immediate ignition, 3) jet fires resulting from fire or explosion initiating events involving the hydrogen tank and correct operation of the thermally-activated pressure relief device (TPRD) subsequent to the thermal insult, and 4) pressure burst resulting from fire or explosion initiating events involving the hydrogen tank and failure of the TPRD. Delayed and immediate hydrogen ignition probabilities are identified as being highly uncertain and potential candidates for reducing conservatism in the predicted frequencies for these two scenarios.

08 HYDROGEN↗

Improving Trustworthiness of Data-Driven Power Grid Contingency Analysis With Bayesian Residual Graph Neural Networks

The evolving energy landscape requires novel tools to efficiently perform contingency analysis and reliability assessment of power grids, potentially in real-time. The high computational cost of traditional power flow solvers limits their applicability in practice. Machine learning (ML) surrogates such as deep neural networks (NNs) accelerate power flow solvers computations, enabling high-order contingency analysis and real-time decision-making by learning highly nonlinear functions and integrating grid topology via graph architectures. However, (graph) NNs lack predictive power away from training data and do not provide predictive confidence estimates. Here, we present a Bayesian residual graph NN that integrates knowledge from low-fidelity data via residual training and embeds granular quantification of uncertainties, improving trustworthiness critical for high-consequence decision-making. Applying Bayesian concepts to NNs is challenging due to the high-dimensionality of both the parameter space, complicating derivation of a meaningful prior, and the output space in large grid systems, requiring enhanced techniques to assess the predicted high-dimensional uncertainties. Our contributions include: (1) Deriving a prior for fully connected and graph NNs that leverages low-fidelity data to guide mean predictions and appropriately control prior predictive uncertainty. (2) Integrating this prior within an ensembling with anchoring scheme for efficient approximate posterior inference. (3) Deriving enhanced metrics to assess accuracy of both the mean and uncertainty predictions in high dimensions, appropriately accounting for correlations propagated through graph layers. The resulting Bayesian residual graph NN is tested on a contingency analysis task for 14-bus and 118-bus grids.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Spatially Resolved Domicile Charging Demands for Light-, Medium-, and Heavy-Duty Electric Vehicles in Virginia

The use of plug-in electric vehicles (PEVs) and resulting grid impacts are likely to grow rapidly, and evaluation of optimal smart charge management and grid integration strategies is warranted now. Evaluating distribution grid impacts requires fine-grained models of PEV operations to estimate charging loads across diverse vehicles at high spatial resolution. We propose such a model and consider a high-electrification scenario in Richmond and Newport News, Virginia. Our framework considers four categories of vehicle that are amenable to early aggressive electrification: light-duty passenger vehicles (LDV), trucks and vans with a focus on delivery or other local operations, school buses, and transit buses. These vehicles have a relatively consistent domicile, reducing the need for public charging infrastructure rollout to electrify. We apply a recent LDV model and propose new models for each vocation of medium- and heavy-duty vehicle, leveraging telematics data. We demonstrate our framework in Virginia and find energy demands in the region may total 15 GWh day, with most consumed by LDV. However, considering power demand at high spatial resolution reveals a different trend: LDVs have relatively small peak loads at specific sites (peak site demand around 800 kW) compared to average and high demand medium- and heavy-duty vehicle charging sites (peak site demand around 6,000 kW at a transit bus depot, 1,500 kW at a local freight hub, and 1,000 kW at a school). Our framework yields insights on the relative impacts of each vocation and enables future work to tailor grid integration strategies to each vehicle category.

33 ADVANCED PROPULSION SYSTEMS↗

The value of integrating a geothermal district heating system into a microgrid

As electrical grids increasingly rely on variable renewable energy, maintaining reliability and cost efficiency becomes more complex. To address these challenges, this study analyzed the integration of geothermal district heating as a grid-responsive thermal resource within a microgrid in Tuttle, Oklahoma. Building energy modeling using EnergyPlus estimated annual district heating demand at 2.9 GWh, with a peak load of 2.8 MW th . Techno-economic analyses were conducted to meet the heating demand under three geothermal scenarios, varying by production depth, flow rate, and thermal output, each supplemented by natural gas peaking boilers. In parallel, equivalent electrical load profiles were developed using typical coefficients of performance (COPs) for air-source heat pumps and electric boilers to establish an electrified baseline scenario. A complete end-use electrical load profile was also developed for the microgrid using Cambium dataset. The modeling results demonstrated reliable and economic operation of the geothermal systems over 30 years, with COPs ranging from 2.6 to 8.9 and the lowest levelized heating cost at $\$$54.6/MWh. Geothermal integration reduced electricity consumption by up to 94.7 % compared to the non-geothermal base case, yielding annual energy savings of up to $\$$803 k. Avoided grid costs ranged from $\$$65 k–$\$$147 k per year, with individual events avoiding up to $\$$4,863 per hour. Grid-responsive operation further reduced wholesale energy costs by 53–56 %. These findings demonstrate geothermal heating, traditionally treated as a non-grid-responsive thermal resource, can be reconfigured to support dynamic grid services, offering a scalable pathway to enhance reliability and reduce costs in renewable-rich microgrids and district heating networks.

15 GEOTHERMAL ENERGY↗

Evaluating the potential of short-term instrument deployment to improve distributed wind resource assessment

Distributed wind projects, which are connected at the distribution level of an electricity system or in off-grid applications to serve specific or local energy needs, often rely solely on wind resource models to establish wind speed and energy generation expectations. Historically, anemometer loan programs have provided an affordable avenue for more accurate onsite wind resource assessment, and the lowering cost of lidar systems has shown similar advantages for more recent assessments. While a full 12 months of onsite wind measurement is the standard for correcting model-based long-term wind speed estimates for utility-scale wind farms, the time and capital investment involved in gathering onsite measurements must be reconciled with the energy needs and funding opportunities that drive expedient deployment of distributed wind projects. Much literature exists to quantify the performance of correcting long-term wind speed estimates with 1 or more years of observational data, but few studies explore the impacts of correcting with months-long observational periods. This study aims to answer the question of how short you can go in terms of the observational time period needed to make impactful improvements to model-based long-term wind speed estimates. Three algorithms, multivariable linear regression, adaptive regression splines, and regression trees, are evaluated for their skill at correcting long-term wind resource estimates from the European Centre for Medium-Range Weather Forecasts Reanalysis version 5 (ERA5) using months-long periods of observational data from 66 locations across the US. On average, correction with even 1 month of observations provides significant improvement over the baseline ERA5 wind speed estimates and produces median bias magnitudes and relative errors within 0.22 m s −1 and 4 percentage points of the median bias magnitudes and relative errors achieved using the standard 12 months of data for correction. However, in cases when the shortest observational periods (1 to 2 months) used for correction are not well correlated with the overlapping ERA5 reference, the resultant long-term wind speed errors are worse than those produced using ERA5 without correction. Summer months, which are characterized by weaker relative wind speeds and standard deviations for most of the evaluation sites, tend to produce the worst results for long-term correction using months-long observations. The three tested algorithms perform similarly for long-term wind speed bias; however, regression trees perform notably worse than multivariable linear regression and adaptive regression splines in terms of correlation when using 6 months or less of observational data for correction. Translating the analysis to wind energy, median relative errors in the capacity factor are on average within 10 % using 1 month of training. If the observation period used for correction is not well correlated with the reference data, however, misrepresentation of the observed capacity factor can be substantial. The risk associated with poor correlation between the observed and reference datasets decreases with increasing training period length. In the worst-correlation scenarios, the median capacity factor relative errors from using 1, 3, and 6 months are within 47 %, 26 %, and 16 %, respectively.

17 WIND ENERGY↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗